Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20237C517 + (13:12:17, 2 December 2024)
- ML20237C516 + (13:12:18, 2 December 2024)
- LR-N980401, Monthly Operating Rept for July 1998 for Hope Creek Generating Station,Unit 1 + (13:12:19, 2 December 2024)
- ML20237C513 + (13:12:19, 2 December 2024)
- ML20237C511 + (13:12:20, 2 December 2024)
- ML20237C510 + (13:12:21, 2 December 2024)
- ML20237C506 + (13:12:21, 2 December 2024)
- ML20237C503 + (13:12:22, 2 December 2024)
- ML20237C501 + (13:12:23, 2 December 2024)
- ML20237C500 + (13:12:24, 2 December 2024)
- ML20237C498 + (13:12:25, 2 December 2024)
- IR 05000483/1987029 + (13:12:26, 2 December 2024)
- NOC-AE-00025, Forwards Response to NRC 980715 RAI Re Licensee Proposed TS Change for Alternate Repair Criteria for Stp,Unit 2 SGs + (13:12:26, 2 December 2024)
- ML20237C492 + (13:12:28, 2 December 2024)
- 05000269/LER-1987-009-04, :on 871028,standby Bus 1 Removed from Svc for Maint Insp.Caused by Mgt Deficiency.Standby Bus Returned to Svc & Special 5-day Rept,Per Tech Spec,Sent to NRC + (13:12:30, 2 December 2024)
- ML20237C488 + (13:12:31, 2 December 2024)
- TXX-7112, Interim Deficiency Report CP-86-12 Re Attachments at or in Close Proximity to Design Gaps Between Secondary Walls & Adjacent Walls/Floors.Initially Reported on 860227.Next Rept to Be Provided by 880318 + (13:12:31, 2 December 2024)
- ML20237C486 + (13:12:32, 2 December 2024)
- ML20237C482 + (13:12:32, 2 December 2024)
- ML20237C480 + (13:12:33, 2 December 2024)
- ML20237C475 + (13:12:34, 2 December 2024)
- ML20237C476 + (13:12:34, 2 December 2024)
- 05000416/LER-1987-018, :on 871114,discovered That Surveillance Program Tracking Sys Rept Did Not Include Adequate Info on Surveillance of Operational Condition During Core Alteration.Caused by Deficient Procedure + (13:12:36, 2 December 2024)
- ML20237C471 + (13:12:37, 2 December 2024)
- ML20237C472 + (13:12:37, 2 December 2024)
- ML20237C469 + (13:12:38, 2 December 2024)
- ML20237C467 + (13:12:39, 2 December 2024)
- ML20237C468 + (13:12:39, 2 December 2024)
- ML20237C465 + (13:12:40, 2 December 2024)
- ML20237C466 + (13:12:40, 2 December 2024)
- 05000254/LER-1998-011-02, :on 980716,unqualified Circuit Card Was Installed in SD Instrument Vol Level Transmitter,Rendering It Inoperable.Caused by Personnel Error.Reviewed Event with Instrument Maint,Sys Engineering & Procurement Engineering + (13:12:43, 2 December 2024)
- ML20237C462 + (13:12:43, 2 December 2024)
- ML20237C460 + (13:12:44, 2 December 2024)
- ML20237C459 + (13:12:45, 2 December 2024)
- ML20237C458 + (13:12:45, 2 December 2024)
- IR 05000361/1987029 + (13:12:47, 2 December 2024)
- ML20237C454 + (13:12:48, 2 December 2024)
- 05000254/LER-1998-011, Forwards LER 98-011-00,IAW 10CFR50.73(a)(2)(i)(B). Commitments Made within Ltr,Listed + (13:12:49, 2 December 2024)
- ML20237C453 + (13:12:49, 2 December 2024)
- CY-98-003, Application for Amend to License DPR-61,reflecting Limitations & Requirements Appropriate to Present Configuration of Plant + (13:12:51, 2 December 2024)
- ML20237C448 + (13:12:51, 2 December 2024)
- ML20237C444 + (13:12:52, 2 December 2024)
- ML20237C442 + (13:12:53, 2 December 2024)
- ML20237C441 + (13:12:54, 2 December 2024)
- ML20237C440 + (13:12:55, 2 December 2024)
- ST-HL-AE-2416, Application for Amend to License NPF-71,changing Tech Specs (NUREG-1255) Re Tendon Surveillance Requirements to Be Same as Sts.Fee Paid + (13:12:55, 2 December 2024)
- ML20237C436 + (13:12:56, 2 December 2024)
- 05000265/LER-1987-019-07, :on 871116,three Piping Supports Did Not Comply W/Fsar Criteria for Allowable Stress.Caused by Design Error. Variable Spring Cans Adjusted & Rigid Strut Support Installed + (13:12:58, 2 December 2024)
- ML20237C433 + (13:12:59, 2 December 2024)
- ML20237C434 + (13:12:59, 2 December 2024)
- 05000456/LER-1998-002-08, :on 980719,discovered That No SRO Was in Cr. Caused by Personnel Error.Counseled Unit 1 Supervisor & Reinforced Operating Mgts Expectations Re Performance of Turnovers W/All Operating Crews + (13:13:01, 2 December 2024)