TENNESSEE VALLEY AUTHORITY CH ATTANOOG A. TENNESSEE 37401 400 Chestnut Street Tower II December 28, 1982
,a c.a BLRD-50-438/82-81 g
2 c.a U.S. Nuclear Regulatory Commission Region II 3
Attn:
Mr. James P. O'Reilly, Regional Administrator c;
101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
'o c7
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNIT 1 - OVERPRESSURIZED SYSTEMS DURING FLUSHING BLRD-50-438/82 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on November 30, 1982 in iccordance with 10 CFR 50.55(e) as NCR 2089 Enclosed is our first interim report. We expect to submit our next report on or about June 27, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY
(
L. M. Mills, Manager Nuclear Licensing l
Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure) i Office of Inspection and Enforcement l
U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l
l
} gg:;;$ClM, O 'Y
,w 8301060291 821228 PDR ADOCK 05000438 S
$[S An Ecual Opportunity Eowtoyer
~~
t o
ENCLOSURE BELLEFONTE NUCLEAR PLANT U' NIT 1 OVERPRESSURIZED SYSTEMS DURING FLUSHING 10 CFR 50.55(e)
NCR 2089 BLRD-50-438/82-81 FIRST INTERIM REPORT Description of Deficiency During performance of a construction flush, portions of the Chemical Addition and Boron Recovery (NB), Makeup and Purification (NV),
Demineralized Water (RE), and Waste Disposal (WD) Systems were overpressurized to 225 psig at the low point of the NB System. The apparent cause of the overpressurization was the inadvertent closure of valve 1NV-IFCV-380 in the main flush path.
Interim Progress Drawings showing affected pipe and valves are being reviewed and evaluated for determination of corrective action. Results of the review and evaluation will be provided in the next report.