Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20062J338 + (03:49:35, 17 December 2024)
- ML20062J337 + (03:49:36, 17 December 2024)
- BECO-93-132, Proposed Tech Specs Removing Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint + (03:49:37, 17 December 2024)
- ML20062J336 + (03:49:37, 17 December 2024)
- IR 05000302/1982009 + (03:49:45, 17 December 2024)
- ML20062J331 + (03:49:46, 17 December 2024)
- ML20062J330 + (03:49:47, 17 December 2024)
- ML20062J327 + (03:49:48, 17 December 2024)
- ML20062J325 + (03:49:50, 17 December 2024)
- 05000338/LER-1993-018, :on 931016,missed Surveillance Identified Because Daily Calorimetric Periodic Test Not Performed. Caused by Personnel Error Due to Inattention to Detail.Ni Satisfactorily Calibr + (03:49:51, 17 December 2024)
- ML20062J323 + (03:49:53, 17 December 2024)
- ML20062J322 + (03:49:53, 17 December 2024)
- ML20062J319 + (03:49:54, 17 December 2024)
- ML20062J316 + (03:49:55, 17 December 2024)
- ML20062J313 + (03:49:55, 17 December 2024)
- ML20062J312 + (03:49:56, 17 December 2024)
- ML20062J308 + (03:49:57, 17 December 2024)
- ML20062J309 + (03:49:57, 17 December 2024)
- 05000277/LER-1980-017-03, /03L-0:on 800906,during Surveillance Test at Full Power,Rhr B Subsystem Pump Room Cooler Failed to Start Automatically.Caused by Improper Adjustment of Cell Switch on Pump Breaker.Breaker Replaced & Test Completed + (03:49:59, 17 December 2024)
- IR 05000528/1982020 + (03:50:00, 17 December 2024)
- 05000259/LER-1980-070-11, /011-0:on 800919,during Review of Core Verification Video Tapes,Peripheral Bundle Ty 582 at Core Location 11-06 Discovered Rotated 90 Degrees from Required Position.Caused by Improperly Oriented 7 X 7 Fuel Assembly + (03:50:01, 17 December 2024)
- ML20062J303 + (03:50:02, 17 December 2024)
- 05000259/LER-1980-070, Forwards LER 80-070/011-0 + (03:50:03, 17 December 2024)
- ML20062J298 + (03:50:03, 17 December 2024)
- ML20062J297 + (03:50:05, 17 December 2024)
- U-602196, Application for Amend to License NPF-62,requesting Changes to TS to Improve & Reformat CPS TS Consistent w/NUREG-1434, Improved BWR-6 TS, Rev 0,Sept 1992 + (03:50:06, 17 December 2024)
- ML20062J295 + (03:50:07, 17 December 2024)
- ML20062J293 + (03:50:08, 17 December 2024)
- ML20062J292 + (03:50:09, 17 December 2024)
- ML20062J291 + (03:50:10, 17 December 2024)
- BSEP-93-0151, Corrected Ltr Changing LER 1-93-018 to 1-92-018.Copy of LER 1-92-018 Encl + (03:50:11, 17 December 2024)
- BSEP-82-1616, Provides Supplemental Response to IE Bulletins 79-02,79-07 & 79-14,per 810225 Commitment.Upon Completion of long-term Fixes Discussed Previously,Pipe Stress Analysis Summary Tables Will Be Updated to Reflect Completion of Field Mods + (03:50:12, 17 December 2024)
- ML20062J288 + (03:50:13, 17 December 2024)
- BSEP-93-0172, Forwards LER 1-92-018,Suppl 1.Encl Cover Ltr for Suppl Rept Dtd 930916,incorrectly Listed LER Number as 1-93-018 Verses 1-92-018.Copy of Suppl as Originally Submitted Attached + (03:50:14, 17 December 2024)
- ML20062J285 + (03:50:14, 17 December 2024)
- ML20062J284 + (03:50:15, 17 December 2024)
- ML20062J280 + (03:50:17, 17 December 2024)
- ML20062J282 + (03:50:17, 17 December 2024)
- ML20062J279 + (03:50:18, 17 December 2024)
- ML20062J278 + (03:50:19, 17 December 2024)
- ML20062J276 + (03:50:20, 17 December 2024)
- ML20062J275 + (03:50:21, 17 December 2024)
- ML20062J274 + (03:50:22, 17 December 2024)
- ML20062J273 + (03:50:23, 17 December 2024)
- ML20062J272 + (03:50:24, 17 December 2024)
- ML20062J266 + (03:50:29, 17 December 2024)
- ML20062J267 + (03:50:29, 17 December 2024)
- ML20062J265 + (03:50:31, 17 December 2024)
- IR 05000275/1982021 + (03:50:32, 17 December 2024)
- ML20062J260 + (03:50:33, 17 December 2024)
- ML20062J258 + (03:50:35, 17 December 2024)