Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065K583 + (00:32:13, 17 December 2024)
- ML20065K579 + (00:32:13, 17 December 2024)
- ML20065K571 + (00:32:14, 17 December 2024)
- NRC-94-0021, Responds to NRC Re Violations Noted in Insp Rept 50-341/94-04.Corrective Actions:Assembly & Accountability Must Be Performed Immediately Upon Declaration of Alert or Higher Emergency + (00:32:15, 17 December 2024)
- ML20065K557 + (00:32:16, 17 December 2024)
- IR 05000336/1981026 + (00:32:18, 17 December 2024)
- 05000413/LER-1990-030, :on 901023,TS 3.0.3 Entered Due to Two Inoperable Trains of Control Room Area Ventilation Sys.W/ + (00:32:20, 17 December 2024)
- 05000325/LER-1990-014, :on 900907,ESF/RPS Actuation Occurred When Electrical Protection Assembly 2 Opened on Under Frequency & RPS Bus a Tripped Due to Failed Circuit Board + (00:32:22, 17 December 2024)
- 05000324/LER-1990-017-02, :on 901023,ESF Actuation Occurred Due to Blown Fuse in Main Steam Line B & Reactor Bldg Ventilation Radiation Monitoring Power Supply B + (00:32:24, 17 December 2024)
- 05000313/LER-1990-013-02, :on 901026,discovered That Location of safety- Related Svc Water Piping in Close Proximity to High Energy Main Feedwater Line + (00:32:36, 17 December 2024)
- 05000313/LER-1990-015-01, :on 901026,irradiated Fuel Handling Operations Commenced W/Greater than Tech Specs Allowed + (00:32:41, 17 December 2024)
- 05000247/LER-1982-036-03, /03L-0:on 820825,temporary Change Procedure Authorized to Permit Simultaneous Operation Under Load of Two Diesel Generators During Surveillance Test,Potentially Reducing Degree of Redundancy.Test Procedure PTM-21 Changed + (00:32:46, 17 December 2024)
- 05000416/LER-1994-003-02, :on 940310,unacceptable Vibration Reading Were Obtained During Run SSW Pump Declared Inoperable.Caused by Accelerated Degradation of Carbon Steel Bolts in Coupling. SSW Pumps Were Disassembled + (00:32:49, 17 December 2024)
- ML20065K501 + (00:32:50, 17 December 2024)
- 05000412/LER-1990-018, :on 901026,ESF Actuation - Inadvertent Diesel Start Occurred & Deficiency Discovered in D/G Ventilation Fan Circuit + (00:32:51, 17 December 2024)
- 05000334/LER-1990-017-01, :on 901027,auxiliary Bldg Ventilation Relignment Occurred Due to Radiation Monitor Alarm + (00:32:55, 17 December 2024)
- 05000247/LER-1982-036, Forwards LER 82-036/03L-0 + (00:32:56, 17 December 2024)
- 05000317/LER-1990-029, :on 901024,discovered That TS 3.8.1.1, Electrical Power Sys,Ac Sources Not Performed within Required 8 H Periodicity.Caused by Personnel Error + (00:33:01, 17 December 2024)
- 05000318/LER-1990-001-01, :on 901022,inadvertent ESF Actuation Occurred Due to Insufficient Communication of Plant Status + (00:33:03, 17 December 2024)
- 05000277/LER-1990-030, :on 901024,control Room Emergency Ventilation Actuation Occurred Due to Inadvertent Opening of 480 Volt Breaker + (00:33:05, 17 December 2024)
- ML20065K482 + (00:33:06, 17 December 2024)
- 05000454/LER-1990-010, :on 900818,1A Auxiliary Feedwater Pump Auto Start Due to Module Failure + (00:33:08, 17 December 2024)
- 05000412/LER-1994-003, :on 940314,TS 3.0.3 Inadvertently Entered for Under 1 H While Returning Train a Svc Water Pump to Service. Caused by Improper Testing Sequence.Test Preparation Section in Test Procedure Ost 2.30.6 Will Be Clarified + (00:33:10, 17 December 2024)
- 05000317/LER-1982-053-03, /03X-1:on 820910,hydrogen Analyzer O-AE-6519 Adjusted Out of Calibr During Initial Training Exercise, Rendering Unit Inoperable.Caused by Erroneous Adjustment Step in Chemistry Procedure.Procedure Revised + (00:33:12, 17 December 2024)
- 05000348/LER-1990-007, :on 901013,preaction Fire Protection Sys Clapper Valves Failed to Trip + (00:33:14, 17 December 2024)
- 05000317/LER-1982-053, Forwards LER 82-053/03X-1 & Corrected Prompt Rept RO 82-53. Repts Appropriate for Unit 1 Only + (00:33:15, 17 December 2024)
- 05000440/LER-1990-021, :on 900907,MSIV Failed to Close Following Successful Slow Closures + (00:33:24, 17 December 2024)
- ML20065K462 + (00:33:25, 17 December 2024)
- PY-CEI-NRR-1267, Forwards LERs 90-021-01 & 90-025-01 + (00:33:26, 17 December 2024)
- ML20065K454 + (00:33:27, 17 December 2024)
- 05000368/LER-1990-022-01, :on 900926,switchgear Room Cooling Units Not Seismically Qualified Due to Improper Bolting of Cooling Coil Mounting Brackets + (00:33:29, 17 December 2024)
- 05000425/LER-1990-015-02, :on 901026,missed Procedure Step Results in Inadvertent Operation of ESF Components + (00:33:30, 17 December 2024)
- 05000334/LER-1990-016-01, :on 901024,ESF Actuation - Low Head Safety Injection Recirculation Valve Closed During Testing + (00:33:32, 17 December 2024)
- 2CAN049402, Monthly Operating Rept for Mar 1994 for Arkansas Nuclear One Unit 2 + (00:33:33, 17 December 2024)
- 1CAN049402, Monthly Operating Rept for Mar 1994 for Arkansas Nuclear One Unit 1 + (00:33:36, 17 December 2024)
- 05000280/LER-1982-087-03, /03L-0:on 820901 & 20,pump 1-SW-P-10A Experienced Loss of Suction Power & on 820901,14 & 20,pump 1-SW-P-10A Experienced Similar Loss of Suction.Cause Due to Insufficient Npsh.Svc Water Replaced.Svc Water Pumps Vented + (00:33:38, 17 December 2024)
- 05000354/LER-1990-022-02, :on 901022,inadvertent Auto Start of Core Spray Pump Occurred During Maint Dept Controls Surveillance Test + (00:33:41, 17 December 2024)
- 05000354/LER-1990-023-02, :on 901022,automatic Start of E Filtration, Recirculation & Ventilation Sys Occurred + (00:33:43, 17 December 2024)
- 05000366/LER-1990-010-03, :on 901030,personnel Error Results in Missed Surveillance + (00:33:45, 17 December 2024)
- 05000325/LER-1990-022, :on 901022,primary Containment Isolation Sys Actuation of EFCV Occurred While Performing Maint Surveillance Test + (00:33:47, 17 December 2024)
- 05000302/LER-1990-017, :on 901020,pipe Restraint Disconnected,Leading to Sys Inoperability + (00:33:49, 17 December 2024)
- 05000352/LER-1990-023-01, :on 901015,emergency DGs Discovered to Be Inoperable on Various Occasions,Resulting in Condition Prohibited by Tss.Caused by Inadequate Testing of Redundant Rectifier Banks for Emergency DGs + (00:33:53, 17 December 2024)
- 05000368/LER-1990-016, :on 900716,unacceptable Work Practice Resulted in Starting of Emergency DGs During Performance of Special Work Plan.Caused by Personnel Error.Meeting Conducted to Address Subj Problem + (00:33:55, 17 December 2024)
- 05000306/LER-1990-010-02, :on 901023,inadvertent Operation of Safeguards Logic Train Pushbutton Occurred + (00:33:57, 17 December 2024)
- ML20065K410 + (00:33:59, 17 December 2024)
- 3F0494-10, Monthly Operating Rept for Mar 1994 for Crystal River Unit 3 + (00:34:00, 17 December 2024)
- ML20065K403 + (00:34:00, 17 December 2024)
- ML20065K401 + (00:34:01, 17 December 2024)
- ML20065K402 + (00:34:01, 17 December 2024)
- ML20065K398 + (00:34:02, 17 December 2024)
- ML20065K399 + (00:34:02, 17 December 2024)