Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083L251 + (10:32:38, 14 December 2024)
- ML20083L248 + (10:32:39, 14 December 2024)
- ULNRC-03209, Monthly Operating Rept for Apr 1995 for Callaway Plant Unit 1 + (10:32:39, 14 December 2024)
- ML20083L238 + (10:32:43, 14 December 2024)
- ML20083L236 + (10:32:44, 14 December 2024)
- ML20083L237 + (10:32:44, 14 December 2024)
- ML20083L228 + (10:32:45, 14 December 2024)
- 3F0484-11, Requests Change to Inservice Testing Requirements Allowing Pump Operational Tests to Be Performed Quarterly as Specified in ASME Code,Section IWP-3400 1980 Edition + (10:32:46, 14 December 2024)
- ML20083L222 + (10:32:47, 14 December 2024)
- ML20083L221 + (10:32:48, 14 December 2024)
- ML20083L218 + (10:32:49, 14 December 2024)
- ML20083L219 + (10:32:49, 14 December 2024)
- PLA-2140, Second Interim Deficiency Rept Re Base Metal Cracking in Angle Fittings.Initially Reported on 840206.Angle Fittings Added to Defective Device List & Conduit Installation Spec Revised.Also Reportable Per 10CFR21 + (10:32:50, 14 December 2024)
- 3F0484-07, Monthly Operating Rept for Mar 1984 + (10:32:51, 14 December 2024)
- ML20083L193 + (10:32:52, 14 December 2024)
- ML20083L192 + (10:32:52, 14 December 2024)
- ML20083L190 + (10:32:53, 14 December 2024)
- ML20083L178 + (10:32:56, 14 December 2024)
- ML20083L177 + (10:32:58, 14 December 2024)
- ML20083L173 + (10:32:59, 14 December 2024)
- ML20083L175 + (10:32:59, 14 December 2024)
- ML20083L171 + (10:33:00, 14 December 2024)
- ML20083L170 + (10:33:01, 14 December 2024)
- ML20083L167 + (10:33:02, 14 December 2024)
- ML20083L163 + (10:33:03, 14 December 2024)
- 05000333/LER-1995-008, :on 950326,HPCI Sys Tripped on Overspeed Due to Procedure Deficiency.Adjusted HPCI Flow Controller Output Current Limits to Limit Saturation of Controller + (10:33:04, 14 December 2024)
- 05000334/LER-1984-003, :on 840312,during Course of Planned Manual Reactor Shutdown,Reactor Trip Source Range High Neutron Flux Occurred.Caused by Personnel Error.Incident Reviewed by All Shift Supervisors + (10:33:07, 14 December 2024)
- ML20083L150 + (10:33:11, 14 December 2024)
- ML20083L143 + (10:33:11, 14 December 2024)
- ML20083L130 + (10:33:12, 14 December 2024)
- ML20083L123 + (10:33:12, 14 December 2024)
- ML20083L120 + (10:33:13, 14 December 2024)
- ML20083L113 + (10:33:14, 14 December 2024)
- ML20083L119 + (10:33:14, 14 December 2024)
- ML20083L111 + (10:33:15, 14 December 2024)
- ML20083L109 + (10:33:16, 14 December 2024)
- ML20083L103 + (10:33:17, 14 December 2024)
- ML20083L099 + (10:33:18, 14 December 2024)
- ML20083L101 + (10:33:18, 14 December 2024)
- ML20083L096 + (10:33:19, 14 December 2024)
- 05000302/LER-1984-006, :on 840313,Surveillance Requirement 4.8.1.1.1.a.2 Not Performed within Required 1 H When Emergency Diesel Generator a Taken Out of Svc for Maint. Caused by Operator Error + (10:33:20, 14 December 2024)
- ML20083L083 + (10:33:22, 14 December 2024)
- 05000285/LER-1984-003, :on 840314,while Tagging Out Instrument Inverter B for Maint,Switching Error Made,Causing Partial Loss of Dc Power.Breaker Reclosed to Restore Dc Power in Control Room + (10:33:23, 14 December 2024)
- ML20083L076 + (10:33:24, 14 December 2024)
- 05000416/LER-1984-012, :on 840314,discovered That Verification of Closed Fire Doors Once Every 24 H Did Not Include Elevator Doors.Caused Not Stated.Surveillance Revised to Include Elevator Doors + (10:33:26, 14 December 2024)
- RA-95-0086, Forwards Rev 28 to Industrial Security Plan & Rev 5 to Safeguards Contingency Plan for Plant Unit 2.Encls Withheld Per 10CFR73.21 + (10:33:27, 14 December 2024)
- 05000259/LER-1984-017-01, :on 840313,routine Functional Check for Radiation Monitor RM-90-259,which Monitors Control Room Air Supply Duct,Not Performed within Tech Spec Limits.Caused by Personnel Error.Incident Discussed W/Personnel + (10:33:28, 14 December 2024)
- ML20083L060 + (10:33:30, 14 December 2024)
- 05000313/LER-1984-002-01, :on 840316,reactor Tripped During Reactor Protective Sys Anticipatory Trip,Resulting in Loss of Both Main Feedwater Pumps.Possibly Caused by Clogged Oil Filters. Filters Changed + (10:33:31, 14 December 2024)
- ML20083L056 + (10:33:32, 14 December 2024)
- DCL-84-144, Requests That NRC Ack Receipt of Submitting Status Rept on Actions Required for Operational Readiness. All Actions Re Containment Integrity Prior to Plant Heatup Complete.W/O Encl.Related Correspondence + (10:33:33, 14 December 2024)