- 05000281/LER-1984-008, :on 840323,4160-volt Motor Leads for RHR Pump Motors Improperly Electrically Insulated W/Heat Shrinkable Matl Rated for 1,000 Volts.Caused by Inadequate Maint Procedures.Insulation Replaced + (09:55:58, 14 December 2024)
- 05000281/LER-1984-004, :on 840315,67 of 267 Snubbers Failed to Meet Acceptance Criteria Stipulated in Snubber Administrative Procedures.Snubber Program Being Revised to Provide Better Controls on Maint & Tracking of Snubbers + (09:56:00, 14 December 2024)
- TAC:10906 + (09:56:02, 14 December 2024)
- ML20084C013 + (09:56:04, 14 December 2024)
- 05000416/LER-1984-015, :on 840326,control Room Fresh Air Unit B Inadvertently Started in Isolation Mode.Caused by Technician Touching Terminal W/Jumper Which Caused Relay to Drop Out & Start Fresh Air Unit + (09:56:05, 14 December 2024)
- ML20084C005 + (09:56:06, 14 December 2024)
- ML20084B999 + (09:56:07, 14 December 2024)
- ML20084B976 + (09:56:08, 14 December 2024)
- ML20084B996 + (09:56:08, 14 December 2024)
- ML20084B975 + (09:56:09, 14 December 2024)
- ML20084B969 + (09:56:10, 14 December 2024)
- ML20084B972 + (09:56:10, 14 December 2024)
- ML20084B968 + (09:56:11, 14 December 2024)
- ML20084B962 + (09:56:12, 14 December 2024)
- ML20084B960 + (09:56:12, 14 December 2024)
- ML20084B957 + (09:56:13, 14 December 2024)
- ML20084B942 + (09:56:13, 14 December 2024)
- ML20084B936 + (09:56:14, 14 December 2024)
- ML20084B934 + (09:56:15, 14 December 2024)
- ML20084B929 + (09:56:16, 14 December 2024)
- ML20084B933 + (09:56:16, 14 December 2024)
- TXX-4155, Interim Deficiency Rept Re Discrepancy in Diesel Generator Turbocharger Thrust Bearing Lubrication.Initially Reported on 840321.Evaluation Continuing.Completion Expected by 840507 + (09:56:17, 14 December 2024)
- ML20084B925 + (09:56:17, 14 December 2024)
- ST-HL-AE-1097, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/84-02 & 50-499/84-02.Corrective Actions: Indication on Original Radiograph Caused by Rough Id Surface.Requests Violation Be Withdrawn + (09:56:18, 14 December 2024)
- ML20084B897 + (09:56:18, 14 December 2024)
- ML20084B883 + (09:56:19, 14 December 2024)
- ML20084B880 + (09:56:20, 14 December 2024)
- 05000244/LER-1976-023-03, /03L-0:on 760819,piping Installed in Safety Injection Test Line Determined to Be 3/4-inch Schedule 40 Rather than Specified Schedule 80.Caused by Inadequate Administrative Controls + (09:56:22, 14 December 2024)
- ML20084B855 + (09:56:23, 14 December 2024)
- ML20084B853 + (09:56:27, 14 December 2024)
- ML20084B854 + (09:56:27, 14 December 2024)
- 05000244/LER-1976-024, Updated LER 76-024/01O-1:on 761008,accumulation of Borated Water Found Near Valve in Safety Injection Sys Piping Between Boric Acid Tanks & Safety Injection Pumps.Caused by Chloride Stress Corrosion Cracking + (09:56:28, 14 December 2024)
- ML20084B840 + (09:56:29, 14 December 2024)
- 05000244/LER-1976-025-03, /03L-0:on 761010,during Operation of RHR Sys,Leak at Weldolet to Nipple Weld on 3/4 Inch Vent on RHR Return Line Discovered.Caused by Improper Fitup of Nipple to Socket.New Nipple Installed + (09:56:30, 14 December 2024)
- RBG-17602, Interim Deficiency Rept DR-174 Re Skewed Angle Joint Fillet Welds Supplied by Reactor Controls,Inc.Investigation Incomplete.Final Rept Will Be Provided by 840604 + (09:56:32, 14 December 2024)
- ML20084B825 + (09:56:32, 14 December 2024)
- ML20084B823 + (09:56:33, 14 December 2024)
- 05000244/LER-1976-026-03, /03L-0:on 761116,controller Output for Control Valve Spray Sodium Hydroxide Valve 836A Fell Below Limit. Caused by Poor Cold Soldered Potentiometer Wire.Joint Resoldered + (09:56:35, 14 December 2024)
- 05000244/LER-1976-027-03, /03L-0:on 761216,liquid Noticed Coming Through Insulation on 2-inch Letdown Diversion Line.Caused by Pinhole Leak in Socket Weld Between Pipe & Elbow.Section Line to Be Replaced + (09:56:37, 14 December 2024)
- 05000244/LER-1976-027, Updated LER 76-027/03O-1:on 761216,liquid Noticed Coming Through Insulation on 2-inch Letdown Diversion Line.Caused by Pinhole Leak in Socket Weld Between Pipe & Elbow.Section Line Replaced + (09:56:38, 14 December 2024)
- RBG-17609, Interim Deficiency Rept DR-177 Re Cable Supplied by Rockbestos Cable Co for Neutron Monitoring Sys.Investigation Incomplete.Next Rept Will Be Submitted by 840525 + (09:56:38, 14 December 2024)
- ML20084B759 + (09:56:39, 14 December 2024)
- ML20084B753 + (09:56:39, 14 December 2024)
- ML20084B752 + (09:56:40, 14 December 2024)
- 05000244/LER-1976-028-03, /03L-0:on 761217,during Reduced Load Operation, Control Rod F-12 Dropped Into Core.Caused by Open Circuit Point at Reactor Head Assembly Plug Connection.Complete Plug & Cable Assembly Replaced + (09:56:45, 14 December 2024)
- 0CAN018417, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/83-23 & 50-368/83-23.Corrective Actions:No Response to Violations 1 & 2 Due to Classification as No Violation.Industrial Security Plan Made Available + (09:56:46, 14 December 2024)
- ML20084B746 + (09:56:47, 14 December 2024)
- 05000244/LER-1976-029-03, /03L-0:on 761217,core Quadrant Power Tilt Ratio Calculation in Excess of Limit.Caused by Insertion of Control Rod F-12 W/Reactor at 48% Power + (09:56:48, 14 December 2024)
- ML20084B741 + (09:56:49, 14 December 2024)
- 05000244/LER-1976-030-03, /03L-0:on 761217,during Normal Rounds,Liquid Discovered Leaking from Mixed Bed Demineralizer a Inlet Pipe.Caused by Pinhole Leak in Weld Between Pipe & Elbow. Hole Repaired + (09:56:51, 14 December 2024)
- ST-HL-AE-5085, Failure to Meet Requirements of TS Due to Not Performing Required Surveillance on H Recombiner + (09:56:52, 14 December 2024)