Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20090E068 + (18:23:43, 13 December 2024)
- PMNS20200324, Meeting with Nuclear Industry to Discuss COVID-19 Regulatory Impacts with Respect to 10 CFR Part 26 and Recently Issued Letter Regarding the Exemption Process + (18:23:44, 13 December 2024)
- ML20090E048 + (18:23:46, 13 December 2024)
- A10185, Responds to NRC Re Violations Noted in Insp Rept 50-336/92-03 on 920107-10.Corrective Actions:Change to TS 4.7.6.1 Will Be Proposed to Replace Wording Operating W/ Word Aligned to Ensure Proper Sys Alignment + (18:23:47, 13 December 2024)
- ML20090E045 + (18:23:47, 13 December 2024)
- ML20090E041 + (18:23:48, 13 December 2024)
- ML20090E037 + (18:23:49, 13 December 2024)
- 05000220/LER-1975-005, :on 750401,during Testing of Emergency Ventilation Sys,Reactor Protection Sys Solenoid Valve SN-831630 Failed to Open.Caused by Broken Stem & Metal Oxide Buildup.Valves Repaired + (18:23:54, 13 December 2024)
- ELV-03478, Special Rept 2-92-1:on 920205,DG 2B Declared Inoperable Due to Negative Reactive Power.Cause Undetermined.Engine Being Tested Each Wk While Monitoring Equipment Connected to Capture Any Info Useful in Investigation of Cause + (18:23:55, 13 December 2024)
- 05000220/LER-1975-006, :on 750405,during Surveillance testing,RE-18A Reactor Level lo-lo-lo Found Actuating at 131 Rather than 128.5 Inches of Water.Caused by Instrument Drift.Instrument Recalibr + (18:23:57, 13 December 2024)
- 05000220/LER-1975-007, :on 750412,during Quarterly Testing,Ec IV 11 (AC) Failed to Open.Caused by Loose Connection in Remote Manual Wiring Terminal Block.Connection Tightened + (18:23:59, 13 December 2024)
- 05000220/LER-1975-008, :on 750414,during Normal Operation,Relay Coil in Reactor Protection Sys Relay 12K30 Shorted.Caused by Environ & High Usage.Coil Replaced + (18:24:02, 13 December 2024)
- 05000220/LER-1975-009, :on 750414,during Function Test,Average Power Range Monitor 11 Failed to Provide High Alarm.Caused by Open Transistor in Dual Alarm Unit.Transistor Replaced + (18:24:08, 13 December 2024)
- ML20090E008 + (18:24:09, 13 December 2024)
- ML20090E007 + (18:24:09, 13 December 2024)
- ML20090E006 + (18:24:10, 13 December 2024)
- 05000220/LER-1975-016, :on 750628,during Routine Surveillance Testing, Three Reactor Water lo-lo-lo Level Sensors Found Out of Calibr.Caused by Minor Setpoint Drift.Instruments Recalibr + (18:24:12, 13 December 2024)
- 05000220/LER-1975-014, :on 750618,during Monthly Testing,Standby Liquid Control Sys Pump 11 Would Not Start.Caused by Unlatched Power Breaker Trigger.Breaker Reset + (18:24:14, 13 December 2024)
- 05000220/LER-1975-018, :on 750704,during Routine Operation,Emergency Condenser Vent Radiation Monitor Went Upscale Isolating Sys as Designed.Caused by Failure of Monitor Component Due to High Temp Environ.Monitor Replaced + (18:24:16, 13 December 2024)
- 05000220/LER-1975-019, :on 750722,surveillance Test on Torus Vacuum Relief to Atmosphere Switches Not Completed.Caused by Failure to Note Recent Changes to Tech Specs.Revised Tech Specs Noted + (18:24:18, 13 December 2024)
- ML20090D962 + (18:24:19, 13 December 2024)
- L-83-469, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/83-24 & 50-251/83-24.Violation Re Retention of QA Records Denied.Procedures Listed Not Intended to Be QA Records.Completed Lineup Sheets Retained as QA Records + (18:24:20, 13 December 2024)
- ML20090D952 + (18:24:20, 13 December 2024)
- ML20090D945 + (18:24:22, 13 December 2024)
- ML20090D940 + (18:24:22, 13 December 2024)
- ML20090D926 + (18:24:25, 13 December 2024)
- ML20090D921 + (18:24:26, 13 December 2024)
- LD-92-033, Provides Revised Responses to NRC Requests for Addl Info Re Human Factors Engineering,Per + (18:24:27, 13 December 2024)
- 05000220/LER-1975-023, :on 750826,iodine Detection Sensitivity Milk Sample Found Inadequate.Caused by Failure of Contractor to Fulfill Procedural Requirements.Contractor Reinstructed + (18:24:29, 13 December 2024)
- 05000220/LER-1975-022, :on 750814,during Routine Operations,Reactor Bldg Vent Monitor Spiked Resulting in Operation of Emergency Vent Sys.Caused by Failed Solenoid & Broken Spring Plunger Nylon Tip.Tip Replaced + (18:24:31, 13 December 2024)
- LD-92-027, Forwards Summary of Interface Requirements for Sys 80+ Std Design & Corresponding Revs to C-E SSAR - Design Certification + (18:24:32, 13 December 2024)
- 05000220/LER-1975-021, :on 750802,during Routine Surveillance Test RV-30A,core Spray Sparger Tripped at 6.4 Psid Instead of Required 5 Psid.Caused by Setpoint Drift.Redundant Component Operable.Sparger Recalibr + (18:24:36, 13 December 2024)
- ML20090D890 + (18:24:37, 13 December 2024)
- ML20090D889 + (18:24:38, 13 December 2024)
- ML20090D888 + (18:24:39, 13 December 2024)
- ML20090D885 + (18:24:40, 13 December 2024)
- 2CAN032003, Cycle 28 COLR + (18:24:41, 13 December 2024)
- ML20090D879 + (18:24:42, 13 December 2024)
- ML20090D873 + (18:24:43, 13 December 2024)
- ML20090D869 + (18:24:43, 13 December 2024)
- ML20090D868 + (18:24:44, 13 December 2024)
- 05000369/LER-1992-002-02, :on 920117,error Detected in Results from Computer Program Used to Perform Power Distribution Surveillance Calculations.Caused by Design Deficiency. Program Corrected + (18:24:46, 13 December 2024)
- ML20090D863 + (18:24:47, 13 December 2024)
- ML20090D864 + (18:24:47, 13 December 2024)
- ML20090D862 + (18:24:48, 13 December 2024)
- ML20090D857 + (18:24:49, 13 December 2024)
- ML20090D860 + (18:24:49, 13 December 2024)
- ML20090D856 + (18:24:50, 13 December 2024)
- ML20090D854 + (18:24:51, 13 December 2024)
- ML20090D855 + (18:24:51, 13 December 2024)
- ML20090D853 + (18:24:52, 13 December 2024)