Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20118B599 + (02:17:45, 13 December 2024)
- NRC-92-0117, Forwards Rev 20 to Fermi 2 Physical Security Plan,Chapters 3 & 4.Rev Withheld + (02:17:45, 13 December 2024)
- ML20118B587 + (02:17:46, 13 December 2024)
- ML20118B596 + (02:17:46, 13 December 2024)
- ML20118B583 + (02:17:47, 13 December 2024)
- U-602049, Ro:On 920922,Control Room Received Notification That Employee Working in Radwaste Sort Tent Had Been Injured & Potentially Contaminated.Ambulance Called to Respond.Hosp Notified Util That Victim Was Not Contaminated + (02:17:48, 13 December 2024)
- ML20118B571 + (02:17:48, 13 December 2024)
- ML20118B554 + (02:17:50, 13 December 2024)
- ML20118B551 + (02:17:51, 13 December 2024)
- ML20118B550 + (02:17:52, 13 December 2024)
- 05000352/LER-1992-016, :on 920828,during Pressure Setpoint Testing of 14 Reactor Main Steam Sys Target Rock pilot-operated Valves, Only Two Valves Lifted within TS Limit.Caused by Corrosion Induced Bonding.Switch Options Reviewed + (02:17:54, 13 December 2024)
- 05000219/LER-1992-010, :on 920824,high Steam Flow Occurred During Warmup of Main Turbine That Resulted in Reactor Low Water Level Scram.Caused by Drift in Adjustment of Sv.Threads on Restoring Arm Will Be Repaired + (02:17:56, 13 December 2024)
- ML20118B545 + (02:17:57, 13 December 2024)
- ML20118B541 + (02:17:58, 13 December 2024)
- ML20118B543 + (02:17:58, 13 December 2024)
- ML20118B539 + (02:17:59, 13 December 2024)
- ML20118B537 + (02:17:59, 13 December 2024)
- ML20118B536 + (02:18:00, 13 December 2024)
- ML20118B529 + (02:18:01, 13 December 2024)
- ML20118B531 + (02:18:01, 13 December 2024)
- ML20118B527 + (02:18:02, 13 December 2024)
- ML20118B526 + (02:18:02, 13 December 2024)
- ML20118B524 + (02:18:03, 13 December 2024)
- ML20118B514 + (02:18:04, 13 December 2024)
- U-602045, Forwards Response to GL 92-04, Resolution of Issues Re Reactor Vessel Water Level in BWRs Per 10CFR50.54(f). Util Endorses BWR Owners Group Plan,Including Analysis & Testing Program + (02:18:05, 13 December 2024)
- 05000354/LER-1992-008-02, :on 920827,containment Penetration Test Isolation Valve Opened During Implementation of Troubleshooting Plan.Caused by Procedural Inadequacy. Troubleshooting Procedure to Be Modified + (02:18:07, 13 December 2024)
- ML20118B385 + (02:18:08, 13 December 2024)
- ML20118B439 + (02:18:08, 13 December 2024)
- 0CAN099211, Forwards Proposed Rev to Industrial Security Plan, Allowing Greater Flexibility to Determine Security Shift Staffing Requirements & Compensatory Measures,Based on Status of Security Program.Rev Withheld (Ref 10CFR73.21) + (02:18:09, 13 December 2024)
- ML20118B283 + (02:18:09, 13 December 2024)
- 05000285/LER-1992-016, Revises Commitment to AEC Safety Guide 1 (Reg Guide 1.1), Contained in Section 6.2 of Updated Sar.Commitment Covers Method of Calculating Available Net Positive Suction Head for Containment Spray Sys Per LER 92-016 + (02:18:10, 13 December 2024)
- 05000334/LER-1992-007-01, :on 920825,analog Rod Position Indication for Control Rod K-8 Intermittently Fluctuated.On 920826, Determined That Primary Voltage Readings Not Taken Every 4 H.Caused by Personnel Error.Event Reviewed + (02:18:12, 13 December 2024)
- ML20118B241 + (02:18:14, 13 December 2024)
- ML20118B238 + (02:18:15, 13 December 2024)
- ML20118B220 + (02:18:16, 13 December 2024)
- TXX-9240, Suppls 920331 Response to Unresolved Item Noted in Insp Repts 50-445/91-202 & 50-446/91-201.Corrective Actions: Automatic Transfer of Faulted Motor Control Ctrs Between Units Now Conforms to Reg Guide 1.81,Positions C2 & C3 + (02:18:16, 13 December 2024)
- ML20118B219 + (02:18:20, 13 December 2024)
- ML20118B214 + (02:18:21, 13 December 2024)
- 05000353/LER-1992-010-02, :on 920828,main Steam Safety Valves Setpoint Drifted Due to Corrosion Induced Bonding within Valves. Affected SRVs Removed for Setpoint Testing.Srv Setpoint Drift Pending Conclusion of Ongoing Testing + (02:18:23, 13 December 2024)
- ML20118B212 + (02:18:24, 13 December 2024)
- ML20118B205 + (02:18:25, 13 December 2024)
- ML20118B201 + (02:18:27, 13 December 2024)
- ML20118B196 + (02:18:28, 13 December 2024)
- ML20118B195 + (02:18:29, 13 December 2024)
- 05000423/LER-1992-020-01, :on 920824,Auxiliary Bldg Filter Sys Fans Tripped W/Vivs Set at 100%.Caused by Failure to Perform Adequate Technical & Safety Evaluation of Auxiliary Bldg Filter Sys.Event Will Be Reviewed W/Engineers + (02:18:33, 13 December 2024)
- 05000321/LER-1992-021, :on 920827,unit Scrammed & Group 1 Primary Containment Isolation Sys Valves Closed,Resulting in Initiation of Sgts,Hpci & RCIC Sys.Caused by Organic Instrusion.Filter Elements Replaced + (02:18:35, 13 December 2024)
- ML20118B173 + (02:18:37, 13 December 2024)
- ML20118B172 + (02:18:38, 13 December 2024)
- ML20118B170 + (02:18:39, 13 December 2024)
- 05000498/LER-1992-011, :on 920824,identified That RCP Undervoltage & Underfrequency Trip Not Tested Completely Per Ts.Cause Due to Writers Not Identifying Need to Verify Bsm Lights. Procedure for Field Changes Will Be Revised + (02:18:40, 13 December 2024)
- 05000321/LER-1992-022, :on 920827,Train a of Standby Gas Treatment Sys Received Automatic Initiation Signal But No Equipment Actuations Occurred.Cause Not Determined.Fission Product Monitoring Sys Returned to Svc + (02:18:43, 13 December 2024)
- ML20118B134 + (02:18:44, 13 December 2024)