- ML20083K750 + (10:35:24, 14 December 2024)
- ML20083K749 + (10:35:25, 14 December 2024)
- 05000277/LER-1978-050-03, /03L-0 on 781221:during Routine Surveillance Test, Time to Reach Rated V & Hz for E2 Diesel Was 11 Seconds, & 13 Seconds for E3 Diesel.Probably Due to Faulty Woodward Governor + (10:35:27, 14 December 2024)
- ML20083K738 + (10:35:30, 14 December 2024)
- ML20083K737 + (10:35:31, 14 December 2024)
- ML20083K736 + (10:35:31, 14 December 2024)
- ML20083K735 + (10:35:32, 14 December 2024)
- ML20083K734 + (10:35:34, 14 December 2024)
- ML20083K730 + (10:35:35, 14 December 2024)
- ML20083K729 + (10:35:35, 14 December 2024)
- ML20083K728 + (10:35:36, 14 December 2024)
- ML20083K725 + (10:35:37, 14 December 2024)
- ML20083K727 + (10:35:37, 14 December 2024)
- ML20083K724 + (10:35:38, 14 December 2024)
- ML20083K720 + (10:35:38, 14 December 2024)
- ML20083K718 + (10:35:39, 14 December 2024)
- ML20083K716 + (10:35:40, 14 December 2024)
- ML20083K710 + (10:35:40, 14 December 2024)
- ML20083K709 + (10:35:41, 14 December 2024)
- ML20083K708 + (10:35:42, 14 December 2024)
- 05000298/LER-1978-039-03, /03L-0 on 781206:while Performing Surveillance Test After No 1 Diesel Generator Was Out of Svc for Maint,Diesel Engine Failed to Reach Full Speed.Caused by Reduced Air Pressure + (10:35:43, 14 December 2024)
- 05000298/LER-1978-039, Forwards LER 78-039/03L-0 + (10:35:44, 14 December 2024)
- 05000348/LER-1978-092-03, /03L-0 on 781229:during FNP-1-STP-20.0,pentration Room Exhaust Fan 1B Would Not Run for Required 15 Min.Caused by Dirt Buildup in Exhaust Fan Motor Resulting in Bearing Failure & Power Supply Trip While Running + (10:35:46, 14 December 2024)
- 05000348/LER-1978-092, Forwards LER 78-092/03L-0 + (10:35:47, 14 December 2024)
- 05000366/LER-1979-003-03, /03L-0 on 790102:in Cold Shutdown While Performing HNP-2-3173 on Reactor Pressure Switch 2B21-N021C,setpoint Found Above 600 Psig for Switch No 2.Caused by Switch Setpoint Drift + (10:35:49, 14 December 2024)
- ML20083K679 + (10:35:50, 14 December 2024)
- ML20083K675 + (10:35:51, 14 December 2024)
- ML20083K671 + (10:35:54, 14 December 2024)
- 05000366/LER-1979-003, Forwards LER 79-003/03L-0 + (10:35:55, 14 December 2024)
- 05000298/LER-1978-038-03, /03L-0 on 781208:during Normal Operation,One Struthers Wells Cross Connect Valve Failed to Open During Surveillance Procedure.Caused by Mfg Error + (10:35:57, 14 December 2024)
- ML20083K661 + (10:36:01, 14 December 2024)
- ML20083K659 + (10:36:02, 14 December 2024)
- 05000298/LER-1978-038, Forwards LER 78-038/03L-0 + (10:36:03, 14 December 2024)
- ML20083K650 + (10:36:03, 14 December 2024)
- 05000318/LER-1978-049-03, /03L-0 on 781225:during Normal Operation,Cracked Weld Was Found on Suction Line of 23 Reactor Cooling Pump, Due to Crack in Charging Pump Suction Line Pumping + (10:36:05, 14 December 2024)
- 05000318/LER-1978-050-03, /03L-0 on 781225:during Surveillance Test,Leakage Was Found to Be 1.46 Gallons Per Minute.Reactor Was Shut Down.Cracked Weld Was Found on 21A Upper Seal Pressure Sensing Line,Caused by Fatigue + (10:36:07, 14 December 2024)
- 05000318/LER-1978-049, Forwards LER 78-049/03L-0 + (10:36:08, 14 December 2024)
- ML20083K626 + (10:36:09, 14 December 2024)
- 05000366/LER-1979-004-03, /03L-0 on 790104:review of HNP-2-3610-0 (RHR Pump Operability) Data Sheet Revealed Pump Delta Requirements Not Met.Caused by Personnel Error Resulting from New Procedures + (10:36:10, 14 December 2024)
- ML20083K622 + (10:36:11, 14 December 2024)
- 05000318/LER-1978-050, Forwards LER 78-050/03L-0 + (10:36:12, 14 December 2024)
- ML20083K604 + (10:36:13, 14 December 2024)
- ML20083K609 + (10:36:13, 14 December 2024)
- ML20083K602 + (10:36:14, 14 December 2024)
- 05000366/LER-1979-004, Forwards LER 79-004/03L-0 + (10:36:15, 14 December 2024)
- ML20083K600 + (10:36:15, 14 December 2024)
- B15175, Supplements Relief Request (IR-19) Made on 941216 Re Performance of Volumetric Exam of Inner Radius of SG Main Steam Nozzles at Millstone Unit 3 + (10:36:16, 14 December 2024)
- ML20083K595 + (10:36:17, 14 December 2024)
- ML20083K596 + (10:36:17, 14 December 2024)
- ML20083K594 + (10:36:18, 14 December 2024)
- 05000267/LER-1978-040-03, /03L-0 on 781227:upset in Moisture Monitor Nitrogen Supply Sys Caused Cooling Gas Supply to Be Unstable.Caused by Severe Upset to Nitrogen Cooling Sys; Resultant Temp Rise Made Detectors Inoperable + (10:36:20, 14 December 2024)