Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000261/LER-1982-012-03, /03L-0:on 820906,at 94% Power,Letdown Relief Valve CVC-203 Lifted & Would Not Reseat.Caused by Water Hammer Due to Operator Error in Realignment of Charging Pump from Recirculation to Normal Operation.Operator Counseled + (00:20:49, 17 December 2024)
- 05000261/LER-1982-012, Forwards LER 82-012/03L-0 + (00:20:50, 17 December 2024)
- ML20065N611 + (00:20:51, 17 December 2024)
- ML20065N604 + (00:20:52, 17 December 2024)
- 05000416/LER-1982-067-03, /03L-0:on 820910,smoke Detectors in Zone Covering Auxiliary Bldg Corridor Area Alarmed & Would Not Reset. Caused by Accumulation of Dust on Ionization Smoke Detector Combined W/High Sensitivity Setting.Detector Cleaned + (00:20:53, 17 December 2024)
- ML20065N596 + (00:20:55, 17 December 2024)
- AECM-82-470, Forwards LER 067/03L-0 + (00:20:56, 17 December 2024)
- ML20065N590 + (00:20:56, 17 December 2024)
- W3P90-1176, Application for Amend to License NPF-38,consisting of TS Change Request NPF-38-112 Re Generic Ltr 89-01 Implementation + (00:20:57, 17 December 2024)
- ML20065N571 + (00:20:58, 17 December 2024)
- ML20065N565 + (00:20:58, 17 December 2024)
- ML20065N560 + (00:20:59, 17 December 2024)
- ML20065N559 + (00:21:00, 17 December 2024)
- ML20065N553 + (00:21:05, 17 December 2024)
- ML20065N539 + (00:21:06, 17 December 2024)
- ML20065N532 + (00:21:06, 17 December 2024)
- ML20065N526 + (00:21:07, 17 December 2024)
- 05000338/LER-1982-057-03, /03L-0:on 820910,setpoint for Turbine Impulse Pressure Comparator in Instrument Procedure Found Incorrect. Caused by Typographical Error During Procedure Revision. Procedure Corrected & Card Recalibr + (00:21:09, 17 December 2024)
- JAFP-90-0879, Monthly Operating Rept for Nov 1990 for Ja Fitzpatrick Power Plant + (00:21:10, 17 December 2024)
- 05000499/LER-1990-018-01, :on 901107,during Performance of Surveillance Procedure for Safety TS Requirements Unexplained ESF Actuations Occurred + (00:21:12, 17 December 2024)
- 05000338/LER-1982-057, Forwards LER 82-057/03L-0 + (00:21:13, 17 December 2024)
- 05000443/LER-1990-025, :on 901109,reactor Trip Due to Steam Generator low-low Level Signal Occurred + (00:21:14, 17 December 2024)
- ML20065N495 + (00:21:18, 17 December 2024)
- ML20065N493 + (00:21:22, 17 December 2024)
- 05000321/LER-1982-082-03, /03L-0:on 820911,LPCI a Inverter Tripped.Unit Placed in 7-day Limiting Condition for Operation.Caused by Failure of Output Filter Capacitor.Six Fuses & 2 Output Filter Capacitors Replaced.Inverter Placed in Svc on 820913 + (00:21:24, 17 December 2024)
- ML20065N490 + (00:21:25, 17 December 2024)
- 05000321/LER-1982-082, Forwards LER 82-082/03L-0 + (00:21:26, 17 December 2024)
- ML20065N486 + (00:21:26, 17 December 2024)
- AECM-90-0206, Responds to NRC 900927 Request for Addl Info Re Amend to License NPF-29,changing Reactor pressure-temp Limits + (00:21:28, 17 December 2024)
- ML20065N483 + (00:21:28, 17 December 2024)
- W3P90-1568, Forwards Change 1 to Rev 11 to Physical Security Plan.Encl Withheld + (00:21:29, 17 December 2024)
- AECM-90-0209, Responds to NRC Request for Addl Info Re Settlement Data for Category I Structures in Updated FSAR Figure 2.5-75 + (00:21:30, 17 December 2024)
- L-82-348, Advises That Weld re-exam Completed on 820621,in Response to IE Insp Rept 50-389/82-13.Results Made Available to Site Inspector + (00:21:31, 17 December 2024)
- ML20065N476 + (00:21:31, 17 December 2024)
- PY-CEI-NRR-1260, Forwards Dcrdr Identifying & Correcting Human Engineering Deficiencies + (00:21:32, 17 December 2024)
- ML20065N470 + (00:21:33, 17 December 2024)
- 2CAN049404, Forwards Rept of Steam Generator Tubes Plugged as Result of ISI on 940408 + (00:21:34, 17 December 2024)
- ML20065N467 + (00:21:34, 17 December 2024)
- ML20065N462 + (00:21:35, 17 December 2024)
- 3F1290-01, Forwards Improved Design Control Documentation for Crystal River Unit 3 Design Basis for Post-Accident Monitoring Instrumentation + (00:21:37, 17 December 2024)
- ML20065N461 + (00:21:37, 17 December 2024)
- ML20065N455 + (00:21:38, 17 December 2024)
- ML20065N454 + (00:21:38, 17 December 2024)
- ML20065N451 + (00:21:39, 17 December 2024)
- ML20065N450 + (00:21:40, 17 December 2024)
- 05000458/LER-1990-037, :on 901105,two Contract Employees Entered High Radiation Area in Violation of Tech Specs + (00:21:42, 17 December 2024)
- BECO-94-044, Forwards Final Rept on Status of Efforts to Establish Replacement Facility for Wellesley Reception Ctr + (00:21:43, 17 December 2024)
- ML20065N436 + (00:21:44, 17 December 2024)
- ML20065N437 + (00:21:44, 17 December 2024)
- ML20065N435 + (00:21:45, 17 December 2024)
- ML20065N432 + (00:21:45, 17 December 2024)
- ML20065N430 + (00:21:46, 17 December 2024)