Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101J173 + (09:44:11, 13 December 2024)
- ML20101J156 + (09:44:12, 13 December 2024)
- ML20101J163 + (09:44:12, 13 December 2024)
- ML20101J152 + (09:44:13, 13 December 2024)
- ML20101J144 + (09:44:14, 13 December 2024)
- ML20101J123 + (09:44:20, 13 December 2024)
- ML20101J109 + (09:44:25, 13 December 2024)
- 05000361/LER-1996-001-02, :on 960205,waste Gas Sys H Monitor Was Declared Inoperable.Caused by Blown Fuse.Replaced Blown Fused & Performed Channel Calibr + (09:44:33, 13 December 2024)
- ML20101J081 + (09:44:34, 13 December 2024)
- ML20101J076 + (09:44:35, 13 December 2024)
- ML20101J071 + (09:44:36, 13 December 2024)
- 05000354/LER-1995-042, :on 951212,fuel Bundle Was Confirmed to Be Misoriented During Operating Cycle.Caused by Less than Adequate Procedural & Human Factor Controls Being Established.Revised Procedures + (09:44:43, 13 December 2024)
- ML20101J066 + (09:44:44, 13 December 2024)
- 3F0396-14, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-21.Corrective Actions:Permanent Mods Have Been Installed That Added Isolation Relays Between RM-1A Non Safety Signal + (09:44:45, 13 December 2024)
- ML20101J051 + (09:44:46, 13 December 2024)
- ML20101J059 + (09:44:46, 13 December 2024)
- ML20101J046 + (09:44:47, 13 December 2024)
- ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled + (09:44:48, 13 December 2024)
- ML20101J038 + (09:44:48, 13 December 2024)
- NRC-96-0036, Forwards Relief Request VR-61 for IST Program for Pumps & Valves to Implement Test Frequencies Consistent w/10CFR50, App J,Option B + (09:44:49, 13 December 2024)
- 05000336/LER-1996-011-01, :on 960222,required Time to Enter Mode 5 Exceeded.Caused by Effective Action Not Being Initiated to Revise SDC & Cooldown Rate Monitoring Procedures.Operating & Surveillance Procedures Will Be Revised + (09:44:56, 13 December 2024)
- ML20101J014 + (09:44:57, 13 December 2024)
- 05000336/LER-1996-010, :on 960222,identified That Containment Hydrogen Monitor Flow Could Not Be Established W/Containment at Atmospheric Pressure Due to Improper Setting of Sys Pressure Regulators.Sys Calib Procedure Will Be Revised + (09:45:03, 13 December 2024)
- 05000336/LER-1996-008, :on 960222,concluded That Condition of Wire Mesh Screen Encl Over Two Containment Recirculation Suction Pipes Outside Design Basis.Caused by Const/Installation Error.Screen Encl Being Replaced + (09:45:10, 13 December 2024)
- ULNRC-03352, Responds to NRC 960307 RAI Re Temp of SFP After Full Core Offload Assuming Both Trains of Sfpc Area in Operation,In Ref to 950906 Request for Rev to TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re SFP Storage + (09:45:11, 13 December 2024)
- ML20101H996 + (09:45:12, 13 December 2024)
- B15604, Submits Changes to & Errors in ECCS Evaluation Model/ Applications of Model for Unit 2 + (09:45:13, 13 December 2024)
- NSD-NRC-96-4673, Forwards Response to NRC RAI 440.515 (Rev 1) Re Notrump Computer Code + (09:45:13, 13 December 2024)
- ML20101H983 + (09:45:14, 13 December 2024)
- ML20101H971 + (09:45:15, 13 December 2024)
- ML20101H977 + (09:45:15, 13 December 2024)
- PY-CEI-NRR-1515, Provides Update to Info Previously Submitted in Response to GL 88-01 Re Addition to & Reclassification of Welds & Identifying Changes in Examination Schedules.Summary of Changes to Table 2 Re Weld Insp Schedules Encl + (09:45:16, 13 December 2024)
- ML20101H960 + (09:45:17, 13 December 2024)
- ML20101H955 + (09:45:23, 13 December 2024)
- ML20101H945 + (09:45:29, 13 December 2024)
- ML20101H931 + (09:45:29, 13 December 2024)
- ML20101H930 + (09:45:30, 13 December 2024)
- ML20101H929 + (09:45:31, 13 December 2024)
- ST-HL-AE-5321, Forwards Revised STP Electric Generating Station Operations QA Plan, Incorporating Methodology for Implementation of STP Graded QA Program.Draft Procedures Also Encl + (09:45:32, 13 December 2024)
- L-84-149, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-11 & 50-251/84-11.Corrective Actions:Personnel Counseled Re Valve Clearance Procedure & Initial Air Aerosol Mixing Uniformity Test Procedures Developed + (09:45:38, 13 December 2024)
- ML20101H905 + (09:45:38, 13 December 2024)
- ML20101H895 + (09:45:44, 13 December 2024)
- ML20101H893 + (09:45:50, 13 December 2024)
- ST-HL-AE-5323, Forwards ANI to Maelu Policy 96-201,NEIL-III Policy UX95-075 & NEIL-III Policy UX95-075,per 10CFR50.54(w)(2) + (09:45:51, 13 December 2024)
- ML20101H872 + (09:46:00, 13 December 2024)
- ML20101H867 + (09:46:00, 13 December 2024)
- ML20101H852 + (09:46:01, 13 December 2024)
- 05000249/LER-1984-022-04, :on 840317,reactor Scrammed While Adjusting Mode Switch in Attempt to Clear Rod Block.Caused by Operator Error When Mode Switch Inadvertently Moved to Shutdown Position.Operator Counseled + (09:46:08, 13 December 2024)
- ML20101H830 + (09:46:09, 13 December 2024)
- ELV-03648, Forwards Response to Rev 1 to Generic Ltr 92-01 Re Reactor Vessel Structural Integrity.Heat Number of Each Beltline Plate Located on C-E Matl Certification Repts Maintained by Westinghouse + (09:46:10, 13 December 2024)
- 05000249/LER-1984-021-04, :on 840307,reactor Scrammed During Surveillance Testing.Caused by Bad Jumper Wire.Jumper Discarded & Personnel Reinstructed on Using Jumper Wire Const for Surveillance Test + (09:46:16, 13 December 2024)
- ML20101H820 + (09:46:18, 13 December 2024)