Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19309E181 + (08:05:33, 2 January 2025)
- ML19309E182 + (08:05:33, 2 January 2025)
- IR 05000309/1980003 + (08:05:35, 2 January 2025)
- ML19309E179 + (08:05:36, 2 January 2025)
- ML19309E177 + (08:05:37, 2 January 2025)
- ML19309E176 + (08:05:38, 2 January 2025)
- ML19309E175 + (08:05:39, 2 January 2025)
- ML19309E174 + (08:05:40, 2 January 2025)
- ML19309E172 + (08:05:42, 2 January 2025)
- ML19309E173 + (08:05:42, 2 January 2025)
- ML19309E171 + (08:05:43, 2 January 2025)
- ML19309E170 + (08:05:45, 2 January 2025)
- ML19309E169 + (08:05:46, 2 January 2025)
- ML19309E168 + (08:05:47, 2 January 2025)
- ML19309E167 + (08:05:48, 2 January 2025)
- 05000309/LER-1980-007-03, /03L-0:on 800319,during Routine Power Escalation Following Refueling Shutdown,Rhr Valves RH-8 & 10 Found Open & Unlocked.Six Addl Valves Found Unlocked.Caused by Personnel Error.Operators Reinstructed on Procedures + (08:05:53, 2 January 2025)
- ML19309E165 + (08:05:54, 2 January 2025)
- 05000309/LER-1980-007, Forwards LER 80-007/03L-0 + (08:05:56, 2 January 2025)
- ML19309E162 + (08:05:58, 2 January 2025)
- ML19309E161 + (08:05:58, 2 January 2025)
- ML19309E160 + (08:05:59, 2 January 2025)
- ML19309E158 + (08:06:00, 2 January 2025)
- ML19309E157 + (08:06:00, 2 January 2025)
- ML19309E155 + (08:06:01, 2 January 2025)
- ML19309E153 + (08:06:02, 2 January 2025)
- ML19309E152 + (08:06:03, 2 January 2025)
- ML19309E150 + (08:06:04, 2 January 2025)
- ML19309E151 + (08:06:04, 2 January 2025)
- ML19309E149 + (08:06:06, 2 January 2025)
- ML19309E148 + (08:06:07, 2 January 2025)
- 05000263/LER-1980-017, Forwards LER 80-017/01T-0 + (08:06:08, 2 January 2025)
- ML19309E146 + (08:06:10, 2 January 2025)
- ML19309E144 + (08:06:11, 2 January 2025)
- 05000327/LER-1980-021-03, /03L-0:on 800308,while in Mode 6,flow Rates from Auxiliary Bldg Ventilation Sys Flow Rate Monitor Were Not Recorded for Three Shifts.Caused by Misreading of Notation Used in Surveillance Instruction.Temporary Change Issued + (08:06:13, 2 January 2025)
- ML19309E140 + (08:06:14, 2 January 2025)
- 05000327/LER-1980-021, Forwards LER 80-021/03L-0 + (08:06:16, 2 January 2025)
- ML19309E137 + (08:06:17, 2 January 2025)
- ML19309E135 + (08:06:18, 2 January 2025)
- ML19309E133 + (08:06:20, 2 January 2025)
- ML19309E132 + (08:06:21, 2 January 2025)
- ML19309E128 + (08:06:23, 2 January 2025)
- ML19309E126 + (08:06:24, 2 January 2025)
- ML19309E124 + (08:06:25, 2 January 2025)
- ML19309E122 + (08:06:26, 2 January 2025)
- ML19309E123 + (08:06:26, 2 January 2025)
- 05000271/LER-1980-013-03, /03L-0:on 800326,while Performing Surveillance Test on Hpci,Turbine Speed Would Not Increase Above 800 Rpm. Caused by Failure of Flow Controller.Flow Controller Was Replaced + (08:06:28, 2 January 2025)
- 05000271/LER-1980-013, Forwards LER 80-013/03L-0 + (08:06:36, 2 January 2025)
- 05000327/LER-1980-017-03, /03L-0:on 800310,while in Mode 6,turbine Bldg Sump Monitor O-RM-90-212 Alarm Kept Coming In.Monitor Was Declared Inoperable.Caused by Malfunctioning Flow Switch Not Allowing Sufficient Flow Through Monitor + (08:06:40, 2 January 2025)
- ML19309E113 + (08:06:42, 2 January 2025)
- 05000336/LER-1980-011-03, /03L-0:on 800313,following Full Power Plant Trip, Two Broken Saddle Clamp Bolts Were Found on Hydraulic Snubber Hanger 490008 on Ms Lead to HP Turbine.Caused by Fatigue Cracking Due to High Vibration & Shear on Trips + (08:06:43, 2 January 2025)
- ML19309E111 + (08:06:45, 2 January 2025)
- ML19309E110 + (08:06:46, 2 January 2025)