Text
i Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 February 3, 1982 QA-82-130 e
A NECEfVED Mr. W. P. Haass, Chief A.
1 FEB.g 2%m Quality Assurance Branch 2
T p!
Division of Engineering g
U.S. Nuclear Regulatory Commission
,E i
Washington, D.C.
20555
,/
1
//
Dear Mr. Haass:
Subject:
OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION
'WPPSS-QA-004)
Reference-Letter, W.P. Haass to G.D. Bouchey, dated January 14, 1982, "NRC Acceptance of Revised Washington Public Power Supply System's Quality Assurance Topical Report.
Enclosed for your use are thirty-six (36) copies of Supply System Operational QA Program Description (WPPSS-QA-004, Revision 6).
The Quality Assurance Program described in WPPSS-QA-004, Revision 6, will be applied to all initial test (preoperational and start-up testing) and operational activities at Supply System plants WNP-1, WNP-2 and WNP-3.
The referenced letter requested that the report be renumbered as WPPSS-QA-004A.
Subsequent discussion with Mr. James Conway of your staff clarified that the report need not be renumbered as requested.
Should you have any questions concerning this transmittal, please contact Mr. M. M. Monopoli, Manager, Operational Quality Assur-ance, at (509) 372-6838.
Very truly yours, MMn=
G. D. Bouchey Deputy Director Safety & Security hp0Y D
T 6i{5 0202160343 820203 PDR ADOCK 05000397 A