List of results
- ST-HL-AE-5408, Forwards Results for Hot,Full Flow Rod Drop Testing in Unit 1 for Cycle 6,performed on 960518 & Hot Full Flow Rod Drop Testing of New Cycle 7 Core,Performed on 960608,per NRC Bulletin 96-001 + (04:32:21, 13 December 2024)
- ML20115B010 + (04:32:22, 13 December 2024)
- ML20115B009 + (04:32:23, 13 December 2024)
- ST-HL-AE-4228, Responds to Violations Noted in Insp Repts 50-498/92-24 & 50-499/92-24.Corrective Actions:Design Change to Install Isolation/Equalization Valves to Facilitate Calibr & Restoration of Chiller Switches Will Be Completed by 921231 + (04:32:24, 13 December 2024)
- ML20115B007 + (04:32:25, 13 December 2024)
- ML20115B005 + (04:32:25, 13 December 2024)
- ML20115B002 + (04:32:27, 13 December 2024)
- ML20115B001 + (04:32:27, 13 December 2024)
- ML20115B000 + (04:32:28, 13 December 2024)
- ML20115A996 + (04:32:28, 13 December 2024)
- ML20115A988 + (04:32:29, 13 December 2024)
- ML20115A986 + (04:32:30, 13 December 2024)
- 1CAN079603, Requests Relief from Section IWA-5213 of ASME Section XI IST Requirements Because 10 Minute Hold Time Could Not Be Reasonably Obtained on Certain Sections of Train a EFW W/O Undue Hardship & Expense + (04:32:32, 13 December 2024)
- ML20115A978 + (04:32:32, 13 December 2024)
- ML20115A971 + (04:32:33, 13 December 2024)
- 1CAN079601, Requests Relief from Requirements of ASME B&PV Code,Sections III & XI Due to Flaws in SW Piping,Iaw 10CFR50.55a & Guidance Provided in GL 90-05 & GL 91-18 + (04:32:34, 13 December 2024)
- ML20115A967 + (04:32:35, 13 December 2024)
- ML20115A960 + (04:32:36, 13 December 2024)
- ML20115A952 + (04:32:36, 13 December 2024)
- ML20115A951 + (04:32:37, 13 December 2024)
- ML20115A949 + (04:32:38, 13 December 2024)
- ML20115A946 + (04:32:39, 13 December 2024)
- ML20115A944 + (04:32:40, 13 December 2024)
- ML20115A945 + (04:32:40, 13 December 2024)
- ML20115A942 + (04:32:41, 13 December 2024)
- ML20115A941 + (04:32:42, 13 December 2024)
- BECO-LTR-92-117, Monthly Operating Rept for Sept 1992 for Pilgrim Nuclear Power Station + (04:32:43, 13 December 2024)
- RBG-43059, Submits Response to NRC Request for Addl Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (04:32:43, 13 December 2024)
- ML20115A935 + (04:32:45, 13 December 2024)
- ML20115A933 + (04:32:46, 13 December 2024)
- BSEP-92-0024, Forwards Request for Temporary Waiver of Compliance from TS 3.3.3, ECCS Actuation Instrumentation When in Operational Condition 4, to Permit One Channel from Each of Two Trip Sys to Be Inoperable Simultaneously for Up to 12 H + (04:32:47, 13 December 2024)
- ML20115A925 + (04:32:47, 13 December 2024)
- ML20115A924 + (04:32:48, 13 December 2024)
- U-602592, Requests NRC Evaluation of Util Revised Response to GL 88-01, NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping, in Advance of Refueling outage-6 + (04:32:49, 13 December 2024)
- ML20115A920 + (04:32:50, 13 December 2024)
- ML20115A917 + (04:32:51, 13 December 2024)
- ML20115A916 + (04:32:52, 13 December 2024)
- ML20115A915 + (04:32:53, 13 December 2024)
- ML20115A914 + (04:32:54, 13 December 2024)
- ML20115A911 + (04:32:55, 13 December 2024)
- ML20115A909 + (04:32:57, 13 December 2024)
- ML20115A907 + (04:32:58, 13 December 2024)
- ML20115A905 + (04:33:00, 13 December 2024)
- ML20115A904 + (04:33:01, 13 December 2024)
- RC-96-0169, Submits Four Controlled Copies of Amend 38 to Physical Security Plan.W/O Encl + (04:33:02, 13 December 2024)
- ML20115A902 + (04:33:03, 13 December 2024)
- ML20115A901 + (04:33:04, 13 December 2024)
- ML20115A898 + (04:33:05, 13 December 2024)
- ML20115A893 + (04:33:07, 13 December 2024)
- ML20115A896 + (04:33:07, 13 December 2024)
- 05000333/LER-1992-043, :on 920904,identified Failure Mechanism in Which Redundant Control Circuits of ESW & SGT Could Be Lost. Caused by Sys Design Deficiency.Seismically Qualified Fuses Will Be Installed + (04:33:09, 13 December 2024)
- ML20115A890 + (04:33:16, 13 December 2024)