Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 ML20078P8251995-02-10010 February 1995 Proposed Tech Specs 2.10 to Relocate Requirements for Incore Instrumentation Sys ML20077S1691995-01-0909 January 1995 Proposed Tech Specs,Reflecting Deletion of Requirements for Toxic Gas Monitoring Sys ML20078G8981994-11-11011 November 1994 Proposed Tech Specs 5.2 & 5.5,reflecting Administrative Changes ML20024J3921994-10-0707 October 1994 Proposed Tech Specs,Deleting SRs in TS 3.6(3)a for Eight Raw Water Backup Valves to Containment Cooling Coils,Deleting SRs in TS 3.2,Table 3-5,item 6 for 58 Raw Water Valves & Revising Basis of TS 2.4 to Reflect Changes ML20069H9261994-06-0606 June 1994 Proposed Tech Specs Incorporating Changes to Credit Leak Before Break Methodology to Resolve USI A-2, Asymmetrical Blowdown Loads on Rcps ML20069D8451994-05-25025 May 1994 Proposed Tech Specs Requesting one-time Schedular Exemption from 10CFR50.36a(2) ML20062N4211993-12-28028 December 1993 Proposed TS Tables 3-1 & 3-2 Re Min Frequencies for Checks, Calibrs & Testing of RPS & Min Frequencies for Checks, Calibrs & Testing of ESFs & Instrumentation & Controls, Respectively LIC-93-0228, Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys1993-08-20020 August 1993 Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys ML20045H1791993-07-12012 July 1993 Proposed TS 2.14,Table 2-1,Item 6.b Re ESF Sys Initiation, Degraded Voltage Setting Limits LIC-93-0159, Proposed Tech Specs Incorporating Administrative Changes1993-06-17017 June 1993 Proposed Tech Specs Incorporating Administrative Changes ML20128E5341993-02-0808 February 1993 Proposed Tech Specs Deleting Section 5.9.4 Re Radioactive Effluent Release Rept.Draft Chemistry Manual Procedure Encl ML20128C0461993-02-0101 February 1993 Proposed TS Figures 2-1A & 2-1B Re pressure-temp Limits for Heatup & Cooldown,Respectively 1999-05-26
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR LIC-98-0141, SG Eddy Current Test Rept for 1998 Refueling Outage. with1998-10-27027 October 1998 SG Eddy Current Test Rept for 1998 Refueling Outage. with ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 1999-05-26
[Table view] |
Text
4 O '-
.'q' u
,3'. 4 f
-i I
f Y
ATTACHMENT A I
'h
{
l 5
9003260283 900319 .
. PDR ADOCK 05000283 PDC .
I
5.0 ADMINISTRATIVE CONTR0Lji 5.1 Resoonsibility The Manager - Fort Calhoun Station shall be responsible for overall 5.1.1 facility-operation and shall delegate in writing the succession to this responsibility during his absence.
5.2 Oroanization 5.2.1 Onsite and offsite organizations shall be established for unit operation and corporate management, respectively. The onsite and offsite organizations shall include the positions for activities affecting the -
safety of the nuclear power plant.
- a. Lines of authority, responsibility, and communication shall be established and defined for the highest management levels through intermediate levels to and including'all operating organization positions. These relationships shall be documented and updated, as appropriate, in the form of organizational charts, functional descriptions of departmental responsibilities and relationships, and job descriptions for key personnel positions, or in equivalent forms of documentation. These requirements shall be documented in the USAR.
- b. The Manager - Fort Calhoun Station shall be responsible for overall unit safe operation and shall have control over those onsite activities necessary for safe operation and maintenance of the plant.
L c. The Senior Vice President - shall have corporate responsibility l for overall plant nuclear safety and shall take any measures needed to ensure acceptable performance of the staff in operating, maintaining, and providing technical support to the plant to ensure nuclear safety.
- d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to
- the appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence from operating i
pressures.
5.2.2 Plant Staff The plant staff organization shall be as described in Chapter 12 of the l USAR and shall function as follows:
- a. The minimum number and type of licensed and unlicensed operating Table 5.2-1.
5-1 Amendment No. EJ,7%,7E,JpJ,JJE,JJ9
~
t 5.0- ADMINISTRATIVE CONTROLS A
5.5.1.7 b. Render determinations in writing with regard to whether or not each item considered under 5.5.1.6(a) through (e) above constitutes an unreviewed safety question,
- c. Provide immediate written notification to the Division Manager
- Nuclear Operations and the Safety Audit and Review Committee of disagreement between the Plant Review Committee and the Manager - Fort Calhoun Station; however, the Manager - Fort Calhoun Station shall have responsibility for resolution of. ,
such disagreements pursuant to 5.1.1 above.
Records 5.5.1.8 The Plant Review Committee shall maintain written minutes of each meeting and copies shall be provided to the Division Manager -
Nuclear Operations and Chairman of the Safety Audit and Review Committee.
5.5.2 Safety Audit and Review Committee (SARC)
Function l
! 5.5.2.1 The Safety Audit and Review Committee shall function to provide the independent review and audit of designated activities in the areas of:
a, nuclear power plant operation
- b. nuclear engineering I c. chemistry and radiochemistry
- d. metallurgy e, instrumentation and control f.- radiological safety
- g. mechanical and electrical engineering
- h. quality assurance I
Composition 5.5.2.2 The Safety Audit and Review Committee shall be composed of:
Chairman: Division Manager - Nuclear Services Member: Senior ~Vice President Member: Division Manager - Nuclear Operations Member: Division Manager - Production Engineering Member: Manager - Fort Calhoun Station Member: Manager - Radiological Services Member: Qualified Consultants as Required and as Determined by SARC Chairman 5-5 Amendment No. EE,9J,99,JpJ,JJE,JJS L
5.0 -ADMINISTRATIVE CONTROLS j 5.5.2.8 c. The Fort Calhoun Station Emergency Plan and implementing procedures at least once every twelve months.
- f. The Site Security Plan and implementing procedures at least once every twelve months.
- g. The Safeguards Contingency Plan and implementing procedures at least once every twelve months.
- h. The Radiological Effluent-Program including the Radiological Environmental Monitoring Program and the results thereof, the Offsite Dose Calculation Manual and implementing procedures, and the Process Control Program for the solidifications of radioactive waste at least once per 2 years.
- 1. Any other ares of facility operation considered appropriate by the Safety Audit and Review Committee or the Senior Vice President. l Authority 5.5.2.9 The Safety Audit and Review Committee shall report to and advise the Senior Vice President on those areas of responsibility specified in l Sections 5.5.2.7 and 5.5.2.8.
Records
' 5.5.2.10 Records of Safety Audit and Review Committee activities shall be prepared, approved and distributed as indicated below:
- a. Minutes of each Safety Audit and Review Committee meeting shall be prepared, approved and forwarded to the Senior Vice President I within 14 days following each meeting,
- b. Reports of reviews encompassed by Section 5.5.2.7e, f, g, h, and i above shall be prepared, approved and forwarded to the Senior Vice President within 14 days following completion of the review. l
- c. Audit reports encompassed by Section 5.5.2.8 above shall be forwarded to the Senior Vice President and to the responsible l management positions designated by the Safety Audit and Review Committee within 30 days after completion of the audit.
5-8 Amendment flo. Ef,EE,9J,J9J,JJE,JJS r
U
~
5.0 ADMINISTRATIVE CONTROLS 5.11.l' In ' lieu of the " control device" or " alarm signal" required by paragraph 20.203(c)(2) of 10 CFR 20, each high radiation area (as defined in 6 20.202(b)(3) of 10 CFR 20) in which the intensity of radiation is 1000 mrem /hr or less shall be barricaded and conspicuously posted as a l high radiation area and entrance thereto shall be controlled by required issuance of a Radiation Work Permit.* Any individual or group of individuals permitted to enter such areas shall be provided with or accompanied by one or more of the following:
- a. A radiation monitoring device which continuously indicates the radiation dose rate in the area. .
- b. A radiation monitoring device which continuously integrates the
' radiation dose rate in the area and alarms when a preset integrated dose is received. Entry into such areas with this monitoring device may be made after the dose rate level in the area has been established and personnel have been made knowledgeable of them,
- c. An individual qualified in radiation protection procedures who is equipped with a radiation dose rate monitoring device.
Individual shall be responsible for providing positive control over the activities within the area and shall perform periodic radiation surveillance at the frequency specified by the Supervisor-Radiation Protection in the Radiation Work Permit. l 5.11.2 The requirements of 5.11.1, above, shall also apply to each high radiation area in which the intensity-of radiation is greater than 1000 mrem /hr (Very High Radiation Area). In addition, locked doors.
shall be provided to prevent unauthorized enter into such areas and the keys shall be maintained under the administrative control'of the Shift Supervisor on duty and/or the Supervisor-Radiation Protection I with the following exception:
- a. In lieu of the above, for accessible localized Very High Radiation areas located in large areas such as containment, where no lockable enclosure exists in the immediate vicinity of the Very High Radiation area to control access to the Very High Radiation area and no such enclosure can be readily constructed, then the Very High Radiation area shall be:
l i. roped off such that an individual at the rope boundary l 1s exposed to 1000 mrem /hr or less. '
ii. conspicuously posted, and iii. a flashing light shall be activated as a warning device.
- Radiation Protection personnel shall be exempt from the RWP l l issuance requirement during the performance of their assigned radiation protection duties, provided they comply with approved u radiation protection procedures for entry into high radiation
, areas.
l- 5-19a Amendment No. 78, EJ
.1-m .m A g- ,
w
.g
+ .
s4 ..
y
- e 4i.
- 1
.I t
F I.
5 I
ATTACHMENT B 4
i-l l'
l~
I.
I' l -.
l l
l l
r
[
L
- - . -_. e
,n .
Discussion:
This request for Amendment of the Technical Specifications addresses several administrative changes found on pages 5-1, 5-5, 5-8 and 5-19a.
A planned reorganization and partial relocation of the Emergency Planning Department is creating a number of title changes which are reflected in this amendment. In addition, a title was changed, Supervisor-Radiation Protection, but was omitted from page 5-19a in a previous amendment.
9 Justification:
The Commission has provided guidance concerning the application of the standards for determining whether a significant hazards consideration exists by providing certain examples (48 FR 14870) of amendments that are considered not likely to involve significant hazards consideration. Example (i) relates to a purely administrative change to the Technical Specifications: "for example, a change to achieve consistency throughout the Technical Specifications, correction of an error, or change in nomenclature." The proposed changes are similar to Example (1) and are purely administrative changes.
Basis for No Significant Hazards Consideration:
This proposed change does not involve significant hazards consideration because operation of Fort Calhoun Station in accordance with this change would not:
- 1. Involve.a significant increase in the probability or consequence of an accident previously evaluated. This change contains only adminis-l trative corrections. This change will change-titles and would not L effect previously evaluated accidents.
- 2. Create the possibility of a new or different kind of accident from any previously evaluated. This change contains only administrative corrections. No new or different modos of operation are proposed for the plant.
- 3. Involve a significant reduction in the margin of safety. This change contains only administrative corrections and, as such, does not result in a decrease in the margin of safety.
Therefore, based-on the above considerations, Omaha Public Power District has determined that this change does not involve a significant hazards consideration.
!