Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000328/LER-1982-001-03, /03L-0:on 820103,ice Condenser Intermediate Deck Door 9.B Discovered Frozen Shut.Caused by Humidity Entering Through Top Deck Blanket Vents,Condensed on I-beams & Dripping Onto Intermediate Deck Door.Ice Removed + (01:53:42, 20 December 2024)
- 05000155/LER-1982-001-03, /03L-0:on 820111,during Quarterly Test of Reactor Depressurization Sys,Isolation Valve CV4180 Failed to Open, Making One Loop Inoperable.Caused by Valve Stem Seizure. Packing Lubricated & Valve Successfully Tested + (01:53:44, 20 December 2024)
- 05000328/LER-1982-001, Forwards LER 82-001/03L-0 + (01:53:46, 20 December 2024)
- 05000155/LER-1982-001, Forwards LER 82-001/03L-0 + (01:53:48, 20 December 2024)
- ML20040G715 + (01:53:50, 20 December 2024)
- 05000270/LER-1982-001-01, /01T-0:on 820117,reactor Bldg Equipment Hatch Found Leaking Air Through Gap in Seal.Caused by Personnel Not Verifying Good metal-to-gasket Seal Had Been Made. Procedures Revised to Require Verification of Proper Seal + (01:53:52, 20 December 2024)
- ML20040G712 + (01:53:53, 20 December 2024)
- ML20040G710 + (01:53:55, 20 December 2024)
- 05000249/LER-1982-002-03, /03L-0:on 820107,while Local Leak Rate Testing During Refueling Outage,Determined That Outboard MSIVs 3-203-2B & 3-203-2D Were Leaking in Excess of Tech Spec. Caused by Valve Packing Leakage.Packing Tightened + (01:53:56, 20 December 2024)
- 05000270/LER-1982-001, Forwards LER 82-001/01T-0.Detailed Event Analysis Encl + (01:53:59, 20 December 2024)
- ML20040G704 + (01:54:00, 20 December 2024)
- 05000249/LER-1982-002, Forwards LER 82-002/03L-0 + (01:54:01, 20 December 2024)
- IR 05000322/1982001 + (01:54:09, 20 December 2024)
- ML20040G700 + (01:54:10, 20 December 2024)
- ML20040G698 + (01:54:16, 20 December 2024)
- ML20040G696 + (01:54:22, 20 December 2024)
- ML20040G695 + (01:54:22, 20 December 2024)
- ML20040G694 + (01:54:28, 20 December 2024)
- ML20040G693 + (01:54:34, 20 December 2024)
- 05000321/LER-1982-006-01, /01T-0:on 820119,w/facility in Cold Shutdown,Three Pinhole Leaks Found Next to Weld in Flow Element Sensing Line from Recirculation Sys Loop A.Cause Unknown.Failed Section of Sensing Line Replaced.Investigation Underway + (01:54:39, 20 December 2024)
- ML20040G690 + (01:54:45, 20 December 2024)
- ML20040G689 + (01:54:46, 20 December 2024)
- 05000237/LER-1981-078-01, /01X-1:on 811223,during Automatic Depressurization Sys Valve Surveillance,Electromatic Relief Valve 2B Failed to Open.Caused by Wire Wedge in Contact That Bypass Hold Coil.Wires Moved + (01:54:48, 20 December 2024)
- ML20040G685 + (01:54:56, 20 December 2024)
- 05000237/LER-1981-078, Forwards LER 81-078/01X-1 + (01:55:00, 20 December 2024)
- 05000266/LER-1982-001-03, /03L-0:on 820107,steam Generator Pressure Sensing Lines Discovered Frozen on a Steam Generator.Caused by Inadequate Freeze Protection & Extremely Cold Weather.Addl Heat Lamps Installed + (01:55:02, 20 December 2024)
- ML20040G680 + (01:55:09, 20 December 2024)
- ML20040G679 + (01:55:09, 20 December 2024)
- 05000266/LER-1982-001, Forwards LER 82-001/03L-0 + (01:55:11, 20 December 2024)
- 05000321/LER-1982-006, Forwards LER 82-006/01T-0 + (01:55:15, 20 December 2024)
- ML20040G672 + (01:55:16, 20 December 2024)
- 05000346/LER-1981-037, Forwards LER 81-037/03X-2 + (01:55:17, 20 December 2024)
- ML20040G667 + (01:55:26, 20 December 2024)
- IR 05000445/1981018 + (01:55:34, 20 December 2024)
- ML20040G664 + (01:55:40, 20 December 2024)
- ML20040G662 + (01:55:41, 20 December 2024)
- ML20040G663 + (01:55:41, 20 December 2024)
- ML20040G661 + (01:55:47, 20 December 2024)
- ML20040G658 + (01:55:49, 20 December 2024)
- ML20040G655 + (01:55:55, 20 December 2024)
- ML20040G654 + (01:55:56, 20 December 2024)
- 05000321/LER-1982-005-03, /03L-0:on 820118,during Cold Shutdown & Main Steam Line Flow Functional Test & Calibr Flow Switch 1B21-N006C Actuated at 124 Psid.Caused by Switch Setpoint Drift.Switch Recalibr & Returned to Svc + (01:55:57, 20 December 2024)
- ML20040G652 + (01:55:58, 20 December 2024)
- ML20040G650 + (01:56:04, 20 December 2024)
- 05000321/LER-1982-005, Forwards LER 82-005/03L-0 + (01:56:05, 20 December 2024)
- ML20040G647 + (01:56:06, 20 December 2024)
- ML20040G646 + (01:56:13, 20 December 2024)
- ML20040G644 + (01:56:18, 20 December 2024)
- ML20040G643 + (01:56:24, 20 December 2024)
- ML20040G641 + (01:56:31, 20 December 2024)
- ML20040G640 + (01:56:37, 20 December 2024)