Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000305/LER-1985-003, :on 850208,reactor Tripped.Caused by Decrease in Steam Generator Vol to Low Level Alarm Setpoints. Corrective Action Being Investigated + (11:33:29, 13 December 2024)
- ML20099G182 + (11:33:31, 13 December 2024)
- ML20099G193 + (11:33:31, 13 December 2024)
- BSEP-92-0005, Special Rept 2-SR-92-005:on 920706,fire Barrier Penetration Seal in Reactor Bldg ECCS Piping Room Declared Inoperable. LCO Expected to Expire Before Repairs Completed.Fire Watch Established & Remains in Place Pending Replacement of Seal + (11:33:32, 13 December 2024)
- ML20099G169 + (11:33:33, 13 December 2024)
- ML20099G177 + (11:33:33, 13 December 2024)
- PY-CEI-NRR-1535, Responds to NRC Re Violations Noted in Insp Rept 50-440/92-04 on 920326-0623.Corrective Actions:Previously Deferred MSIV Upgrade Mod to Be Implemented & LLRT Instructions for MSL Penetrations Will Be Revised + (11:33:34, 13 December 2024)
- ML20099G158 + (11:33:35, 13 December 2024)
- ML20099G162 + (11:33:35, 13 December 2024)
- ML20099G157 + (11:33:36, 13 December 2024)
- AECM-83-0562, 1982 Tritium Concentration in Surface Water (Quarterly Composites) + (11:33:37, 13 December 2024)
- ML20099G147 + (11:33:37, 13 December 2024)
- ML20099G140 + (11:33:38, 13 December 2024)
- ML20099G117 + (11:33:39, 13 December 2024)
- ML20099G126 + (11:33:39, 13 December 2024)
- ML20099G114 + (11:33:40, 13 December 2024)
- ML20099G108 + (11:33:41, 13 December 2024)
- ML20099G106 + (11:33:41, 13 December 2024)
- PY-CEI-NRR-0155, Advises That Info from NEDE-24988-P Re Generic BWR Safety/Relief Valve Operability Test Results Should Resolve SER Confirmatory Issue 7 + (11:33:43, 13 December 2024)
- ML20099G098 + (11:33:43, 13 December 2024)
- ML20099G077 + (11:33:45, 13 December 2024)
- ML20099G072 + (11:33:46, 13 December 2024)
- ML20099G039 + (11:33:47, 13 December 2024)
- ML20099G035 + (11:33:48, 13 December 2024)
- ML20099G027 + (11:33:49, 13 December 2024)
- BECO-85-045, Radioactive Effluent & Waste Disposal Rept Including Radiological Impact on Humans,Jul-Dec 1984 + (11:33:51, 13 December 2024)
- ML20099G020 + (11:33:52, 13 December 2024)
- ML20099F956 + (11:33:52, 13 December 2024)
- 05000397/LER-1984-113, :on 841021,reactor Protection Sys (RPS) Actuation Occurred.Cause Not Stated.Reactor Level Restored, RPS Trip Signal Reset & Plant Cooldown Continued + (11:33:54, 13 December 2024)
- 05000324/LER-1992-020, :on 920710,TS Surveillance CAC SBGTS Heater Indicated That Degraded Voltage Should Have Been Considered. Caused by Degraded Voltage at Mcc.Sbgt Heater Surveillance Will Be Revised to Compensate for Worst Case + (11:33:56, 13 December 2024)
- ML20099F931 + (11:33:57, 13 December 2024)
- 05000244/LER-1984-013, :on 841015,review of 841011 Surveillance Test Revealed Control Rod in Shutdown Bank Failed to Demonstrate Movement of at Least 10 Steps in Any Direction.Caused by Transposing Error.Control Rods Retested + (11:33:59, 13 December 2024)
- DCL-85-090, Semiannual Effluent Rept for Jul-Dec 1984 + (11:34:00, 13 December 2024)
- ML20099F925 + (11:34:01, 13 December 2024)
- ML20099F913 + (11:34:03, 13 December 2024)
- ML20099F900 + (11:34:03, 13 December 2024)
- ML20099F879 + (11:34:04, 13 December 2024)
- ML20099F873 + (11:34:06, 13 December 2024)
- ML20099F871 + (11:34:07, 13 December 2024)
- 05000317/LER-1985-002, :on 850205,reactor Tripped on Low Steam Generator Water Level Condition.Caused by Personnel Error. Event Reviewed & Training Will Be Revised If Necessary + (11:34:09, 13 December 2024)
- ML20099F859 + (11:34:10, 13 December 2024)
- ML20099F863 + (11:34:10, 13 December 2024)
- ML20099F858 + (11:34:11, 13 December 2024)
- 05000249/LER-1984-019-04, :on 841024,addl 49.3 Std Cubic Ft Per Hour Should Have Been Added to as Found Leakage Rate.Caused by Improper Calibr of Two Floor make-up Boxes.Flowmeter Calibr Pressure & Temp Verified + (11:34:13, 13 December 2024)
- 05000361/LER-1985-016, :on 850131,fuel Handling Isolation Sys Train B Actuated Due to Instrument Failure of Fuel Handling Area Vent Radiation Indicator 2R-7823.Caused by High Voltage Power Supply Loss When HV Pushbutton Released + (11:34:15, 13 December 2024)
- 05000388/LER-1985-007-01, :on 850130,during Purge of Containment,One Train of Standby Gas Treatment Sys Became Inoperable.Caused by Annunciation of Standby Gas Treatment Sys B Heater Failure Alarm.Event Reviewed W/Operators + (11:34:16, 13 December 2024)
- RBG-20240, Interim Deficiency Rept DR-263 Re Thermocouple Extension Cable Supplied by Rockbestos Co.Next Rept Anticipated by 850328 + (11:34:18, 13 December 2024)
- ML20099F775 + (11:34:18, 13 December 2024)
- 05000336/LER-1992-011-02, :on 920710,leakage Rate Test of Containment Hydrogen Purge Piping Isolation Valves Exceeded SR 3.6.1.2b.Caused by Failure of Key Connecting Air Operator to Valve Shaft.Damaged Keys Replaced + (11:34:20, 13 December 2024)
- RBG-20241, Interim Deficiency Rept DR-274 Re Field Wiring to Asco & Target Rock Corp Solenoid Valves.Next Rept Anticipated by 850312 + (11:34:21, 13 December 2024)
- ML20099F708 + (11:34:22, 13 December 2024)
- ML20099F703 + (11:34:23, 13 December 2024)