Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039G204 + (03:55:57, 20 December 2024)
- 05000219/LER-1981-060-03, /03L-0:on 811121,MAPLHGR Increased Beyond Tech Specs Limits.Caused by Personnel Error & Procedural Inadequacies.Core Power Reduced W/Flow & Appropriate Rod Groups Inserted One Notch + (03:56:02, 20 December 2024)
- ML20039G199 + (03:56:03, 20 December 2024)
- ML20039G198 + (03:56:04, 20 December 2024)
- 05000219/LER-1981-060, Forwards LER 81-060/03L-0.Detailed Event Analysis Encl + (03:56:05, 20 December 2024)
- 05000316/LER-1981-071-03, /03L-0:on 811206,power Supply Breaker Feeding Flux Drive & Axial Power Distribution Monitoring Sys Panels Tripped Open & Would Not Stay Closed.Caused by Open Circuit on Breaker Due to Component Fatigue.Opposite Breaker Used + (03:56:06, 20 December 2024)
- ML20039G193 + (03:56:07, 20 December 2024)
- ML20039G192 + (03:56:08, 20 December 2024)
- 05000316/LER-1981-071, Forwards LER 81-071/03L-0 + (03:56:09, 20 December 2024)
- 05000219/LER-1981-062-03, /03L-0:on 811125,core Spray Hi Drywell Pressure Switch RV46C Tripped in Excess of Tech Spec Limit.Caused by Sensor Repeatability.Sensor Recalibr + (03:56:11, 20 December 2024)
- ML20039G188 + (03:56:12, 20 December 2024)
- ML20039G187 + (03:56:12, 20 December 2024)
- 05000219/LER-1981-062, Forwards LER 81-062/03L-0.Detailed Event Analysis Encl + (03:56:14, 20 December 2024)
- ML20039G182 + (03:56:15, 20 December 2024)
- ML20039G184 + (03:56:15, 20 December 2024)
- ML20039G181 + (03:56:16, 20 December 2024)
- ML20039G179 + (03:56:17, 20 December 2024)
- ML20039G178 + (03:56:18, 20 December 2024)
- 05000254/LER-1981-024-03, /03L-0:on 811209,secondary Containment Lost When Both Ends of Underground Length of RHR a Svc Water Line Were Open for 7-h.Caused by Personnel Failure to Follow Proper Procedures for Opening Secondary Containment + (03:56:19, 20 December 2024)
- ML20039G176 + (03:56:21, 20 December 2024)
- ML20039G175 + (03:56:22, 20 December 2024)
- 05000254/LER-1981-024, Forwards LER 81-024/03L-0 + (03:56:26, 20 December 2024)
- 05000277/LER-1981-045-03, /03L-0:on 811127 & 1202,containment Atmospheric Dilution (CAD) Sys Tank Level Decreased Below Tech Spec. Caused by Open Relief Valve Due to Setpoint Drift of Pressure Control Valve on CAD Sys Liquid Nitrogen Tank + (03:56:27, 20 December 2024)
- 05000155/LER-1981-026-03, /03L-0:on 811207,radwaste Casing Vent Plug Failed & Approx 300 Gallons of Low Activity Radioactive Water Were Discharged in Pump Room.Caused by Deterioration of Pump Casing Due to long-term Corrosion & Erosion + (03:56:29, 20 December 2024)
- ML20039G169 + (03:56:30, 20 December 2024)
- 05000155/LER-1981-026, Forwards LER 81-026/03L-0 + (03:56:32, 20 December 2024)
- 05000265/LER-1981-017-03, /03L-1:on 810907,relief Valve 2-203-3E in auto- Depressurization Sys Failed to Open.Caused by Grooves Worn in Disc Guide Sleeve by Rings of Main Valve Disc as Result of High Vibration + (03:56:34, 20 December 2024)
- 05000265/LER-1981-017, Forwards LER 81-017/03L-1 + (03:56:35, 20 December 2024)
- 05000265/LER-1981-019-03, /03L-1:on 810929,penetrations on RHR Svc Water Pumps Found to Be Leaking.Caused by Pipe Vibration & Loosening of Penetration Seal Bolts.Penetrations Cleaned & Caulked & Seal Bolts Tightened as Needed + (03:56:37, 20 December 2024)
- 05000304/LER-1981-031-03, /03L-0:on 811206,auxiliary Feedwater Pump 2B Failed to Start Automatically on Lo Lo Level Signals from Steam Generators.Caused by Deviation of Pump Sensed Suction Pressure from True Suction Pressure After Pump Start + (03:56:39, 20 December 2024)
- 05000265/LER-1981-019, Forwards LER 81-019/03L-1 + (03:56:44, 20 December 2024)
- 05000304/LER-1981-033-03, /03L-0:on 811211,auxiliary Feedwater Pumps Failed to Automatically Start on Steam Generator Lo Lo Level Signal Following Reactor Trip.Caused by Pump Trip Due to Falsely Sensed Suction Pressure Following Pump Start + (03:56:46, 20 December 2024)
- 05000304/LER-1981-031, Forwards LER 81-031/03L-0 + (03:56:48, 20 December 2024)
- 05000304/LER-1981-033, Forwards LER 81-033/03L-0 + (03:56:50, 20 December 2024)
- 05000316/LER-1981-072-03, /03L-0:on 811207,during Design Review of Radiation Monitoring Sys,Discrepancy Discovered Between Design of Sys & Tech Spec Requirements Re Containment Ventilation Isolation Function of Monitor R-2.Design Change Underway + (03:56:59, 20 December 2024)
- TXX-3460, Notifies That Util Will Proceed W/Locking Open Safeguards Bldg ESF Filter Train Dampers + (03:57:00, 20 December 2024)
- ML20039G145 + (03:57:00, 20 December 2024)
- ML20039G142 + (03:57:03, 20 December 2024)
- ML20039G143 + (03:57:03, 20 December 2024)
- 05000316/LER-1981-072, Forwards LER 81-072/03L-0 + (03:57:05, 20 December 2024)
- ML20039G139 + (03:57:06, 20 December 2024)
- ML20039G138 + (03:57:07, 20 December 2024)
- AECM-81-508, Requests Amend to CPPR-118 to Allow Extension of Completion Date from 820301 to 821101 + (03:57:08, 20 December 2024)
- ML20039G136 + (03:57:09, 20 December 2024)
- 05000409/LER-1981-015-01, /01T-0:on 811224,following Reactor Scram,Temp of 1B Forced Circulation Loop Piping Decreased Below Tech Specs Limit.Caused by Inoperation of Pump Due to Seal Problems & Lack of Monitoring.Personnel Reinstructed + (03:57:11, 20 December 2024)
- ML20039G134 + (03:57:13, 20 December 2024)
- ML20039G133 + (03:57:15, 20 December 2024)
- 05000409/LER-1981-015, Forwards LER 81-015/01T-0.Detailed Event Analysis Encl + (03:57:16, 20 December 2024)
- ML20039G128 + (03:57:18, 20 December 2024)
- ML20039G129 + (03:57:18, 20 December 2024)
- ML20039G125 + (03:57:19, 20 December 2024)