Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20052E920 + (12:02:04, 18 December 2024)
- 05000272/LER-1982-026, Forwards LER 82-026/03L-0.Detailed Event Analysis Encl + (12:02:06, 18 December 2024)
- ML20052E915 + (12:02:07, 18 December 2024)
- ML20052E914 + (12:02:07, 18 December 2024)
- 05000331/LER-1982-025-03, /03L-0:on 820404,suppression Chamber to Drywell Vacuum Breaker Valve CV-4327D Failed to Close Completely. Caused by Pneumatic Cylinder Piston Stuck in mid-position. Piston Lubed & Valve Tested Satisfactorily + (12:02:09, 18 December 2024)
- IR 05000213/1982004 + (12:02:15, 18 December 2024)
- ML20052E911 + (12:02:16, 18 December 2024)
- ML20052E909 + (12:02:17, 18 December 2024)
- ML20052E907 + (12:02:17, 18 December 2024)
- ML20052E905 + (12:02:23, 18 December 2024)
- ML20052E902 + (12:02:29, 18 December 2024)
- 05000331/LER-1982-025, Forwards LER 82-025/03L-0 + (12:02:31, 18 December 2024)
- ML20052E897 + (12:02:39, 18 December 2024)
- A02322, Agrees W/Conditions Described in Based on Assumptions That Section 3.3.1.4 of Modified Amended Security Plan Is Still Valid Alternative & That Unescorted Access Status Be Reinstated W/O Further Screening + (12:02:45, 18 December 2024)
- ML20052E895 + (12:02:46, 18 December 2024)
- ML20052E894 + (12:02:52, 18 December 2024)
- ML20052E893 + (12:02:53, 18 December 2024)
- RBG-12-583, Interim Deficiency Rept Re Possible Unsatisfactory Insps Performed by Former Field QC Inspector,Initially Reported 820329.Re-evaluation of Insps Continuing.Next Status Rept Will Be Provided by 820806 + (12:02:59, 18 December 2024)
- ML20052E890 + (12:02:59, 18 December 2024)
- B10473, Forwards Responses to Open Items Identified in NRC Re SEP Topic III-6, Seismic Design Considerations. One Oversize Drawing Encl.Aperture Card Is Available in PDR + (12:03:06, 18 December 2024)
- ML20052E886 + (12:03:08, 18 December 2024)
- ML20052E885 + (12:03:08, 18 December 2024)
- ML20052E883 + (12:03:09, 18 December 2024)
- 05000249/LER-1982-019-01, /01T-0:on 820417,while Conducting ASME Class I Hydrostatic Test During Shutdown,Water Discovered Leaking from LPCI Check Valve 3/4-inch Test Equalizing Line.Caused by Inadequate Piping Support + (12:03:10, 18 December 2024)
- ML20052E880 + (12:03:11, 18 December 2024)
- 05000249/LER-1982-019, Forwards LER 82-019/01T-0 + (12:03:13, 18 December 2024)
- ML20052E877 + (12:03:14, 18 December 2024)
- ML20052E875 + (12:03:18, 18 December 2024)
- ML20052E871 + (12:03:22, 18 December 2024)
- ML20052E867 + (12:03:29, 18 December 2024)
- IR 05000373/1982018 + (12:03:35, 18 December 2024)
- B10497, Informs That Schedule for Implementing Corrections to Terminal Blocks & Set Screw Connectors Per Generic Ltr 82-09 & NRC 810610 Safety Evaluation Established.Justification for Interim Operation Encl + (12:03:41, 18 December 2024)
- ML20052E862 + (12:03:48, 18 December 2024)
- 05000272/LER-1982-024-03, /03L-0:on 820410,during Surveillance Testing,Svc Water Flow to Containment Fan Coil Unit 12 Was Less than Required.Caused by Stuck Flow Control Valve 12SW223.Valve Exercised + (12:03:50, 18 December 2024)
- ML20052E859 + (12:03:51, 18 December 2024)
- ML20052E854 + (12:03:57, 18 December 2024)
- ML20052E857 + (12:03:57, 18 December 2024)
- RBG-12-592, Forwards Revisions to Physical Security Plan. Revisions Withheld (Ref 10CFR2.790) + (12:03:58, 18 December 2024)
- ML20052E850 + (12:04:03, 18 December 2024)
- IR 05000285/1982005 + (12:04:09, 18 December 2024)
- 05000316/LER-1982-031-03, /03L-0:on 820330,during Preventive Maint Insp,Roll Up Fire Door 314 Would Not Close Upon Automatic Closure Activation.Caused by Adjusting Wheel Rivets Missing from Automatic Closure Mechanism.Discharge Spring Adjusted + (12:04:11, 18 December 2024)
- ML20052E843 + (12:04:12, 18 December 2024)
- 05000316/LER-1982-030-03, /03L-0:on 820401,both Steam Generator 1 Stop Valve Dump Valves Were Isolated at Same Time.Caused by Incorrect Orientation of Selector Valve MMO-210 During Initial installation.MMO-210 Will Be Reinstalled + (12:04:13, 18 December 2024)
- ML20052E837 + (12:04:20, 18 December 2024)
- ML20052E838 + (12:04:20, 18 December 2024)
- 05000316/LER-1982-029-03, /03L-0:on 820330,during Startup,Steam Generator 3 Stop Valve MRV-230 Pillar Stem Wipers Found Displaced from Bearing Assemblies.Caused by Nonparallel Alignment of Pillars.Split Ring Retainers Fabricated & Welded + (12:04:21, 18 December 2024)
- ML20052E833 + (12:04:26, 18 December 2024)
- ML20052E831 + (12:04:26, 18 December 2024)
- ML20052E830 + (12:04:27, 18 December 2024)
- ML20052E829 + (12:04:27, 18 December 2024)
- A02373, Responds to 820317 Request for Addl Info Re SEP Topic VI-1, Organic Matls & Post-Accident Chemistry + (12:04:37, 18 December 2024)