- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 1 - Figure 1.2-4 Through Figure 1.11-8 + (02:11:43, 14 July 2018)
- NL-13-130, Indian Point, Unit 2 - Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 1 - Introduction and Summary + (02:11:50, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 6 - Figure 6.4-3 Through Figure 6.4-4 + (02:11:57, 14 July 2018)
- NL-13-130, Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 24, Chapter 6 - Figure 6C-6, Through Figure 6D-2 + (02:12:03, 14 July 2018)
- ULNRC-06048, Callaway, Unit 1, 10 CFR 50.55a Request: Proposed Alternative to ASME Section Xi Requirements Regarding System Leakage Tests of Class 1 Piping and Components Isolated Between Normally Closed Valves + (02:12:43, 14 July 2018)
- RS-13-151, LaSalle County Station Drawing S-79, CSCS Pond Water Inlet Chutes Plan & Sections, Revision H + (03:15:54, 14 July 2018)
- RS-13-151, LaSalle County Station, Units 1 & 2, Response to Request for Additional Information Re License Amendment Request to Technical Specification 3.7.3, Ultimate Heat Sink (Uhs). + (03:15:59, 14 July 2018)
- DCL-13-092, Diablo Canyon Power Plant Units 1 & 2, Submittal of Technical Specification Bases, Revision 8 + (03:21:51, 14 July 2018)
- DCL-13-016, Attachment 4 to DCL-13-016, WCAP-17696-NP, Revision 0, Westinghouse Setpoint Calculations for the Diablo Canyon Power Plant Digital Replacement Process Protection System. + (04:07:59, 14 July 2018)
- DCL-13-016, Attachment 3 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3596 + (04:08:03, 14 July 2018)
- DCL-13-016, Attachment 2 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3599 + (04:08:07, 14 July 2018)
- DCL-13-016, Attachment 1 to DCL-13-016 - Westinghouse Authorization Letter, CAW-13-3598 + (04:08:15, 14 July 2018)
- RC-13-0130, Virgil C. Summer, Units 1, Transmittal of WCAP-17758-NP, Revision 0, Technical Basis for Westinghouse Embedded Flaw Repair for V.C. Summer Unit 1 Reactor Vessel Head Penetration Nozzles and Attachment Welds + (05:00:23, 14 July 2018)
- NL-13-1555, Enclosure 1, Including Attachments 1 to 8: Licensing Summary of Walkdown Report. Part 1 of 7 + (05:01:54, 14 July 2018)
- NL-13-1555, Joseph M. Farley Unit 2, Updated Seismic Recommendation 2.3 Walkdown Report Requested by NRC Letter, Request for Information Re Recommendations 2.1, 2.3 & 9.3 of the Near-Term Task Force Review of Insights from Fukushima Dai Ichi Accident + (05:01:58, 14 July 2018)
- RA-13-001, C-S-1-45893-CALC 000 4 + (05:11:00, 14 July 2018)
- ULNRC-06032, Callaway Plant Unit 1 - Response to RAI Set 26 and Amendment 26 to the Callaway LRA + (05:30:19, 14 July 2018)
- ULNRC-06027, Callaway Energy Center NPDES Permit Renewal Application - MO-0098001 + (05:38:12, 14 July 2018)
- ULNRC-06027, Callaway, Unit 1, Transmittal of NPDES Permit Renewal Application + (05:38:21, 14 July 2018)
- ULNRC-06027, Drawing NPDES-004, NPDES Outfalls Receiving Streams Map + (05:38:25, 14 July 2018)
- ULNRC-06027, Drawing NPDES-002, Storm Water Outfalls 010-015 Topographical Map & Drainage Areas + (05:39:59, 14 July 2018)
- ULNRC-06027, Drawing NPDES-001, NPDES Storm Water Information Outfalls 010-015 + (05:40:09, 14 July 2018)
- NL-13-1601, Joseph M. Farley, Units 1 and 2, Evacuation Time Estimate Update + (06:48:01, 14 July 2018)
- NL-13-1605, Vogtle, Units 1 and 2, Evacuation Time Estimate Update + (06:48:16, 14 July 2018)
- NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 14 of 14 + (07:07:13, 14 July 2018)
- NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 13 of 14 + (07:07:17, 14 July 2018)
- NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 12 of 14 + (07:07:21, 14 July 2018)
- NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 11 of 14 + (07:07:26, 14 July 2018)
- NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 10 of 14 + (07:07:30, 14 July 2018)
- NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 9 of 14 + (07:07:34, 14 July 2018)
- NL-13-1236, SNCV061-RPT-02, Ver. 2.0, Vogtle Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic. Part 8 of 14 + (07:07:39, 14 July 2018)
- BVY 13-061, VY-RPT-12-00019, Revision 1, Vermont Yankee Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page 160 of 505 of Attachment C Through Page 369 of 505 of Attachment C + (07:36:40, 14 July 2018)
- BVY 13-061, VY-RPT-12-00019, Revision 1, Vermont Yankee Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page 159 of 505 of Attachment C + (07:36:51, 14 July 2018)
- BVY 13-061, VY-RPT-12-00019, Revision 1, Vermont Yankee Seismic Walkdown Submittal Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page 83 of 198 of Attachment D Through End + (07:37:01, 14 July 2018)
- NL-13-1257, FNP-2-ESP-0.2, Revision 16 - Farley Nuclear Plant Event Specific Procedure FNP-2 - ESP-0.2 Natural Circulation Cooldown to Prevent Reaction Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257 + (07:42:10, 14 July 2018)
- NL-13-1257, FNP-1-ESP-0.4, Revision 21 - Farley Nuclear Plant Event Specific Procedure FNP-1-ESP-0-4 Natural Circulation Cooldwn with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257 + (07:42:16, 14 July 2018)
- NL-13-1257, FNP-1-ESP-0.3, Revision 13 - Farley Nuclear Plant - Event Specific Procedure FNP-1 - ESP-0.3 - Natural Circulation Cooldown with Allowance Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257 + (07:42:21, 14 July 2018)
- NL-13-1257, FNP-1-ESP-.02, Revision 19 - Farley Nuclear Plant - Event Specific Procedure FNP-1- ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257 + (07:42:28, 14 July 2018)
- NL-13-1257, FNP-0-ESB-0.4, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.4- Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257 + (07:42:34, 14 July 2018)
- NL-13-1257, FNP-0-ESB-0.3, Version 2.0 - Farley Nuclear Plant - Specific Background Document for FNP-1/2 - ESP-0.3 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding (with Rvlis), Enclosure 3 to NL-13-1257 + (07:43:10, 14 July 2018)
- NL-13-1257, FNP-0-ESB-0.2, Version 2.0 - Farley Nuclear Plant, Specific Background Document for FNP-1/2 - ESP-0.2 - Natural Circulation Cooldown to Prevent Reactor Vessel Head Steam Voiding, Enclosure 3 to NL-13-1257 + (07:43:15, 14 July 2018)
- NL-13-1257, FNP-2-ESP-0.4, Revision 18 - Farley Nuclear Plant Event Specific Procedure FNP-2-ESP-0-4 Natural Circulation Cooldown with Allowance for Reactor Vessel Head Steam Voiding (Without Rvlis), Enclosure 3 to NL-13-1257 + (07:44:33, 14 July 2018)
- NL-13-1257, DOEJ- FRSNC419117 - M001 - Southern Nuclear Operating Company - Documentation of Engineering Judgment, CST Volume Requirements Per Plant Transient Events, Enclosure 2 to NL-13-1257 + (07:44:39, 14 July 2018)
- TAC:MF0997 + (09:02:20, 14 July 2018)
- TAC:MF2271 + (09:30:16, 14 July 2018)
- TAC:MF0779 + (09:46:27, 14 July 2018)
- TAC:ME9566 + (10:15:01, 14 July 2018)
- TAC:MF1773 + (10:18:31, 14 July 2018)
- NL-13-075, Applicant'S Motion for Clarification Regarding the Timing of Adjudicatory Submissions Related to Entergy Letter NL-13-075 + (10:38:59, 14 July 2018)
- NL-13-089, Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 1 of 6 + (10:57:02, 14 July 2018)
- NL-13-089, Indian Point, Unit 3, Enclosure to NL-13-089, Seismic Walkdown Report Update, Part 6 of 6 + (10:59:59, 14 July 2018)