Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23193A963 + (22:41:44, 2 January 2025)
- ML23193A900 + (22:41:50, 2 January 2025)
- ML23193A898 + (22:42:15, 2 January 2025)
- ML23193A895 + (22:42:17, 2 January 2025)
- ML23193A890 + (22:42:20, 2 January 2025)
- ML23193A889 + (22:42:21, 2 January 2025)
- ML23193A888 + (22:42:23, 2 January 2025)
- ML23193A878 + (22:42:27, 2 January 2025)
- ML23193A875 + (22:42:29, 2 January 2025)
- ML23193A874 + (22:42:31, 2 January 2025)
- ML23193A870 + (22:42:35, 2 January 2025)
- ML23193A869 + (22:42:37, 2 January 2025)
- ML23193A868 + (22:42:38, 2 January 2025)
- ML23193A865 + (22:42:40, 2 January 2025)
- CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 + (22:42:44, 2 January 2025)
- ML23193A784 + (22:42:47, 2 January 2025)
- 05000412/LER-2023-002, Automatic Actuation of Auxiliary Feedwater System + (22:42:56, 2 January 2025)
- 05000400/LER-2022-006-02, Auxiliary Feedwater Pump Inoperability + (22:43:04, 2 January 2025)
- ML23192A527 + (22:43:07, 2 January 2025)
- ML23192A447 + (22:43:14, 2 January 2025)
- ML23192A441 + (22:43:15, 2 January 2025)
- ML23192A048 + (22:43:41, 2 January 2025)
- ML23192A022 + (22:43:44, 2 January 2025)
- ML23192A017 + (22:43:46, 2 January 2025)
- ML23191A456 + (22:43:59, 2 January 2025)
- EPID:L-2022-LLA-0115 + (22:44:07, 2 January 2025)
- 05000336/LER-2023-001, For Millstone, Unit 2, Structural Integrity of a Train Service Water Header Piping Could Not Be Demonstrated Causing the Unit to Operate in a Condition Prohibited by Technical Specifications + (22:44:26, 2 January 2025)
- EPID:L-2020-LLA-0261 + (22:44:32, 2 January 2025)
- ML23187A075 + (22:45:06, 2 January 2025)
- ML23187A046 + (22:45:08, 2 January 2025)
- ML23186A206 + (22:45:10, 2 January 2025)
- IR 015000017/2022001 + (22:45:31, 2 January 2025)
- 05000390/LER-2023-001, Interpretation of Technical Specification (TS) Table 1.1-1 Leads to a Condition Prohibited by TS + (22:45:35, 2 January 2025)
- IR 05000424/2023301 + (22:45:40, 2 January 2025)
- ML23184A035 + (22:45:41, 2 January 2025)
- 05200025/LER-2023-004, Manual Reactor Protection System Actuation Due to Condenser Flanges Not Removed During Construction + (22:45:50, 2 January 2025)
- ML23181A167 + (22:45:54, 2 January 2025)
- 05000443/LER-2023-003, Reactor Protection System Manual Actuation Due to Failed Silicon Controlled Rectifiers + (22:46:04, 2 January 2025)
- 05000443/LER-2023-002, Automatic Actuation of Emergency Service Water During Testing Due to a Defective Relay + (22:46:05, 2 January 2025)
- 05000458/LER-2023-002, Division I and II Diesel Generators Inoperable Due to Exceeding Load Sequence Times + (22:46:17, 2 January 2025)
- 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level + (22:46:20, 2 January 2025)
- EPID:L-2022-LRR-0074 + (22:46:21, 2 January 2025)
- EPID:L-2022-SPR-0009 + (22:46:30, 2 January 2025)
- ML23180A039 + (22:46:40, 2 January 2025)
- ML23180A028 + (22:46:47, 2 January 2025)
- ML23180A020 + (22:46:50, 2 January 2025)
- EPID:L-2021-TOP-0040 + (22:46:53, 2 January 2025)
- ML23179A120 + (22:47:04, 2 January 2025)
- ML23178A227 + (22:47:25, 2 January 2025)
- ML23178A001 + (22:47:41, 2 January 2025)
- 05000352/LER-2023-001, Emergency Diesel Generator Lube Oil Pressure Sensing Line Leak Resulting in a Condition Prohibited by Technical Specifications + (22:47:46, 2 January 2025)