Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134N574 + (08:23:48, 12 December 2024)
- 05000395/LER-1985-015, Notifies That Util Agrees W/Alleged Violation 01 in Insp Rept 50-395/85-28.Corrective Actions Documented in Encl LER 85-015,Rev 1.Supervisors Counseled Re Equipment Operability. Util in Full Compliance W/Corrective Action + (08:23:49, 12 December 2024)
- ML20134N571 + (08:23:49, 12 December 2024)
- 3F0885-21, Documents Commitment Re Emergency Diesel Generator Operability.Generator Field Overcurrent Protective Relay Circuit Will Be Modified to Allow Generator to Reconnect to Engineered Safeguards Bus After Overcurrent Trip + (08:23:50, 12 December 2024)
- ML20134N568 + (08:23:51, 12 December 2024)
- ML20134N569 + (08:23:51, 12 December 2024)
- ML20134N567 + (08:23:53, 12 December 2024)
- ML20134N566 + (08:23:54, 12 December 2024)
- ML20134N565 + (08:23:55, 12 December 2024)
- ML20134N563 + (08:23:58, 12 December 2024)
- 05000373/LER-1985-056-01, :on 850803,control Room Vent Radiation Monitor B Spurious High Trip Initiated Emergency Makeup Train A. Caused by Radio Interference.Radiation Monitor Trip Reset & Emergency Makeup Train Shut Down + (08:23:59, 12 December 2024)
- ML20134N560 + (08:24:00, 12 December 2024)
- ML20134N558 + (08:24:01, 12 December 2024)
- ML20134N555 + (08:24:02, 12 December 2024)
- ML20134N557 + (08:24:02, 12 December 2024)
- ML20134N554 + (08:24:03, 12 December 2024)
- 05000397/LER-1985-052, :on 850801,discovered Procedure Deviation Issued on 850608 Incorrectly Changed Containment Isolation Valve Closure Time.Procedure Mod Issued + (08:24:05, 12 December 2024)
- ML20134N551 + (08:24:06, 12 December 2024)
- ML20134N550 + (08:24:06, 12 December 2024)
- 05000237/LER-1985-032-03, :on 850802,Group 1 Isolation Automatically Initiated & Scram Resulted.Caused by Steam Line Pressure Drop Below 850 Psig & Mode Switch Contacts in Run Position. Switch Contact Test Procedures Modified + (08:24:08, 12 December 2024)
- ML20134N548 + (08:24:09, 12 December 2024)
- ML20134N545 + (08:24:10, 12 December 2024)
- ML20134N547 + (08:24:10, 12 December 2024)
- ML20134N544 + (08:24:11, 12 December 2024)
- ML20134N543 + (08:24:11, 12 December 2024)
- ML20134N542 + (08:24:12, 12 December 2024)
- ML20134N539 + (08:24:13, 12 December 2024)
- ML20134N537 + (08:24:14, 12 December 2024)
- ML20134N538 + (08:24:14, 12 December 2024)
- ML20134N536 + (08:24:15, 12 December 2024)
- ML20134N535 + (08:24:15, 12 December 2024)
- ML20134N532 + (08:24:16, 12 December 2024)
- ML20134N530 + (08:24:17, 12 December 2024)
- ML20134N531 + (08:24:17, 12 December 2024)
- ML20134N528 + (08:24:18, 12 December 2024)
- ML20134N529 + (08:24:18, 12 December 2024)
- ML20134N527 + (08:24:20, 12 December 2024)
- ML20134N526 + (08:24:20, 12 December 2024)
- ML20134N525 + (08:24:21, 12 December 2024)
- ML20134N521 + (08:24:22, 12 December 2024)
- ML20134N524 + (08:24:22, 12 December 2024)
- ML20134N519 + (08:24:23, 12 December 2024)
- ML20134N515 + (08:24:24, 12 December 2024)
- ML20134N518 + (08:24:24, 12 December 2024)
- LIC-96-0177, Responds to Violations Noted in Insp Rept 50-285/96-10. Corrective Actions:Conducted Meeting W/Personnel to Clarify Expectations for Conduct,Performed Walkdown of Contractor Work Locations & Required Maint Planners to re-read SO-G-91 + (08:24:25, 12 December 2024)
- ML20134N512 + (08:24:26, 12 December 2024)
- ML20134N510 + (08:24:26, 12 December 2024)
- ML20134N507 + (08:24:27, 12 December 2024)
- ML20134N508 + (08:24:27, 12 December 2024)
- ML20134N506 + (08:24:28, 12 December 2024)
- ML20134N504 + (08:24:29, 12 December 2024)