Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069H871 + (15:43:20, 16 December 2024)
- ML20069H864 + (15:43:21, 16 December 2024)
- ML20069H861 + (15:43:22, 16 December 2024)
- ML20069H859 + (15:43:23, 16 December 2024)
- RBG-40633, Forwards Revs to Commitments Made in Responses to Violations Noted in Insp Repts 50-458/85-67 & 50-458/91-33 Involving Visitor & Escort Processing & Control + (15:43:24, 16 December 2024)
- ML20069H855 + (15:43:24, 16 December 2024)
- ML20069H844 + (15:43:26, 16 December 2024)
- 05000324/LER-1982-106-03, /03L-0:on 820917,while Reviewing Surveillance Procedures,Determined That Emergency Bus Degraded Voltage Channel Function Test Not Sufficient to Verify Operability of Emergency Bus Degraded Voltage Relays.Test Revised + (15:43:28, 16 December 2024)
- ML20069H840 + (15:43:31, 16 December 2024)
- 05000458/LER-1994-008-01, :on 940509,determined That Min Number of Operable Channels Per Trip Sys for RPS Not Maintained Due to Inadequate Work Package Review.Reviews Emphasizing Importance of Retest Requirements Conducted + (15:43:33, 16 December 2024)
- ML20069H832 + (15:43:36, 16 December 2024)
- 05000315/LER-1982-080-01, /01T-0:on 820923,discovered Analysis for Safety Injection Flow Water Temp Used Value of 70 F.Value of 80 F Used in Containment Spray Water Temp Analysis.Action Taken to Maintain Restorage Water Temp Above 80 F + (15:43:38, 16 December 2024)
- ML20069H817 + (15:43:39, 16 December 2024)
- ML20069H822 + (15:43:39, 16 December 2024)
- 05000324/LER-1982-106, Forwards LER 82-106/03L-0.Detailed Event Analysis Encl + (15:43:40, 16 December 2024)
- ML20069H809 + (15:43:40, 16 December 2024)
- ML20069H807 + (15:43:41, 16 December 2024)
- ML20069H808 + (15:43:41, 16 December 2024)
- ML20069H802 + (15:43:42, 16 December 2024)
- 05000315/LER-1982-080, Forwards LER 82-080/01T-0 + (15:43:43, 16 December 2024)
- ML20069H800 + (15:43:43, 16 December 2024)
- ML20069H794 + (15:43:44, 16 December 2024)
- 05000306/LER-1982-017-03, /03L-0:on 820908,two Undervoltage Relays Found to Trip Outside Tolerance Band of 90 Plus or Minus 2% of Nominal Voltage.Cause Not Stated.Relays Recalibr + (15:43:46, 16 December 2024)
- 05000373/LER-1982-113-03, /03L-0:on 820816,D Fuel Pool Vent Exhaust Radiation Monitor Found Inoperable.Caused by Bad Sensor Convertor Mfg by Ge,Model 194X9276011.Convertor Replaced + (15:43:48, 16 December 2024)
- 05000387/LER-1983-040-03, /03L-0:on 830301,during Startup Test Program, Control Structure a Chlorine Detector Declared Inoperable Due to Failure of Constant Trip Feature.Caused by Excessive Drip Rate in Electrolyte.Heat Tracing Sensor Relocated + (15:43:50, 16 December 2024)
- 05000387/LER-1983-040, Forwards LER 83-040/03L-0 + (15:43:51, 16 December 2024)
- 05000373/LER-1982-113, Forwards LER 82-113/03L-0 + (15:43:52, 16 December 2024)
- ML20069H772 + (15:43:52, 16 December 2024)
- 05000346/LER-1983-014-03, /03L-0:on 830305,rod 12 of Group 7 Began to Ratchet Trip Into Core.Caused by Blown Fuse in Transfer Switch Module Assembly B Phase.Blown Fuse Replaced.Control Rod 7-12 Successfully Latched & Pulled + (15:43:54, 16 December 2024)
- 05000306/LER-1982-017, Forwards LER 82-017/03L-0 + (15:43:55, 16 December 2024)
- ML20069H754 + (15:43:55, 16 December 2024)
- 05000346/LER-1983-014, Forwards LER 83-014/03L-0 + (15:43:56, 16 December 2024)
- ML20069H746 + (15:43:56, 16 December 2024)
- ML20069H740 + (15:43:57, 16 December 2024)
- ML20069H739 + (15:43:57, 16 December 2024)
- ML20069H736 + (15:43:58, 16 December 2024)
- ML20069H733 + (15:43:58, 16 December 2024)
- ML20069H732 + (15:43:59, 16 December 2024)
- ML20069H730 + (15:44:00, 16 December 2024)
- ML20069H731 + (15:44:00, 16 December 2024)
- 05000254/LER-1982-020-03, /03L-0:on 820920 & 21,RCIC Area High Temp Isolation QIS-28,3 Switches 1-1360-14A,1-1360-17B & 1-1360-16C,would Not Trip.Cause Not Specifically Determined. Failed Switches Returned to Manufacturer for Analysis + (15:44:02, 16 December 2024)
- ML20069H727 + (15:44:03, 16 December 2024)
- ML20069H724 + (15:44:04, 16 December 2024)
- ML20069H722 + (15:44:04, 16 December 2024)
- ML20069H721 + (15:44:05, 16 December 2024)
- ML20069H720 + (15:44:05, 16 December 2024)
- HNP-94-048, Forwards Rev 7 to Security Plan,Per 10CFR50.54(p)(2).Rev Withheld + (15:44:06, 16 December 2024)
- ML20069H717 + (15:44:06, 16 December 2024)
- 3F0694-06, Forwards Rev 7 to Training & Qualification Plan.Rev Withheld + (15:44:07, 16 December 2024)
- ML20069H705 + (15:44:07, 16 December 2024)
- ML20069H697 + (15:44:08, 16 December 2024)
- 05000302/LER-1982-058-01, /01T-0:on 820924,valve Lineups Identified Which Allow Once Through Steam Generator Drain Lines to Be Used for Blowdown Operations & Also Allows High Energy Fluid Through Lines.Caused by Inadequate Review of Sys Design + (15:44:10, 16 December 2024)