Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20108A509 + (06:39:06, 13 December 2024)
- ML20108A514 + (06:39:06, 13 December 2024)
- 05000315/LER-1985-004, :on 850129,w/reactor in Mode 1,high Alarm Received on Lower Containment Radiation Monitor That Resulted in Containment Isolation.Caused by Upward Trend in Containment Airborne Activity + (06:39:08, 13 December 2024)
- FVY-84-130, Application for Amend to License DPR-28,revising Tech Specs to Update Primary Containment Bases to Incorporate Results of plant-unique Analysis Rept for Mark I Containment long-term Program.Fee Paid + (06:39:09, 13 December 2024)
- ML20108A501 + (06:39:10, 13 December 2024)
- ML20108A492 + (06:39:11, 13 December 2024)
- 0CAN118403, Forwards Revised Integrated Implementation Plan in Response to Suppl 1 to NUREG-0737 (Generic Ltr 82-33).Control Room Design Review & Reg Guide 1.97 Programs Discussed + (06:39:12, 13 December 2024)
- AECM-84-0485, Clarifies Statement in That Provided Confirmation of Completion of Commitments Re Tdi Diesel Generators.Statement Reaffirmed That Fuel Oil Line Insp Incorporated Into Augmented Maint/Surveillance Program + (06:39:12, 13 December 2024)
- ML20108A481 + (06:39:13, 13 December 2024)
- 05000327/LER-1985-010, :on 850201,containment Ventilation Isolation Occurred on Train B Valves to Upper & Lower Containment Radiation Monitors RM-90-106 & 112.Caused by Failure of Power Supply.Power Supply Replaced + (06:39:15, 13 December 2024)
- ML20108A477 + (06:39:16, 13 December 2024)
- ML20108A476 + (06:39:17, 13 December 2024)
- 05000327/LER-1985-007, :on 850131,while Performing Surveillance Instruction 166.21,Train B Emergency Gas Treatment Sys Room Cooler Would Not Start.Caused by Blown Control Fuse.Fuse Replaced + (06:39:18, 13 December 2024)
- ML20108A455 + (06:39:20, 13 December 2024)
- ML20108A461 + (06:39:20, 13 December 2024)
- 05000416/LER-1985-005, :on 850129,portion of Intermediate Range Monitor Surveillance Not Performed within Required Limit Following Reactor Scram.Caused by Personnel Error. Surveillance Performed + (06:39:22, 13 December 2024)
- ML20108A444 + (06:39:23, 13 December 2024)
- 05000263/LER-1985-004-01, :on 850201,during Quarterly Valve Exercising, Flow Established Through RHR Intertia Line While Reactor in Run Mode.Caused by Improper Procedure.Procedure Revised + (06:39:24, 13 December 2024)
- 05000528/LER-1985-005, :on 850122,containment Purge Isolation & Fuel Bldg Essential Filtration Actuation Signals Actuated Simultaneously.Caused by Spurious Equipment Failure Alarm on Associated Radiation Monitoring Units + (06:39:26, 13 December 2024)
- 05000528/LER-1985-004, :on 850120,containment Purge Isolation & Control Room Essential Filtration Actuation Signals Automatically Actuated.Caused by Spurious Auxiliary Equipment Failure Alarm + (06:39:34, 13 December 2024)
- JPN-96-018, Forwards Response to NRC 960418 RAI Re Proposed T Change Request (JPTS-95-007) ,proposing to Revise Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs + (06:39:35, 13 December 2024)
- 05000324/LER-1984-011-01, :on 840924,automatic Trip of Channels a & B W/Primary Containment Isolation Sys Occurred Due to Reactor Low Water Level.Caused by Misoperation of RHR Sys.Operator Involved Counseled & Disciplined + (06:39:37, 13 December 2024)
- 3F0496-34, Confirms Notification Made Via ENS on 960419 Retracting Notification Made on 960322 for Reportable Event 30152 Re Suspected Design Basis Issue Involving Charcoal Filtration Efficiency & Air in-leakage (Dose) for CREVS + (06:39:38, 13 December 2024)
- ML20108A391 + (06:39:40, 13 December 2024)
- ML20108A387 + (06:39:40, 13 December 2024)
- ML20108A386 + (06:39:41, 13 December 2024)
- ML20108A380 + (06:39:42, 13 December 2024)
- PY-CEI-NRR-2046, Withdraws 930618 LAR Involving Rev to TS Figure 5.1.1-1 & Various Refs to Figure Throughout Current Ts,Due to Anticipated Implementation of Amend 69 (Improved TS) Changes When Implemented Will Obviate Need to Process Subj LAR + (06:39:42, 13 December 2024)
- RBG-19290, Interim Deficiency Rept DR-223 Re Installation of Mechanical Snubbers Supplied by Pacific Scientific.Next Rept Will Be Submitted by 841211 + (06:39:43, 13 December 2024)
- ML20108A367 + (06:39:46, 13 December 2024)
- ML20108A365 + (06:39:47, 13 December 2024)
- W3P84-2963, Final Rept,Rev 1,on Significant Const Deficiency 84 Re Tube Track Welding.Reevaluation Performed by Ebasco Engineering to Establish Max Stress Levels Expected to Exist at Tube Track Welded Connections + (06:39:48, 13 December 2024)
- ML20108A354 + (06:39:48, 13 December 2024)
- ML20108A348 + (06:39:50, 13 December 2024)
- ML20108A338 + (06:39:51, 13 December 2024)
- ML20108A334 + (06:39:53, 13 December 2024)
- ML20108A330 + (06:39:54, 13 December 2024)
- ML20108A328 + (06:39:55, 13 December 2024)
- W3P84-2976, Interim Rept of Potentially Reportable Deficiency 179 Re Welding Program.Review & Evaluation of Welds Ongoing.Next Rept Will Be Submitted by 841130 + (06:39:56, 13 December 2024)
- ML20108A314 + (06:39:57, 13 December 2024)
- 05000354/LER-1996-012, :on 960320,missed Offgas Sample Resulting in Condition Prohibited by Ts.Caused by Defective Needle Luer Lock Adapter.Needle Luer Lock Adapter on Backup Sample Apparatus Replaced + (06:39:58, 13 December 2024)
- ML20108A307 + (06:39:59, 13 December 2024)
- W3P84-2961, Final Rept of Significant Const Deficiency 78 Re American Bridge Structural Steel.Reinsp of Connections in Steam Generator Framing Performed Scope of American Bridge Work Reviewed & Review of Existing Documentation Performed + (06:40:00, 13 December 2024)
- JPN-96-019, Informs of Extension of Second 10-yr ISI & IST Intervals by Period of Nine Months.Extension Being Applied to Third Period of Second Interval Currently Scheduled to End Sept 1996.Addl Nine Months Extends Interval Through June 1997 + (06:40:01, 13 December 2024)
- ML20108A298 + (06:40:01, 13 December 2024)
- ML20108A288 + (06:40:02, 13 December 2024)
- W3P84-2965, Interim Rept of Significant Const Deficiency 93 Re Charging & Letdown Containment Isolation Valves.Valve Replaced W/New Seats.Further Testing Recommended to Verify Proper Valve Operation.Next Rept Will Be Submitted by Dec 1984 + (06:40:03, 13 December 2024)
- RBG-19292, Interim Deficiency Rept DR-185 Re Placement of Two Isolation Valves Outside Containment for RCIC Turbine Exhaust Line Vacuum Breaker Sys.Interim or Final Status Rept Will Be Provided by 850116 + (06:40:03, 13 December 2024)
- W3P84-2964, Final Rept of Significant Const Deficiency 90 Re Overstressed Electrical Conduit.Revised Design Criteria Based on Analysis Issued.Items Remaining in Balance of Plant Will Be Completed by 841103 + (06:40:04, 13 December 2024)
- ML20108A269 + (06:40:06, 13 December 2024)
- ML20108A258 + (06:40:07, 13 December 2024)
- ML20108A257 + (06:40:07, 13 December 2024)