Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112C747 + (06:05:36, 13 December 2024)
- 05000271/LER-1996-013, :on 960424,identified Two Fire Suppression Sys That Do Not Meet Design Requirements Due to Personnel Error. Two Fire Suppression Sys Will Be Modified + (06:05:40, 13 December 2024)
- ML20112C741 + (06:05:42, 13 December 2024)
- L-06-221, Rev 0 to in Situ Operational Testing of HPCS Svc Water Pump for Grand Gulf Nuclear Power Station + (06:05:46, 13 December 2024)
- ML20112C733 + (06:05:52, 13 December 2024)
- ML20112C732 + (06:05:53, 13 December 2024)
- 05000317/LER-1996-003, :on 960423,discovered Holes in Containment Sump Screen Larger than Described in Ufsar.Holes Most Likely Installed During Plant Const.Sump Screens Visually Inspected & Repaired + (06:05:55, 13 December 2024)
- 2CAN059602, Forwards Amend 13 to ANO Unit 2 (ANO-2) Sar.Summary of 10CFR50.59 Evaluations Associated W/Amend 13 of ANO-2 SAR Will Be Provided Under Separate Cover Ltr within 30 Days as Part of ANO-2 10CFR50.59 Rept + (06:05:56, 13 December 2024)
- AECM-85-0091, Forwards Test Rept MPL-06-221, in Situ Operational Testing of HPCS Svc Water Pump for Grand Gulf Nuclear Power Station, Per 850306 Telcon Request + (06:05:57, 13 December 2024)
- ML20112C720 + (06:05:58, 13 December 2024)
- 05000346/LER-1984-019, :on 841108,blank Flange Found on Outlet of Component Cooling Water Surge Tank Relief Valve CC3602.On 841130,util Determined Tank Not Protected Against Overpressurization W/Blank Flange + (06:06:02, 13 December 2024)
- 05000412/LER-1996-002-01, :on 960220,containment Penetration Not Isolated within Time Limit.Caused by Breakdown in Administrative Controls Governing Document Updates During Initial Plant Const in 1985.Manual Isolation Valves Shut + (06:06:04, 13 December 2024)
- 05000293/LER-1985-003, :on 850210,reactor Shut Down.Caused by Oil Leak in Recirculation Pump Which Resulted in Bearing Damage.Oil Leak Repaired & Damaged Components Replaced + (06:06:09, 13 December 2024)
- ML20112C648 + (06:06:10, 13 December 2024)
- ML20112C649 + (06:06:10, 13 December 2024)
- ML20112C647 + (06:06:11, 13 December 2024)
- 2CAN018501, Forwards Arkansas Nuclear One-Unit 2 Gap Insp Plan for Fourth Refueling Outage, Per .Preliminary Results of Exam Will Be Verbally Relayed Prior to Replacing Reactor Vessel Head + (06:06:12, 13 December 2024)
- ML20112C632 + (06:06:12, 13 December 2024)
- ML20112C622 + (06:06:13, 13 December 2024)
- ML20112C612 + (06:06:14, 13 December 2024)
- ML20112C613 + (06:06:14, 13 December 2024)
- ML20112C603 + (06:06:15, 13 December 2024)
- ML20112C587 + (06:06:16, 13 December 2024)
- ML20112C594 + (06:06:16, 13 December 2024)
- ML20112C584 + (06:06:17, 13 December 2024)
- ML20112C575 + (06:06:21, 13 December 2024)
- ML20112C563 + (06:06:24, 13 December 2024)
- ML20112C560 + (06:06:28, 13 December 2024)
- ML20112C554 + (06:06:28, 13 December 2024)
- ML20112C552 + (06:06:30, 13 December 2024)
- ML20112C548 + (06:06:31, 13 December 2024)
- ML20112C549 + (06:06:31, 13 December 2024)
- ML20112C547 + (06:06:32, 13 December 2024)
- ML20112C537 + (06:06:33, 13 December 2024)
- ML20112C534 + (06:06:34, 13 December 2024)
- ML20112C531 + (06:06:34, 13 December 2024)
- ML20112C529 + (06:06:35, 13 December 2024)
- PLA-2403, Revises Expected Completion Date for Resolution of NUREG-0737,Item II.F.1 Until 851231 Due to Complexity of Problem + (06:06:36, 13 December 2024)
- ML20112C517 + (06:06:36, 13 December 2024)
- ML20112C489 + (06:06:37, 13 December 2024)
- 05000321/LER-1984-012, :on 841114,20 & 1206,reactor Protection Sys Logic Actuation Occurred for No Apparent Reason.Caused by Blown Fuse & Lifted Wire.Fuse in Panel 1H11-P610 & Wire Replaced + (06:06:39, 13 December 2024)
- ML20112C482 + (06:06:40, 13 December 2024)
- ML20112C473 + (06:06:44, 13 December 2024)
- 05000413/LER-1984-029-02, :on 841206,Westinghouse Notified Util of Insp Results Re CRD Mechanism Design.During 841215 Insp of All Unit 1 Drive rods,14 Unacceptable Drive Rods Found.Rods Replaced & Returned to Westinghouse + (06:06:45, 13 December 2024)
- 05000237/LER-1984-019-06, :on 841206,w/unit in Refuel & Inservice Insp in Progress,Welds Located in Reactor Water Cleanup Sys Identified as Having Rejectable Indications.Repairs Will Be Made by Weld Overlay &/Or Pipe Replacement + (06:06:47, 13 December 2024)
- ML20112C439 + (06:06:48, 13 December 2024)
- 05000237/LER-1984-024-05, :on 841207,secondary Containment Momentarily Broken When Turbine Bldg Interlock Door Opened Before Reactor Bldg Interlock Door Fully Closed.Caused by Personnel Exiting Reactor Bldg.Door Functioning Properly + (06:06:50, 13 December 2024)
- ML20112C430 + (06:06:52, 13 December 2024)
- ML20112C425 + (06:06:52, 13 December 2024)
- ML20112C409 + (06:06:54, 13 December 2024)
- ML20112C407 + (06:06:55, 13 December 2024)