Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1982-066, Forwards LER 82-066/03L-0 + (03:04:35, 17 December 2024)
- ML20063C976 + (03:04:35, 17 December 2024)
- ML20063C974 + (03:04:36, 17 December 2024)
- 05000328/LER-1982-069-03, /03L-0:on 820529,2-FVC-43-2 & 2-FCV-43-11 Pressurizer Sampling Containment Isolation Valves Failed to Stroke.Caused by Low Setting of Valve Operator Air Supply Regulators.Regulators Adjusted & Valves Lubricated + (03:04:39, 17 December 2024)
- 05000416/LER-1982-025, Forwards LER 82-025/03L-0 + (03:04:40, 17 December 2024)
- ML20063C970 + (03:04:40, 17 December 2024)
- ML20063C967 + (03:04:42, 17 December 2024)
- ML20063C966 + (03:04:42, 17 December 2024)
- 05000328/LER-1982-069, Forwards LER 82-069/03L-0 + (03:04:43, 17 December 2024)
- 05000416/LER-1982-023-03, /03L-0:on 820723,Div 3 Switchgear Room CO2 Fire Protection Sys Declared Inoperable Due to Failure of Latching Mechanism to Secure Door.Caused by Failure of Striker Plate.Striker Plate Adjusted + (03:04:44, 17 December 2024)
- ML20063C960 + (03:04:46, 17 December 2024)
- ML20063C962 + (03:04:46, 17 December 2024)
- 05000416/LER-1982-023, Forwards LER 82-023/03L-0 + (03:04:47, 17 December 2024)
- ML20063C956 + (03:04:47, 17 December 2024)
- ML20063C950 + (03:04:48, 17 December 2024)
- ML20063C949 + (03:04:49, 17 December 2024)
- ML20063C945 + (03:04:49, 17 December 2024)
- ML20063C931 + (03:04:50, 17 December 2024)
- ML20063C928 + (03:04:50, 17 December 2024)
- ML20063C926 + (03:04:51, 17 December 2024)
- ML20063C925 + (03:04:52, 17 December 2024)
- 05000324/LER-1982-082-03, /03L-0:on 820722,surveillance Frequency Outlined in Test Procedure PT-01.10 Did Not Reflect Required Weekly Testing While in Operational Mode 5.Caused by Oversight in Development of Test.Periodic Test Revised + (03:04:56, 17 December 2024)
- ML20063C922 + (03:04:57, 17 December 2024)
- ML20063C920 + (03:04:58, 17 December 2024)
- ML20063C919 + (03:04:58, 17 December 2024)
- ML20063C916 + (03:04:59, 17 December 2024)
- 05000324/LER-1982-082, Forwards LER 82-082/03L-0 + (03:05:00, 17 December 2024)
- ML20063C907 + (03:05:00, 17 December 2024)
- ML20063C899 + (03:05:04, 17 December 2024)
- ML20063C903 + (03:05:04, 17 December 2024)
- ML20063C890 + (03:05:05, 17 December 2024)
- 05000416/LER-1982-024-03, /03L-0:on 820723,limiting Condition for Operation Was Entered Due to Inoperability of Zone 1006 Flame Detector in HPCS Diesel Generator East Corridor.Cause Not Stated. Detector Cleaned & Tested.Fire Watch Initiated + (03:05:07, 17 December 2024)
- 05000416/LER-1982-024, Forwards LER 82-024/03L-0 + (03:05:08, 17 December 2024)
- 05000270/LER-1982-010-01, /01T-0:on 820722,while Investigating Erroneous Instrument Readings,Upper Surge Tank Water Level Found to Be Less than 5 Ft.Caused by Stuck Suction Relief Valve on Main Feedwater Pump 2B.Valve Reseated.Instrumentation Repaire + (03:05:09, 17 December 2024)
- 05000325/LER-1982-082-03, /03L-0:on 820718,reactor Coolant Chloride Concentration Exceeded Tech Spec Limit.Caused by Leakage of High Chloride Content Main Condenser Cooling Water Into Condensate Sys.Main Condenser Water Box Leaks Repaired + (03:05:11, 17 December 2024)
- PY-CEI-NRR-1748, Requests Enforcement Discretion W/Respect to TS 3.6.1.3, Primary Containment Air Locks, Which Documents Discussions Held W/Nrc on 940128 Re Situation Where Containment Air Locks Had Inoperable &/Or Unopenable Door + (03:05:12, 17 December 2024)
- 05000325/LER-1982-082, Forwards LER 82-082/03L-0 + (03:05:13, 17 December 2024)
- 05000270/LER-1982-010, Forwards LER 82-010/01T-0.Detailed Event Analysis Encl + (03:05:14, 17 December 2024)
- ML20063C854 + (03:05:14, 17 December 2024)
- 05000325/LER-1982-076-03, /03L-0:on 820719,during Type B & C Low Level Radiation Test on Containment Isolation Equipment,Combined Leak Rate of 11 Primary Containment Valves Exceeded Tech Specs.Caused by Packing & Valve Seat Leaks.Valves Repaired + (03:05:16, 17 December 2024)
- 05000325/LER-1982-076, Forwards LER 82-076/03L-0 + (03:05:17, 17 December 2024)
- ML20063C817 + (03:05:18, 17 December 2024)
- 05000325/LER-1982-084-03, /03L-0:on 820723,review of Procedure for Channel Calibr & Functional Test of Main Steam Line High Flow instrumentation,PT-A20.1,revealed That Refueling Frequency Utilized Vs Required Quarterly Surveillance Frequency + (03:05:20, 17 December 2024)
- ML20063C811 + (03:05:21, 17 December 2024)
- 05000315/LER-1982-059-03, /03L-0:on 820720,two 4-kv Loss of Voltage Relays, 27-1-T11A & 27-2-T-11A Exceeded Tech Spec Tolerances.Caused by Instrument Drift.Diesel Generator Load Shedding Relays Readjusted to within Allowable Limits + (03:05:22, 17 December 2024)
- ML20063C804 + (03:05:23, 17 December 2024)
- ML20063C798 + (03:05:24, 17 December 2024)
- 05000325/LER-1982-084, Forwards LER 82-084/03L-0 + (03:05:25, 17 December 2024)
- ML20063C794 + (03:05:25, 17 December 2024)
- PY-CEI-NRR-1746, Forwards Rev 11 to Emergency Plan for Pnpp. Changes Reviewed in Accordance w/10CFR50.43(q) & Do Not Decrease Effectiveness of Plan + (03:05:29, 17 December 2024)
- ML20063C769 + (03:05:30, 17 December 2024)
- ML20063C779 + (03:05:30, 17 December 2024)