Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NOC-AE-05001928, Operator Licensing National Examination Schedule. + (20:04:31, 14 March 2020)
- NEI 04-07, Response to Request No. 2 in NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (20:05:31, 14 March 2020)
- NRC 2005-0109, Nuclear Management Company Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, for Point Beach Nuclear Plant + (20:05:44, 14 March 2020)
- NL-05-094, Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (20:06:47, 14 March 2020)
- NOC-AE-05001921, License Amendment Request - Proposed Amendment to Technical Specifications to Incorporate Best Estimate Analyzer for Core Operations - Nuclear + (20:07:54, 14 March 2020)
- RA-05-0088, Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (20:09:05, 14 March 2020)
- RS-05-116, Exelon/Amergen Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (20:14:53, 14 March 2020)
- NL-05-1264, Vogtle Electric Generating Plant, September 2005 Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (20:19:25, 14 March 2020)
- LR-N05-0336, Request for Changes to Technical Specifications Relocation of Response Time Testing Time Limits to the Updated Final Safety Analysis Report + (20:26:34, 14 March 2020)
- RC-05-0132, Fitness for Duty - Semiannual Report + (20:34:27, 14 March 2020)
- ML052370433 + (20:37:33, 14 March 2020)
- ML20039F095 + (20:38:11, 14 March 2020)
- NOC-AE-05001917, Answer to NRC Order for Additional Security Measures on the Transportation of Radioactive Material Quantities of Concern (EA-05-007) + (20:38:53, 14 March 2020)
- L-05-134, July 2005 Monthly Operating Report for Beaver Valley Power Station Unit 1 & 2 + (21:00:13, 14 March 2020)
- NOC-AE-05001920, Semiannual Fitness for Duty Program Performance Report for the First Half of 2005 + (21:00:51, 14 March 2020)
- NOC-AE-05001925, Withdrawal of Request for Approval to Use Encryption Software Version 8.1 for Electronic Transmission of Safeguards Information + (21:05:48, 14 March 2020)
- NOC-AE-05001923, Response to Request for Additional Information Regarding Application for Order Approving Indirect Transfer of Control of Licenses + (21:24:39, 14 March 2020)
- NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) + (21:49:23, 14 March 2020)
- NOC-AE-05001911, Submittal of Tpdes Permit Renewal Application 01908 + (21:50:23, 14 March 2020)
- ET 05-0015, 60-Day Report for NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors + (22:03:24, 14 March 2020)
- NL-05-1207, Vogtle Electric Generating Plant, Response to a Request for Additional Information on NRC Bulletin 03-001, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors - Revision 1 + (22:05:18, 14 March 2020)
- ML052070363 + (22:09:53, 14 March 2020)
- NOC-AE-05001910, Inservice Inspection Summary Report - 1RE12 + (22:18:43, 14 March 2020)
- NOC-AE-05001908, Submittal of Operations Quality Assurance Plan Change OA-058 + (22:19:27, 14 March 2020)
- NRC 2005-0090, Response to Request for Additional Information on Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors. + (22:39:25, 14 March 2020)
- L-05-119, June 2005 Monthly Operating Report for Beaver Valley Power, Units 1 and 2 + (22:43:22, 14 March 2020)
- NOC-AE-05001907, 45-Day Response to a Request for Additional Information Related to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors + (22:45:13, 14 March 2020)
- NOC-AE-05001883, Response to a Request for Additional Information Regarding the 60 Day Response to Bulletin 2003-01: Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurize + (22:45:21, 14 March 2020)
- ML051960299 + (22:54:38, 14 March 2020)
- PLA-5916, Final Resolution to Generic Letter 2003-01 Control, Room Habitability + (23:24:16, 14 March 2020)
- SBK-L-05130, Response to NRC Bulletin 2004-01, Request 2, Inspection of Alloy 82/182/600 Materials 60-Day Report + (23:26:37, 14 March 2020)
- CPSES-200500134, Day Response to NRC Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in Fabrication of Pressurizer Penetrations & Steam Space Piping Connections at Pressurized Water Reactors, Revision 1 of NRC Order EA-03-009.. + (23:28:54, 14 March 2020)
- NOC-AE-05001902, Application for Order Approving Indirect Transfer of Control of Licenses + (23:30:45, 14 March 2020)
- ML20039D873 + (23:41:36, 14 March 2020)
- ML051800312 + (23:44:38, 14 March 2020)
- ML20039D859 + (23:46:06, 14 March 2020)
- ML20039D735 + (23:52:55, 14 March 2020)
- ML20039D725 + (23:55:46, 14 March 2020)
- L-2005-133, May 2005 Monthly Operating Report for Turkey Point Units 3 & 4 + (00:01:13, 15 March 2020)
- NOC-AE-05001890, Response to NRC BL-04-001, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors. + (00:10:04, 15 March 2020)
- 3F0605-01, License Amendment Request 289, Revision 1 Revised Improved Technical Specifications (ITS) 3.5.2, Emergency Core Cooling Systems (ECCS) - Operating, 3.6.6, Reactor Building Spray and Containment Cooling Systems, 3.7.8, Decay. + (00:15:19, 15 March 2020)
- NOC-AE-05001882, Radioactive Effluent Release Report for 2004 + (00:26:35, 15 March 2020)
- NOC-AE-05001896, Day Response to NRC Bulletin 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity + (00:26:59, 15 March 2020)
- ML051530457 + (00:41:58, 15 March 2020)
- ML051530454 + (00:42:20, 15 March 2020)
- ML051530453 + (00:42:44, 15 March 2020)
- ML051530451 + (00:43:09, 15 March 2020)
- NOC-AE-05001889, Response to NRC Guidance Regarding Mitigation Strategies + (00:56:36, 15 March 2020)
- L-2005-114, April 2005 Monthly Operating Report for St Lucie Units 1 & 2 + (01:08:17, 15 March 2020)
- L-05-088, April 2005 Monthly Operating Report for Beaver Valley, Units 1 & 2 + (01:08:32, 15 March 2020)
- NRC 2004-0064, Transmittal of Point Beach, Units 1 and 2 - Emergency Plan Implementing Procedure, Revision to Emergency Action Levels + (01:26:03, 15 March 2020)