Forwards IE Insp Rept 50-302/82-09 on 820327-0426 & Notice of Violation
ML20062J303
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/28/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML20062J250 List:
References
NUDOCS 8208160324
Download: ML20062J303 (2)


See also: IR 05000302/1982009

Text

$,

MAY 2 81982.

Florida Power Corporation

ATTN: Mr. J. A. Hancock

Vice President Nuclear Operations

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

Subject: Report No. 50-302/82-09

This refers to the routine safety inspection conducted by Mr. T. Stetka of this

office on March 27 - April 26,1982, of activities authorized by NRC Operating

License No. DPR-72 for the Crystal River facility. Our preliminary findings were

discussed with Mr. T. Lutkehaus, Plant Manager, and other members of your staff,

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

Item A in the Notice of Violation is a violation of 10 CFR 50.59. As indicated

in Supplement I of the NRC Enforcement Policy, significant violations of this

type are normally classified at Severity Level Ill. However, because the

reactor was not operated under conditions exceeding Limiting Conditions for

>

Operations, we have classified the violation at Severity Level IV.

One new unresolved item is identified in the enclosed inspection report. This

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

~

8200160324 820730

PDR ADOCK 05000302

6 PDR

L 4

. .

.

. . ,

Florida Power Corporation 2 E 2 81982

Should you have any questions concerning this letter, we will be glad to discuss

them with you, i

Sincerely,  ;

1

R. C. Lewis, Director 'i'

Division of Project and

Resident Programs.

Enclosures:  :

1. Appendix A, Notice of Violation f

2. Inspection Report No. 50--302/82-09 ,

l

cc w/encls:

D. G. tiardis, Acting flanager

Nuclear Licensing

T. Lutkehaus, Plant Manager

bec w/encls: ,

NRC Resident Inspector

Document flanagement Branch  :

State of Florida

,

'.: s

.;

i ,

l

i

i j ,

.I

i

lig u _  ;

[

(d' 4 /g/s t

'

<

RII RI RI RII g 7

TS

5/ /82

dim J ge

5/ /82

VL rownlee

5/ /82

'HCD c

5/g /82

R Lewis gh. -

l 5/p82

l 1 ,

  • > '

I

! *

I

'

..

.. -. .