Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-12-097, Indian Point Unit 3, License Amendment Request for Emergency Diesel Generator Fuel Oil System + (06:21:17, 18 September 2018)
- TAC:ME2164 + (06:27:15, 18 September 2018)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T + (06:33:01, 18 September 2018)
- RC-12-0110, Virgil C. Summer Nuclear Station Unit 1 - Request for Weld Recategorization and Use of Alternatives to ASME Code Inspection Interval for VCSNS Third Ten Year Inservice Inspection (RR-III-08) + (06:54:25, 18 September 2018)
- CP-201200667, CP-2012-06 Post Examination Comments. Transmittal of Licensed Operator Exam Materials by Luminant + (07:04:39, 18 September 2018)
- NL-12-1078, Edwin I. Hatch, Units 1 and 2, License Amendment Request to Revise the Minimum Water Level in the Plant Service Water Pump Well + (07:26:37, 18 September 2018)
- L-2012-248, Turkey Point, Units 3 and 4, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone Change + (07:42:59, 18 September 2018)
- RA-12-063, Oyster Creek Nuclear Generating Station - Revision of the Core Operating Limits Report for Reload 22, Cycle 23, Revision 7 + (07:49:46, 18 September 2018)
- L-2011-349, Turkey Point Initial Exam 2011-302 General Correspondence + (08:12:08, 18 September 2018)
- ULNRC-05852, Callaway, Unit 1, Operating Quality Assurance Manual (Oqam) Revision 29 + (08:37:31, 18 September 2018)
- LR-N12-0148, Hope Creek Generating Station - Core Operating Limits Report, Reload 17, Cycle 18, Revision 7 + (08:43:35, 18 September 2018)
- RS-12-088, Limerick, Unit 1, Response to Request for Additional Information Regarding Status of Decommissioning Funding Assurance + (08:44:37, 18 September 2018)
- NL-12-020, Indian Point Unit Nos. 1, 2 & 3 - 2011 Annual Radioactive Effluent Release Report + (08:57:36, 18 September 2018)
- TAC:ME8495 + (08:59:27, 18 September 2018)
- LR-N12-0124, Salem Generating Station, Units 1 and 2 - Final Supplemental Response to Generic Letter 2004-02 + (09:04:28, 18 September 2018)
- CP-201200347, Comanche Peak, Units 1 and 2, Enclosure 1 to TXX-12061, 2011 Radioactive Effluent Release Report + (09:08:04, 18 September 2018)
- CP-201200347, Comanche Peak, Units 1 and 2, Transmittal of Year 2011 Radioactive Effluent Release Report + (09:08:10, 18 September 2018)
- CP-201200034, Comanche Peak, Units 1 and 2, Submittal of the Annual Non-Radiological Environmental Operating Report for 2011 + (09:09:09, 18 September 2018)
- DCL-12-041, Diablo Canyon Units 1 and 2, 2011 Annual Radiological Environmental Operating Report + (09:10:07, 18 September 2018)
- LR-N12-0121, Salem and Hope Creek - 2011 Annual Radioactive Effluent Release Report + (09:26:36, 18 September 2018)
- TAC:ME8461 + (09:36:49, 18 September 2018)
- ULNRC-05855, Callaway, Unit 1, Response to NRC Request for Information 10 CFR 50.55a Request: Proposed Alternative to ASME OM Code Replacement Interval for Main Steam Isolation Valve Actuator Rupture Disks + (09:40:45, 18 September 2018)
- RA-12-017, Brunswick, Units 1 & 2, Crystal River, Unit 3, Shearon Harris, Unit 1, H.B. Robinson, Unit 2, Carolina Power & Light Company and Florida Power Corporation'S 30-Day Response to March 12, 2012, Information Request + (09:49:47, 18 September 2018)
- NL-12-024, Indian Point Unit 2, Technical Specification 5.6.7 - IP2 Steam Generator Tube Inspection Report - Spring 2012 Refueling Outage + (09:55:47, 18 September 2018)
- NEI 99-04, McGuire Nuclear Station, Units 1 and 2 - Annual Commitment Change Report + (09:58:02, 18 September 2018)
- L-2012-159, St. Lucie, Unit 1, Response to NRC Nuclear Performance and Code Review Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request + (09:59:53, 18 September 2018)
- TAC:LA0233 + (11:14:20, 18 September 2018)
- RS-12-037, Braidwood, Unit 2, and Byron, Unit 2, Response to Request for Information Regarding Thermal Conductivity Degradation and 10 CFR 50.46 Report + (11:26:07, 18 September 2018)
- L-2012-080, St. Lucie, Units 1 and 2, Submittal of 2011 Annual Radioactive Effluent Release Report + (11:36:03, 18 September 2018)
- NRC-12-0012, Updated Fermi 1 Groundwater Monitoring Data + (11:36:40, 18 September 2018)
- TAC:ME8144 + (11:38:20, 18 September 2018)
- L-2012-072, St. Lucie, Unit 1 - Response to Request for Additional Information Identified During Audit of the Safety Analyses Calculations for the Extended Power Uprate License Amendment Request + (11:42:21, 18 September 2018)
- NL-12-029, Indian Point Unit 3, Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Pool Cooling System Is Out of Service + (11:46:05, 18 September 2018)
- ENS 53585 + (12:01:04, 18 September 2018)
- ENS 53588 + (12:01:09, 18 September 2018)
- ENS 53591 + (12:01:11, 18 September 2018)
- TAC:ME5104 + (12:09:02, 18 September 2018)
- NL-12-0242, Joseph M. Farley Nuclear Plant - Unit 2 Refueling Outage 2R21 Inservice Inspection Report + (12:15:44, 18 September 2018)
- NL-12-032, Indian Point Nuclear Generating Unit Nos. 1, 2 & 3 - Correction to Previous Response Regarding Unit 1 Buried Piping + (12:24:17, 18 September 2018)
- TAC:ME5748 + (12:55:14, 18 September 2018)
- LR-N11-0366, Letter from Pseg Nuclear, Transmittal of Core Operating Limits Report, Reload 16, Cycle 17, Revision 5 + (14:13:27, 18 September 2018)
- RS-11-178, Quad Cities, Units 1 & 2, Registration of Use of Casks to Store Spent Fuel + (14:14:29, 18 September 2018)
- RS-11-180, Quad Cities, Unit 2 - Request for Technical Specification Change for Safety Limit Minimum Critical Power Ratio + (14:29:40, 18 September 2018)
- NG-11-0256, Ltr 11/16/11 Duane Arnold Energy Center Confirmation of License Exam + (14:31:29, 18 September 2018)
- RS-11-110, Ltr. 11/16/11 Braidwood Confirmation of Operator License Exam + (14:31:38, 18 September 2018)
- NL-11-1812, Edwin I. Hatch, Unit 2 - 2011 Updated Final Safety Analysis Report, Revision 29, Chapter 6, Engineered Safety Features Through Chapter 7, Instrumentation and Control + (14:35:34, 18 September 2018)
- NL-11-1812, Edwin I. Hatch, Units 1 and 2, Updated Final Safety Analysis Report, Fire Hazards Analysis Changes, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Report, and Revised NRC Commitments Report + (14:35:38, 18 September 2018)
- Contraband + (14:48:27, 18 September 2018)
- DCL-11-104, Diablo Canyon Units 1 and 2, License Amendment Request 11-07 Process Protection System Replacement + (15:01:02, 18 September 2018)
- ULNRC-05774, Callaway Plant Unit 1, (Ldcn 11-0010) New Technical Specification 3.7.20 + (15:04:40, 18 September 2018)
- L-2011-471, St. Lucie, Unit 1, Information Regarding CVCS Malfunction Provided in Support of the Extended Power Uprate License Amendment Request + (15:06:31, 18 September 2018)