Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248C714 + (19:10:17, 16 March 2025)
- IR 05000498/1989035 + (19:10:20, 16 March 2025)
- IR 05000331/1998003 + (19:10:22, 16 March 2025)
- ML20248C682 + (19:10:46, 16 March 2025)
- IR 05000382/1989023 + (19:10:58, 16 March 2025)
- L-89-345, Discusses Util Security Program Improvements & Provides Comprehensive Description & Performance Results Achieved. Fr Timmons Has Been Appointed Security Superintendent + (19:11:06, 16 March 2025)
- IR 05000232/1996001 + (19:11:13, 16 March 2025)
- IR 05000456/1998002 + (19:11:18, 16 March 2025)
- ML20248C557 + (19:11:29, 16 March 2025)
- ML20248C520 + (19:11:45, 16 March 2025)
- ML20248C508 + (19:11:49, 16 March 2025)
- 05000293/LER-1997-010-01, Forwards LER 97-010-01, Postulated Pipe Break Pressure Relieving Pathway Boundary Door Found Open During Power Operations. Ltr Contains Listed Commitments + (19:12:10, 16 March 2025)
- L-98-114, Responds to Open Issues Involving Ampacity Derating of Cables Enclosed in Thermo-Lag 330-1 Fire Barriers at BVPS Unit 2 + (19:12:13, 16 March 2025)
- NUREG-1407, Forwards Staff Evaluation of Millstone Unit 3,individual Plant Exam of External Events Submitted on 911223 Re Response to GL 88-20 .Util Capable of Identifying Severe Accidents & Vulnerabilites & Met GL 88-20,Suppl 4 + (19:12:26, 16 March 2025)
- 05000282/LER-1998-007, :on 980519,DG Logic Testing Was Performed. Caused by Four Lines of Reasoning Applied to Issue at Various Times in Past.Reviewed Control Circuits of EDGs & Control Circuits + (19:12:58, 16 March 2025)
- ML20248C332 + (19:13:02, 16 March 2025)
- NUREG-0170, Reviews Program Manager Period Rept (Pnpr 89-10).Requests Rev to Section 7.1 Subelement Objectives to Reflect Latest Draft of Fy 90-91 Operations Plan to Purge Ref to Current Effort, Update to NUREG-0170 & Replace, Transport.. + (19:13:06, 16 March 2025)
- IR 05000321/1988037 + (19:13:17, 16 March 2025)
- IR 05000373/1997023 + (19:13:49, 16 March 2025)
- ML20248C131 + (19:14:01, 16 March 2025)
- ML20248C107 + (19:14:13, 16 March 2025)
- IR 05000445/1989065 + (19:14:37, 16 March 2025)
- ML20248C014 + (19:14:41, 16 March 2025)
- TAC:66529 + (19:15:17, 16 March 2025)
- ML20248B865 + (19:15:28, 16 March 2025)
- NUREG-0133, Safety Evaluation Accepting Licensee Rev 3 to ODCM for Plant Through Temporary Change 4.Rev Meets Criteria of NUREG-0133 & Other Guidance. Guidance + (19:15:41, 16 March 2025)
- 05000334/LER-1998-020, :on 980403,use of non-calibrated Computer Points for TS Surveillance Was Noted.Caused by Inadequate Understanding & Application of TS Sr.Main Benchboard Instrumentation in CR Has Been Calibrated + (19:15:45, 16 March 2025)
- 05000293/LER-1997-023-01, Forwards LER 97-023-01 Re Both Radwaste Bldg Trucklock Doors Closed Resulting in Configuration Inconsistent W/Tornado Depressurization Analysis Assumptions + (19:15:53, 16 March 2025)
- IR 05000313/1998003 + (19:15:56, 16 March 2025)
- IR 07100231/1998201 + (19:16:06, 16 March 2025)
- IR 05000413/1989002 + (19:16:12, 16 March 2025)
- 05000293/LER-1998-008, :on 980427,discovered Section of CR High Efficiency Air Filtration Sys Seismic Class I Ductwork Being Supported by Class II Ductwork.Caused by Lack of Consistent Application of Seismic Criteria.Will Implement Mods + (19:16:15, 16 March 2025)
- NSD-NRC-98-5702, Forwards Formal Transmittal of Correspondence W Previously Sent to NRC Informally Over Period 980223-0316.Index of Attached Matl,Encl Per Request + (19:16:29, 16 March 2025)
- IR 05000413/1989025 + (19:16:45, 16 March 2025)
- IR 05000219/1985039 + (19:16:54, 16 March 2025)
- ML20248B661 + (19:19:49, 16 March 2025)
- DD-89-03, Advises That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-89-03 Expired.Commission Declined Review.Decision Became Final Action on 890522.W/Certificate of Svc.Served on 890606 + (19:19:58, 16 March 2025)
- IR 05000338/1989026 + (19:21:04, 16 March 2025)
- TXX-9812, Responds to NRC Re Violations Noted in Insp Repts 50-445/98-02 & 50-446/98-02.Corrective Actions:Reinforced Mgt Expectations Re Conduct of Activities in Switchyard & Procedure Compliance Re Receipt,Insp & Storage of New Fuel + (19:21:14, 16 March 2025)
- ML20248B464 + (19:21:38, 16 March 2025)
- TXX-8973, Supplemental Deficiency Rept CP-86-07 Re Station Svc Water Sys Leakage.Initially Reported on 860411.Estimated Completion Date for Corrective Action Items 1 & 3 Rescheduled for Completion Prior to Unit 1 Fuel Load + (19:21:39, 16 March 2025)
- IR 05000250/1989009 + (19:21:50, 16 March 2025)
- ML20248B419 + (19:22:17, 16 March 2025)
- NUREG-1275, Informs That Util Fulfilled Requirements of Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety Related Sys + (19:22:34, 16 March 2025)
- ML20248B329 + (19:22:57, 16 March 2025)
- IR 05000282/1998006 + (19:23:01, 16 March 2025)
- 3F0890-02, Responds to Violations Noted in Insp Rept 50-302/89-14. Corrective actions:short-term Instruction Issued to on-duty Operators Emphasizing Conditions Necessary to Perform Procedural Steps W/O Presence of Procedure + (19:23:09, 16 March 2025)
- IR 05000267/1989016 + (19:23:23, 16 March 2025)
- 3F0890-01, Responds to Violations Noted in Insp Rept 50-302/89-11. Corrective Action:Misplaced Tag re-hung on Correct Valve. Valve Identification Label Repositioned to More Suitable Location.Individual Counseled + (19:23:29, 16 March 2025)
- IR 05000482/1998301 + (19:23:41, 16 March 2025)
- ML20248B283 + (19:23:45, 16 March 2025)