Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000289/LER-1993-002-01, :on 930129,bypass Occurred of Both Decay Heat Svc Coolers.Caused by Personnel Error.Mgt Reviewed Event W/ Affected Crew & Procedures Will Be Upgraded + (11:47:02, 20 December 2024)
- ML20034G843 + (11:47:04, 20 December 2024)
- ML20034G842 + (11:47:05, 20 December 2024)
- SNRC-2036, Shoreham Nuclear Power Station Annual Dose Rept for CY92 + (11:47:06, 20 December 2024)
- ML20034G840 + (11:47:08, 20 December 2024)
- ML20034G838 + (11:47:09, 20 December 2024)
- ML20034G837 + (11:47:10, 20 December 2024)
- TAC:M81446 + (11:47:11, 20 December 2024)
- ML20034G835 + (11:47:11, 20 December 2024)
- B14386, Provides Info to Clarify 910926 Response to GL 91-06 Re Resolution of A-30 on Adequacy of safety-related Dc Power Supplies,Per Insp Rept 50-245/91-24.Util Revised 125-volt Dc Sys Procedure & 8 H Capacity Test Completed + (11:47:14, 20 December 2024)
- ML20034G833 + (11:47:16, 20 December 2024)
- ML20034G832 + (11:47:17, 20 December 2024)
- ML20034G831 + (11:47:18, 20 December 2024)
- ML20034G830 + (11:47:19, 20 December 2024)
- ML20034G828 + (11:47:20, 20 December 2024)
- ML20034G826 + (11:47:20, 20 December 2024)
- ML20034G821 + (11:47:25, 20 December 2024)
- ML20034G819 + (11:47:26, 20 December 2024)
- 05000412/LER-1993-003, :on 930205,steam Generator Blowdown Sys Isolated Due to High Level in Steam Generator Blowdown Tank. Caused by Discrepancies Between Actual & Indicated Tank Level.Temporary Operating Procedure Written + (11:47:28, 20 December 2024)
- TAC:M81442 + (11:47:29, 20 December 2024)
- ML20034G815 + (11:47:30, 20 December 2024)
- ML20034G814 + (11:47:32, 20 December 2024)
- ML20034G813 + (11:47:33, 20 December 2024)
- RC-93-0060, Forwards Technical Rept 92-4, Seismic Activity Near VC Summer Nuclear Station, for Oct-Dec 1992 + (11:47:34, 20 December 2024)
- ML20034G809 + (11:47:40, 20 December 2024)
- ML20034G807 + (11:47:41, 20 December 2024)
- ML20034G806 + (11:47:43, 20 December 2024)
- ML20034G798 + (11:47:44, 20 December 2024)
- TAC:M59619 + (11:47:46, 20 December 2024)
- NRC-93-0018, Documents Implementation of Priority III Heds.Util Committed to Complete Priority III Heds by End of Third Refueling Outage + (11:47:48, 20 December 2024)
- 05000333/LER-1990-012-02, Forwards LER 90-012-02 Re Normal & Emergency Svc Water Corrosion,Silting & Check Valve Problems.Event Analysis Deficiency in LER Identified in Insp Rept 50-333/92-81 + (11:47:50, 20 December 2024)
- B14397, Responds to NRC Re Violations Noted in Insp Rept 50-213/92-23.Corrective Actions:Emergency Planning Dept Will Review Mgt Control of Emergency Planning Program Changes & Implement Upgrades as Appropriate to Enhance Effectiveness + (11:47:52, 20 December 2024)
- ML20034G784 + (11:47:55, 20 December 2024)
- ML20034G783 + (11:47:56, 20 December 2024)
- ML20034G780 + (11:47:57, 20 December 2024)
- ML20034G779 + (11:47:58, 20 December 2024)
- ML20034G778 + (11:47:59, 20 December 2024)
- ML20034G777 + (11:48:00, 20 December 2024)
- JAFP-93-0113, Ro:On 930226,west Diesel engine-driven Fire Pump 76P-1 & Electric motor-driven Fire Pump 76P-2 Declared Inoperable. Caused by Engine Overheating & Failure to Deliver Discharge Pressure,Respectively.Third Fire Pump Installed + (11:48:01, 20 December 2024)
- ML20034G774 + (11:48:06, 20 December 2024)
- 05000282/LER-1993-003-01, :on 930204,discovered That Lower Detector Flux Signal from All Four Nis power-range Channels Outside Acceptance Criterion.Caused by Miscalibration of power-range Channels.Procedures Revised & Test Labeling Improved + (11:48:08, 20 December 2024)
- 05000282/LER-1993-003, Forwards LER 93-003-00 Re Nuclear Instrumentation Sys power- Range Channels Miscalibrated Due to Use of Improper Test Leads.New NRC Commitments Listed + (11:48:10, 20 December 2024)
- 05000446/LER-1993-001-01, :on 930207,breaker Tripped at non-IE Instrument Power Distribution Panel to Allow Replacement of Breaker,Resulting in Containment Ventilation Isolation. Caused by Deenergized Relay.Drawing Revised + (11:48:13, 20 December 2024)
- A09448, Informs That Util Completed Review of Identified Issue Re Activities at Facility (RI-91-A-0034).Work Order Issued on 901205 to Fabricate Three Spare Svc Water Strainer Backwash Lines + (11:48:14, 20 December 2024)
- ML20034G764 + (11:48:17, 20 December 2024)
- ML20034G761 + (11:48:18, 20 December 2024)
- ML20034G763 + (11:48:18, 20 December 2024)
- ML20034G759 + (11:48:20, 20 December 2024)
- ML20034G757 + (11:48:21, 20 December 2024)
- ML20034G754 + (11:48:22, 20 December 2024)
- ML20034G753 + (11:48:24, 20 December 2024)