ML20052E886
| ML20052E886 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 05/04/1982 |
| From: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| LQA8200143, NUDOCS 8205110512 | |
| Download: ML20052E886 (5) | |
Text
o GENERAL OFFICE Nebraska Public Power District
" "%ttA'o""n#%^M^ "*'"
LQA8200143 A
May 4, 1982 s
t REceryyy
,9 Mg1 g ;gg,h 2 U.S. Nuclear Regulatory Commission g-133M W15uarcantam $
t.qgg Attention:
Mr. Darrell G. Eisenhut, Director nog ##
Division of Licensing 1
j, Washington, DC 20555
Subject:
NRC Demands on NPPD Resources
Dear Mr. Eisenhut:
Your letter of April 12, 1982 requested various information relating to establishing a mutually understood inventory of the workload facing NPPD and the NRC.
The following are in response to your various requests:
Request 1 Review the attached (lE Bulletin listings and NUREG 0748), confirm its applicability to CNS, and identify any additional items that will compete for your resources over the next two years.
Include a total inventory of what you see facing you in the next couple of years including resources and plant shutdown impact.
Response
The attached printout from the Licensing Department Action Item Tracking System (AITS) provides this information in preliminary summary form. This will be used as the basis for discussions in a meeting to be held Wednesday, May 12, 1982 at 8:30 a.m. at Cooper Nuclear Station.
The following number sequences relate the AITS Action ID numbers to your request:
Action ID TAC 001-099 Multi-Plant in NRC TAC System TAC 100-199 TMI Items in NRC TAC System TAC 200-299 Plant Specific in NRC TAC System TAC 300-399 Active on NPPD AITS TAC 400-499 Future requirements from NRC TAC 500-599 Future NPPD initiated items 0o0\\
$$%*8EfoSSSShS 6p o
P
s Mr. Darrell G. Eisenhut May 4, 1982 Page 2 It should be noted that the applicability of many of these i; ems were discussed in a site visit by our NRC Project Manager April 7, 1982.
Impact is denoted under the " RESP" column utilizing the following code:
Example:
I=MP; SD; $
Where:
1 = impact MP = manpower SD = plant shutdown
$ = financial Similarly, priorities are indicated in the " SOURCE" column using the following code:
NP = NRC priority from NUREG 0748 DP = District priority (Preliminary Draft)
Request 2 NPP9 thoughts as to threshold criteria that would eliminate the smaller less consequential tasks would be appreciated.
Response
E NPPD will offer suggestions at the May 12, 1982 meeting. The smaller less consequential tasks have been eliminated from the attached printout.
Request 3 NPPD thoughts as to how to enhance the efficiency and usefulness of the data collection and utilization would be appreciated.
Response
NPPD will offer suggestions at the Fby 12, 1982 meeting.
If you would like further clarification on any of the attached information, please contact me.
Sincerely, SN-(ot
' bay. Pilant Division Manager of Licensing and Quality Assurance JFT:JDW:cmk Attachment cc:
Byron Siegel
J g,
LICENSING OPEN ACTION ITEMS BEDINNINC WITH THE CHARACTED T C5-05-82 PD 1
ACTION-ID..
DESCRIPTION..
DUE.DATE SOURCE..
RESP....
. ACTION....
C.DATE ODUE
.,)
TACOO1 VITAL AREA ANALYSIS 911111 NP=1 NRC NONE I
a TACOO2 LONG TERM REVIEW CONTAINPENT PURCE 911111 NP=1 E Ds N. 09 NRC CONTRACTORS CONTINUE TO
-)
AND VENT (B-24)
RAISE GUESTIONS EP=3 J
TACOO3 SAFETY CONCERNS ASSOCIATED WITH 911111 XXXX NRC EG ISSUE STILL OPEN PIPE BREAKS IN THE BWR SCRAM SYSTEM J
TACOO4 MONITORING OF FATIQUE TRANSIENT 911111 XXXX MC NONE LIMITS FOR THE REACTOR COOLANT Jl SYSTEM TACOO5 APPENDIX J CONTAINMENT LEAK 820301 NP=2 CNSs N. 04 FW CHECK VALVE FLOOD SYSTEM
- ode Ul TESTING REQUIRED DP=3
!=MPs SD
-Q TACOO6 RPS POWER SUPPLY 820630 W=1 CNSs L.24 INSTALL MC SET DEVICE MAY 82 DP=1 I=SD
- J TAC 007 INSERVICE TESTING (IST) 820630 NP=1 NRCs N. 02 TACOOO 10 CFR 50.551(0) INSERVICE 820726 NP=1 MCs N. 02 J
INSPECTION - GENERIC TACOO9 SINGLE LOOP OPERATION 820801 NP=1 PetCs N. 08 NRC FINAL QUESTIONS DESIRED U
DP=1 TAC 010 IE BULLETIN 79-27 820930 NP=2 MtC
')
LOSS OF NON CLASS IE INST. &
CONTR. POWER. REV. & EVAL.
RESPONSES U
TAC 011 STATION-CONTROL OF HEAVY LOADS 821001 NP=2 NED: L.18 PREVIOUSLY RESOLVED ISSUE OVER SPENT FUEL POOL (NUREO 0612)
')
It =3
!=MP TACO 12 HELB AND CONSEGUENTIAL SYSTEM 821001 NP=3 NRC O
FAILURE COOPER TAC 013 BWR FEEDWATER NOZZLE AND CONTROL S21001 NP=1 NRCs L.17 O
ROD DRIVE CRACKING TAC 014 OUALIFICATIONS:
INSP. EXAM. TEST. 821001 XXXX NRC AUDIT PERSONNEL TACO!5 PEW APPENDIX R TO 10 CFR 50 821001 DP=3 NEDs L.37 PREVIOUSLY RESOLVED ISSUE Y
u REGARDING FIRE PROTECTION FEATURES
!=MPs SDs s
s Q
b.
v 9
b L
j z),3}t?
' Y. p^
1
% 4 c ;'
- y> f t j l y r; i
'U a s
-i:
y
. g(
y g;
<< g '
- a
- n h
- w yg
,a
= _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
ti LICENSING OPEN ACTION ITEMS BEDINNING WITH THE CHARACTER T C5-05-82 PD 2
ACTION-ID... DESCRIPTtON.
DUE.DATE SOURCE..
RESP..
ACTION........
C.DATE ODUE t.),
TAC 016 APPENDIX ! TECH SPEC 830101 NP=3 NPPDs N.06 COMPUTER SCHEDULING PROBLEMS IMPLEMENTATION REVIEW REPORTING & OPERABILITY i)
DP=3 I=MPs SDs s)
TAC 017 IMPLEMENTATION OF NUREG-0313 REV.
830301 DP=2 NPPDs WORK WITH EPRIs FOCUS ISI 1
L.16s 0.01 PROGRAM Lo l
TAC 018 MARK I CONTAINMENT LONO TERM 830630 NP=1 NEDs L.31 DATE IM LICENSE SRV SETPOINT &
(
PROGRAM IMPLEMENTATION MSIV CLOSURE DP=1
!=MPs SD fJ
(
TAC 101 III.A.1.2 ERF's 821001 DP=1 NPPD LACK OF DIRECTION & DUE DATE fe l
!=MP TAC 102 III.A.2 NUCLEAR DATA LINK DATA 911111 XXXX NPPDs F.09 COMPUTER SCHEDULING (J
l TAC 103 III.A.2.1 EMERGENCY PLAN UPORADE 911111 XXXX NPPD PERPETUAL SCENERIOS REQUIRED ls TO MEET RULE C
I=MP TAC 104 III.A.2.2 METEOROLOGICAL DATA 911111 DP=1 NPPD C3MPUTERs CLASS A & B MODEL UPORADE TAC 105 I.A.1.1 STA LONO TERM REQUIREMENTS 820315 XXXX NPPD VARIOUS PERSONNEL
+0D*
4i TAC 106 II.E.4.1.2 DEDICATED HYDROCEN 820630 DP=3 NPPD UNREALISTIC DATE OF 1983s PENETRATIONS ANALYSIS NEEDED i/
I=MPs SD TAC 107 II.B.1 RCS HICH POINT VENTS 820731 XXXX NPPD CONTRACTOR GUESTIONS is TAC 201 PERIODIC UPDATING OF FSAR 820901 NP=1 NPPDs L.27 BACK BURNER ITEM-LOW SAFETY IMPACT OJ DP=3 I=MP TAC 202 BWR SCRAM DISCHARCE SYS. - LT FIX 821001 DP=1 NPPDs INSTALL MAY 1982
')
v TO SDV-IV COUPLING L.01s L.20 I=SD u
!J TAC 301 I. C.1 IMPLEMENT EMERGENCY 911111 DP=1 CNS UNDER DEVELOPMENT BY BWR00 PROCEDURES CUIDELINES L
!=MP U
TAC 302 I.D.2 SAFETY PARAMETER DISPLAY 911111 XXXX NPPD COMPUTER SCHEDULINGs LACK OF v
PANEL DATE J
TAC 303 II.F.1 ACCIDENT MONITORINC 820101 DP=1 CNS INSTALL MAY 1982
+0D*
j w
i a l r
(f
[".i!
d
- ),
l 4
j.}.
y
[
-u
~
G LICENSING OPEN ACTION ITEMS BEGINNING WITH THE CHARACTER T 05-05-92 PO 3
ACTION-ID.
. DESCRIPTION.
DUE.DATE SOURCE.
RESP......
ACTION.
................. C.DATE ODUE
, i, TAC 304 IES79-018 ENVIRONMENTAL 820630 DP=3 NEDs L. 02a DATE IN LICENSE WILL SLIP OUALIFICATION 0, 19 i,
TAC 401 ATWS 911111 XXXX NPPDs O. 146 7.o FA.09 TAC 402 VARIOUS P.10NE REGUESTS (NRR AND 911111 XXXX LIC U
RI)
TAC 403 SEISMIC OUALIFICATION 911111 XXXX NEDs f;
~
'L )
TAC 501 DIESEL RELIABILITY STUDY 911111 XXXX NED TAC 502 FUEL SHIPPING PLANS 911111 XXXX LIC O.
TAC 503 STAFFING PROBLEMS 911111 XXXX NPPD j
TAC 504 PRA METHODOLOGY 911111 XXXX NED TAC 505 COMMENT ON NUCLEAR STANDARDS 911111 XXXX NED J
TAC 506 TRAINING PROGR AMS FOR GEIERAL 911111 XXXX LIC OFFICE
'_)
+
TAC 507 CNS CLEAN WATER FIRE PROTECTION 911111 XXXX NED SYSTEM
-J'
+
TAC 500 CNS ELECTRODE BOILER 911111 XXXX NED J
TAC 509 MAIN STEAM SUPPORTS IN FWHR 911111 XXXX NED TAC 510 INPO NPRDS PARTICIPATION 911111 XXXX CNS J
w TAC 511 REACTOR VESSEL FATICUE STUDY 911111 XXXX LICs L.25 w
J TAC 512 SIMPLIFY OPERATOR TEMP. & PRESS.
911111 XXXX LICs L.26 TECH SPEC CURVES i
w
47 records listed.
t)
G
.)
G
.)
o w
? 'if I I t
\\'
.}
(,
q, t
t
't I
{ {
n'.
s
>