Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064F301 + (01:51:41, 17 December 2024)
- 05000265/LER-1994-004-03, :on 940131,control Rod Coupling Integrity Neutron Instrumentation Response Test Untimely Completed. Caused by Failure to Prioritize & Track Completion of Qcos 300-4.Procedures Revised + (01:51:43, 17 December 2024)
- 05000395/LER-1982-051-03, /03L-0:on 821202,Sys Test Procedure 145.002 Unsatisfactorily Performed on Waste Evaporator.Caused by Thermal Cut Out Switch Being Disconnected from Evaporator Distillate Pump Junction Box.Switch Replaced + (01:51:45, 17 December 2024)
- 05000416/LER-1982-151, Forwards LER 82-151/03L-0 + (01:51:52, 17 December 2024)
- ML20064F276 + (01:51:52, 17 December 2024)
- 05000348/LER-1978-081-03, /03L-0 on 781102:during Surveillance Test FNP-0- STP-15.0,exterior Door Seals Were Leaking.Caused by Dirty Air Lock Exterior Door Seals.Seals Cleaned & Retested Satisfactorily + (01:51:54, 17 December 2024)
- 05000348/LER-1978-080-03, /03L-0 on 781027:while in Mode 1,the Steam Line Pressure Instru Assoc W/Pressure Transmitter PT-484 Failed Low.Caused by Failure of Loop Pwr Supply isolated/non- Isolated(Nlp)Card POY-484 + (01:51:55, 17 December 2024)
- 05000335/LER-1982-063, Forwards LER 82-063/01T-0 + (01:51:56, 17 December 2024)
- 05000348/LER-1978-080, Forwards LER 78-080/03L-0, 78-081/03L-0 & 78-038/03X-1 + (01:51:58, 17 December 2024)
- 05000311/LER-1982-148, Forwards LER 82-148/03L-0.Detailed Event Analysis Encl + (01:51:59, 17 December 2024)
- 05000395/LER-1982-051, Forwards LER 82-051/03L-0.Detailed Event Analysis Encl + (01:51:59, 17 December 2024)
- ML20064F260 + (01:52:00, 17 December 2024)
- 05000338/LER-1978-113-03, /03l-0 on 780927:after maint,TV-BD100A,B,D & F Were Tested But Not Timed Prior to Return to Svc,Due to Personnel Error.Personnel Have Reviewed the Requirements + (01:52:01, 17 December 2024)
- ML20064F249 + (01:52:02, 17 December 2024)
- 05000364/LER-1982-051-03, /03L-0:on 821203,instrumentation Channel Associated W/Feed Flow Indicator FI496 Declared Inoperable When Indicator Failed Low.Caused by Leaking Equalizer Valve. Valve Repaired,Tested & Channel Returned to Svc + (01:52:04, 17 December 2024)
- L-82-562, Interim Deficiency Rept Re Insulation of Conax Support Ring Tongue Connectors.Initially Reported on 821110.Evaluation Could Not Be Completed by 821228.Completion of Testing & Evaluation Anticipated by 830128 + (01:52:05, 17 December 2024)
- ML20064F245 + (01:52:05, 17 December 2024)
- ML20064F244 + (01:52:06, 17 December 2024)
- ML20064F243 + (01:52:07, 17 December 2024)
- 05000338/LER-1978-110-03, /03l-0 on 781024:following a Reactor Trip,The Containment Bulk Avg Temp Exceeded 105 Degrees F Tech Spec Limit Due to Steam Loss to Chilled Water Sys Vacuum Refrigeration Unit + (01:52:08, 17 December 2024)
- 05000334/LER-1982-058-03, /03L-0:on 821122,while Performing Power Range Neutron Flux Channel N-NI 42 Quarterly calibr,1.84 Rate Trip Time Constant Discovered.Caused by Instrument Drift. Time Constant Adjusted to 2.24 + (01:52:10, 17 December 2024)
- 05000333/LER-1982-058-04, /04T-0:on 821217,defected Mn-54 Level in Mollusk Samples Exceeded 10 Times Control Location Sample Level. Possibly Caused by High Bioaccumulation Factor,Resulting in Accumulation of Trace Quantities in Mollusks + (01:52:13, 17 December 2024)
- 05000338/LER-1978-100, Forwards LER 78-100/01X-0, 78-110/03L-0 & 78-113/03L-0 + (01:52:15, 17 December 2024)
- 05000334/LER-1982-058, Forwards LER 82-058/03L-0 + (01:52:16, 17 December 2024)
- ML20064F222 + (01:52:17, 17 December 2024)
- 05000338/LER-1978-120-01, /01T-0 on 781121:inspec of Station Battery Racks Revealed That Racks Had Been Improperly Assembled & Installed During Constr.Deficiencies Will Be Corrected + (01:52:20, 17 December 2024)
- 05000364/LER-1982-051, Forwards LER 82-051/03L-0 + (01:52:21, 17 December 2024)
- ML20064F209 + (01:52:21, 17 December 2024)
- 05000338/LER-1978-122-01, /01T-0 on 781113:during Steady State Oper,It Was Discovered That Only One Seal or Barrier Exists for Spare Pipe Penetrations in Conflict W/Fsar Due to Oversight of Design Personnel.Engineering Is Analyzing It for Solution + (01:52:23, 17 December 2024)
- ML20064F203 + (01:52:24, 17 December 2024)
- ML20064F201 + (01:52:25, 17 December 2024)
- ML20064F199 + (01:52:25, 17 December 2024)
- 05000267/LER-1978-033-03, /03L-0 on 781027:during Routing Surveillance of Steam Pipe Rupture Detection Sys,One of Three Bistables for High Temperature Under Pcrv Did Not Trip,Due to Corroded Cable Terminal Board at Junction Box + (01:52:27, 17 December 2024)
- ML20064F197 + (01:52:28, 17 December 2024)
- ML20064F187 + (01:52:28, 17 December 2024)
- 05000338/LER-1978-120, Forwards LER 78-120/01T-0 & LER 78-122/01T-0 + (01:52:29, 17 December 2024)
- 05000333/LER-1982-058, Forwards LER 82-058/04T-0 + (01:52:30, 17 December 2024)
- ML20064F182 + (01:52:32, 17 December 2024)
- A02589, Forwards Addl Info Re safety-related ECCS Tank Outages, Provided Verbally on 821220 in Response to NUREG-0737, Item II.K.3.17 + (01:52:33, 17 December 2024)
- 05000387/LER-1982-065, Forwards LER 82-065/03L-0 + (01:52:36, 17 December 2024)
- 05000267/LER-1978-033, Forwards LER 78-033/03L-0 + (01:52:38, 17 December 2024)
- 05000336/LER-1978-029-03, /03L-0 on 781025:during Oper,Surveillance Test on Channel a Reactor Protec Sys Core Protec Calculator Reveated Sys Ground Traced to Signal for Pressurizer Pressure W/In Containment Boundary.Source Not Known at This Time + (01:52:39, 17 December 2024)
- 05000336/LER-1978-029, Forwards LER 78-029/03L-0 + (01:52:41, 17 December 2024)
- ML20064F155 + (01:52:42, 17 December 2024)
- 05000387/LER-1982-058-03, /03L-0:on 821122,during Startup Testing Program, full-in Position Lost on Rod 46-23 Causing Rod Withdrawal Block Preventing Rod Movement.Cause Unknown.Condition Would Not Repeat When Technicians Arrived to Work on Rod + (01:52:44, 17 December 2024)
- ML20064F142 + (01:52:45, 17 December 2024)
- RBG-40322, Responds to Violation Noted in Insp Rept 50-458/94-05 Re Failure to Maintain Uninterruptible Power Security Sys. Caused by Inadequate Evaluation.Temporary Compensatory Instructions for UPS Sys Security Operations Bulletin Loss + (01:52:45, 17 December 2024)
- 05000267/LER-1978-016-03, /03X-1 on 780510:while Oper at 40% Pwr,Moisture Concentrations in Pcrv Exceeded Limits of 4.2.11.Moisture Was Introduced During Previous Loop 1 Shutdown & Collected in Pcrv Insulation + (01:52:47, 17 December 2024)
- 05000267/LER-1978-016, Forwards LER 78-016/03X-1 + (01:52:48, 17 December 2024)
- 05000259/LER-1982-097-03, /03L-0:on 821203,review Revealed Several Isolation Valves Tested Less Frequently than Required by Tech Spec.Caused by Misinterpretation of NRC Guidelines When Implementing Asme,Section Xi.Instructions Revised + (01:52:50, 17 December 2024)
- ML20064F129 + (01:52:55, 17 December 2024)