ML20090E068
| ML20090E068 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 07/11/1984 |
| From: | Edelman M CLEVELAND ELECTRIC ILLUMINATING CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| RDC-45(82), NUDOCS 8407190269 | |
| Download: ML20090E068 (1) | |
Text
.
Dm6
.2 3,
,,2 P.o. Box 5000 - CLEVELAND. oHlo 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG. - 55 PUBLICSQUARE Serving The Best Location in the Nation PRINCIPAL STAFF July 11, 1984 MURRAY R. EDELMAN 2A IDRPW v]f/
(i IK lCR$ h h VICE PRESIDENT NUCLEAR g-gggg Mr. James G. Keppler WN Regional Administrator, Region III Office of Inspection and Enforcement f
U.S. Nuclear Regulatory Commission g'
gg p~
799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docke t Nos. 50-440; 50-441 Location of Governor Lube Oil Cooler - S tandby Diesel Generator
[RDC 45(82)]
Dear Mr. Keppler:
Our letter to you dated April 30, 1984, indicated that Governor Lube Oil Cooler relocation was complete for both Units and that associated tubing rework was in progress, with completion anticipated by June 29, 1984, for Unit 1 and Sep tember 1,1984, for Unit 2.
Tubing rework has been completed for Unit I with site acceptance pending submittal and review of contractor documentation. This is expected to be comple te by Augus t 15, 1984. Completion of tubing rework for Unit 2 is still scheduled for Sep tember 1,1984.
Sincerely, h
Murray R. Edelman Vice President Nuclear Group MRE:pab cc:
Mr. J. A. Grobe NRC Site Office Director Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, P.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 B407190269 840711 J(JL y 0 M
</
J PDR ADOCK 05000440 s