Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19305A967 + (11:15:26, 2 January 2025)
- ML19305A966 + (11:15:27, 2 January 2025)
- ML19305A965 + (11:15:32, 2 January 2025)
- 05000325/LER-1980-016-03, /03L-0:on 800214,while Running Inner Diameter RHR Pump in Torus Cooling Mode in Preparation for HPCI Surveillance Testing,Pump Tripped,Making B Loop of LPCI Inoperable.Cause Unknown.Breaker Reset & Pump Started + (11:15:34, 2 January 2025)
- ML19305A963 + (11:15:35, 2 January 2025)
- 05000259/LER-1980-019-01, /01T-0:on 800301,during Winter Storm,Offsite 161 Kv Power Sources Were Lost for Six Minutes.Caused by High Winds & Ice Loading.Condition Compounded by Improper Lineup of Athens Line Protective Zone Relays + (11:15:36, 2 January 2025)
- 05000259/LER-1980-008-03, During Scheduled Refueling Outage,Hpci Turbine Had Crack in Coupling Bearing Support Pedestal.Possibly Caused by Water Hammer in Main Steam Supply Line + (11:15:38, 2 January 2025)
- 05000325/LER-1980-016, Forwards LER 80-016/03L-0 + (11:15:40, 2 January 2025)
- ML19305A956 + (11:15:41, 2 January 2025)
- 05000259/LER-1980-019, Forwards LER 80-019/01T-0 + (11:15:42, 2 January 2025)
- 05000259/LER-1980-008, Forwards Updated LER 80-008/03L-1 + (11:15:44, 2 January 2025)
- ML19305A951 + (11:15:45, 2 January 2025)
- ML19305A950 + (11:15:46, 2 January 2025)
- ML19305A949 + (11:15:47, 2 January 2025)
- ML19305A947 + (11:15:47, 2 January 2025)
- ML19305A944 + (11:15:48, 2 January 2025)
- ML19305A945 + (11:15:48, 2 January 2025)
- ML19305A940 + (11:15:51, 2 January 2025)
- ML19305A943 + (11:15:51, 2 January 2025)
- 05000259/LER-1980-022-03, /03L-0:on 800212,during Scheduled Refueling Outage,Total Leak Rate of Primary Containment Penetrations Exceeded Tech Spec Limit.Caused by Wear of Valve Seating Surfaces.Valves Repaired & Retested + (11:15:53, 2 January 2025)
- ML19305A937 + (11:15:55, 2 January 2025)
- ML19305A936 + (11:15:57, 2 January 2025)
- 05000259/LER-1980-022, Forwards LER 80-022/03L-0 + (11:15:58, 2 January 2025)
- 05000338/LER-1980-032-03, /03L-0:on 800215,1H Emergency Diesel Generator Tripped on Overspeed During Manual Start to Verify Diesel Operability.Tripped Again on 800223,0302,06,10 & 11.Caused by Defective Oil Booster Servomotor.Servomotor Replaced + (11:16:04, 2 January 2025)
- ML19305A929 + (11:16:05, 2 January 2025)
- 05000338/LER-1980-032, Forwards LER 80-032/03L-0 + (11:16:12, 2 January 2025)
- ML19305A923 + (11:16:13, 2 January 2025)
- 05000278/LER-1980-007-01, /01T-0:on 800221,during Routine Plant Equipment Insp,Seismically Qualified Backup Nitrogen Bottle Supplies to Five Containment Ventilation Valves Found Out of Svc. Caused by Lack of Operator Info & Equipment Identification + (11:16:15, 2 January 2025)
- 05000333/LER-1980-024-03, /03L-0:on 800213,during Normal Operation,Hpci Steam Isolation Valve Closed Due to Spurious Operation Signal.Caused by Loose Wire within Thermocouple Switch Associated W/High Area Temp Isolation Logic.Wire Fastened + (11:16:17, 2 January 2025)
- ML19305A916 + (11:16:19, 2 January 2025)
- ML19305A917 + (11:16:19, 2 January 2025)
- W3F1-2019-0078, Submittal of Emergency Plan, Revision 050 + (11:16:20, 2 January 2025)
- ML19305A914 + (11:16:21, 2 January 2025)
- 05000278/LER-1980-007, Forwards LER 80-007/01T-0 + (11:16:22, 2 January 2025)
- 05000333/LER-1980-024, Forwards LER 80-024/03L-0 + (11:16:24, 2 January 2025)
- ML19305A909 + (11:16:25, 2 January 2025)
- ML19305A908 + (11:16:26, 2 January 2025)
- 05000278/LER-1980-004-03, /03L-0:on 800205 During Plant Startup,Reactor Water Conductivity Increased & Exceeded Tech Spec Limits. Caused by Resin Injection.Reactor Was Shut Down & Primary Coolant Chemistry Brought within Tech Spec Limits + (11:16:27, 2 January 2025)
- 05000133/LER-1980-001-03, /03L-0:on 800210,during Routine Testing,Fire Water Sys Header Low Pressure Switch Started Fire Pumps at 44 Psig.Caused by Setpoint Drifting Due to Loosening of Setpoint Retainer.Setpoint Was Adjusted + (11:16:29, 2 January 2025)
- ML19305A904 + (11:16:30, 2 January 2025)
- 05000271/LER-1980-011-01, /01P-0:on 800312,investigation of Onsite Power Distribution Sys Revealed Voltage for Continuous Operation of Some 480 Volt Sys Loads Below Min Required Voltage.Caused by Incomplete Analysis of Sys When Transformers Replaced + (11:16:32, 2 January 2025)
- ML19305A902 + (11:16:34, 2 January 2025)
- 05000278/LER-1980-004, Forwards LER 80-004/03L-0 + (11:16:35, 2 January 2025)
- 05000133/LER-1980-001, Forwards LER 80-001/03L-0 + (11:16:37, 2 January 2025)
- ML19305A897 + (11:16:38, 2 January 2025)
- 05000271/LER-1980-011, Forwards LER 80-011/01P-0 + (11:16:40, 2 January 2025)
- ML19305A893 + (11:16:42, 2 January 2025)
- ML19305A894 + (11:16:42, 2 January 2025)
- 05000259/LER-1980-018-03, /03L-0:on 800217,during Refueling Operations 4 Kv Shutdown Board B Alternate Feeder Failed to Close During Board Transfer Test.Cause Unknown.Failure Appears Random + (11:16:44, 2 January 2025)
- ML19305A890 + (11:16:45, 2 January 2025)
- TMI-19-097, License Amendment Request - License Condition Revision for Removal of Cyber Security Plan Requirements + (11:16:46, 2 January 2025)