Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20136G909 + (05:45:09, 12 December 2024)
- ML20136G908 + (05:45:09, 12 December 2024)
- ML20136G907 + (05:45:10, 12 December 2024)
- ML20136G905 + (05:45:11, 12 December 2024)
- ML20136G906 + (05:45:11, 12 December 2024)
- 05000413/LER-1985-069, :on 851128,w/diesel Generator 1A Inoperable, Availability of Offsite Power Sources Not Verified.Caused by Personnel Error.Availability Verified Per PT/1/A/4350/02C & Incident Discussed W/Personnel + (05:45:13, 12 December 2024)
- ML20136G902 + (05:45:14, 12 December 2024)
- IR 05000313/1984034 + (05:45:15, 12 December 2024)
- ML20136G897 + (05:45:18, 12 December 2024)
- 05000499/LER-1997-002, Forwards LER 97-002-00,for Hlp Re All Four Steam Generators Being Classified Category C-3 + (05:45:19, 12 December 2024)
- ML20136G894 + (05:45:20, 12 December 2024)
- ML20136G892 + (05:45:20, 12 December 2024)
- ML20136G891 + (05:45:21, 12 December 2024)
- PY-CEI-NRR-2145, Jan-Dec 1996 Annual Rept + (05:45:22, 12 December 2024)
- ML20136G887 + (05:45:23, 12 December 2024)
- U-602717, Submits Info Re Property Damage Insurance Coverage for Clinton Power Station + (05:45:24, 12 December 2024)
- ML20136G884 + (05:45:25, 12 December 2024)
- ML20136G883 + (05:45:26, 12 December 2024)
- ML20136G882 + (05:45:26, 12 December 2024)
- 05000323/LER-1985-021-01, :on 851204,spurious Safety Injection Occurred. Caused by Safety Injection Signal Received on Train a of Solid State Protection Sys While Preparing to Investigate 851202 Event.No Corrective Action Required + (05:45:28, 12 December 2024)
- ML20136G879 + (05:45:29, 12 December 2024)
- ML20136G878 + (05:45:30, 12 December 2024)
- ML20136G872 + (05:45:31, 12 December 2024)
- ML20136G875 + (05:45:31, 12 December 2024)
- ML20136G870 + (05:45:32, 12 December 2024)
- 05000416/LER-1985-046, :on 851204,surveillance Procedure Deficiency Found Involving Logic Sys Functional Test of Three RHR Sys Isolation Valves.Caused by Oversight in Incorporating All Aspects of Procedure.Procedure Revised + (05:45:34, 12 December 2024)
- ML20136G863 + (05:45:35, 12 December 2024)
- 05000315/LER-1985-067, :on 851204,during Cold Shutdown,Seven Ice Condenser Lower Inlet Doors Failed Initial Opening Torque Surveillance Test & Declared Inoperable.Caused by Frost Buildup.Doors Will Be Evaluated Before Startup + (05:45:37, 12 December 2024)
- ML20136G861 + (05:45:38, 12 December 2024)
- ML20136G860 + (05:45:38, 12 December 2024)
- NRC-97-0022, Responds to NRC Re Violations Noted in Insp Rept 50-341/96-13.Corrective Actions:Nso Placed Scram Discharge Vol High Level Bypass Switch in Bypass Position + (05:45:39, 12 December 2024)
- ML20136G855 + (05:45:40, 12 December 2024)
- ML20136G853 + (05:45:40, 12 December 2024)
- 05000440/LER-1997-002, :on 970211,breaker Trip Caused Loss of Electrical Power to Non-Class 1E Bus & Resulted in ESF Actuation.Caused by Random Component Failure.Ground Fault Replaced + (05:45:42, 12 December 2024)
- ML20136G849 + (05:45:44, 12 December 2024)
- 05000298/LER-1985-020, :on 850810,surveillance Testing on Automatic Depressurization Sys Improperly Conducted.Caused by Personnel Error & Lack of Procedures Re Design Change 84-01. Procedures Revised & Personnel Counseled + (05:45:46, 12 December 2024)
- 05000361/LER-1985-047, :on 851011,toxic Gas Isolation Sys Train a Actuated Due to Spurious Electrical Signal from Ammonia Analyzer Channel.Cause Undetermined.Train a Analyzer Checked for Proper Calibr & Returned to Svc + (05:45:48, 12 December 2024)
- ML20136G846 + (05:45:49, 12 December 2024)
- 05000298/LER-1985-021, :on 850723,during Transfer of Fuel Assembly to Spent Fuel Storage Rack,Refueling Bridge Fuel Grapple Improperly Engaged.Caused by Lack of Procedure for Visual Confirmation of Engagement.Procedure Revised + (05:45:51, 12 December 2024)
- ML20136G843 + (05:45:52, 12 December 2024)
- ML20136G842 + (05:45:53, 12 December 2024)
- 05000458/LER-1985-051, :on 851203,RWCU Sys Isolated When Riley Temp Module Read During Surveillance Testing.Caused by Design Problem W/Temp Switches.All Riley Temp Modules Will Be Modified by 860228 + (05:45:54, 12 December 2024)
- 05000370/LER-1985-023-02, :on 851014,monthly Source Check Surveillance on All Radiation Monitoring Devices Performed on 850515 Classified as Missed Due to Loss of Supporting Documentation.Caused by Personnel Error + (05:45:56, 12 December 2024)
- ML20136G838 + (05:45:57, 12 December 2024)
- ML20136G837 + (05:45:58, 12 December 2024)
- ML20136G835 + (05:45:58, 12 December 2024)
- ML20136G834 + (05:45:59, 12 December 2024)
- 05000255/LER-1985-027, :on 851205,engineering Analysis Revealed That Terminal Block PT-0102D Would Pass Unacceptable Leakage Current During LOCA or Main Steam Line Break.Cause Unstated. Terminal Block Replaced + (05:46:00, 12 December 2024)
- ML20136G832 + (05:46:01, 12 December 2024)
- ML20136G829 + (05:46:02, 12 December 2024)
- ML20136G827 + (05:46:03, 12 December 2024)