Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24135A106 + (20:51:29, 2 January 2025)
- ML24135A104 + (20:51:30, 2 January 2025)
- ML24135A101 + (20:51:32, 2 January 2025)
- ML24135A100 + (20:51:34, 2 January 2025)
- ML24135A098 + (20:51:36, 2 January 2025)
- ML24135A095 + (20:51:38, 2 January 2025)
- ML24135A090 + (20:51:40, 2 January 2025)
- SVPLTR 24-0018, Annual Radiological Environmental Operating Report + (20:51:45, 2 January 2025)
- 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical + (20:51:50, 2 January 2025)
- GO2-24-049, 2023 Annual Radiological Environmental Operating Report + (20:51:59, 2 January 2025)
- IR 05000254/2024001 + (20:52:04, 2 January 2025)
- IR 05000387/2024001 + (20:52:15, 2 January 2025)
- 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications + (20:52:16, 2 January 2025)
- IR 05000390/2024001 + (20:52:18, 2 January 2025)
- IR 05000443/2024001 + (20:52:21, 2 January 2025)
- ML24134A004 + (20:52:22, 2 January 2025)
- IR 05000259/2024001 + (20:52:25, 2 January 2025)
- IR 05000315/2024401 + (20:52:27, 2 January 2025)
- IR 05000263/2024010 + (20:52:29, 2 January 2025)
- IR 05000335/2024001 + (20:52:32, 2 January 2025)
- IR 05000277/2024001 + (20:52:38, 2 January 2025)
- SVP-24-034, Annual Radiological Environmental Operating Report + (20:52:40, 2 January 2025)
- 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications + (20:52:41, 2 January 2025)
- 05000265/LER-2024-001, Automatic Actuation of Reactor Protection System During Scram Discharge Volume Leak Rate Testing + (20:52:42, 2 January 2025)
- IR 05000315/2024001 + (20:52:43, 2 January 2025)
- EPID:L-2023-LLR-0050 + (20:52:44, 2 January 2025)
- IR 05000220/2024001 + (20:52:46, 2 January 2025)
- 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater + (20:52:48, 2 January 2025)
- JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report + (20:52:55, 2 January 2025)
- IR 05000454/2024001 + (20:53:24, 2 January 2025)
- IR 05000395/2024001 + (20:53:30, 2 January 2025)
- BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR) + (20:53:33, 2 January 2025)
- 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger + (20:53:35, 2 January 2025)
- ML24130A070 + (20:53:40, 2 January 2025)
- ML24130A066 + (20:53:42, 2 January 2025)
- ML24130A065 + (20:53:44, 2 January 2025)
- ML24130A062 + (20:53:46, 2 January 2025)
- ML24130A059 + (20:53:48, 2 January 2025)
- IR 05000333/2024001 + (20:53:51, 2 January 2025)
- IR 05000250/2024001 + (20:53:53, 2 January 2025)
- IR 05000413/2024001 + (20:53:59, 2 January 2025)
- IR 05000261/2024001 + (20:54:01, 2 January 2025)
- IR 05000354/2024001 + (20:54:04, 2 January 2025)
- ML24129A128 + (20:54:09, 2 January 2025)
- ML24129A107 + (20:54:13, 2 January 2025)
- IR 05000338/2024001 + (20:54:15, 2 January 2025)
- IR 05000324/2024001 + (20:54:18, 2 January 2025)
- IR 05000334/2024001 + (20:54:21, 2 January 2025)
- ML24128A262 + (20:54:25, 2 January 2025)
- IR 05000369/2024001 + (20:54:33, 2 January 2025)
- ML24128A119 + (20:54:40, 2 January 2025)