_.
Docket No. 50-213 DISTRIBUTION TcketJ11e' SSPB Rdg(File NRC PDR PNoonan 2)
DCS JGibson NSIC Mr. John F. Opeka, Senior Vice President HBerkow CThomas Nuclear Engineering and Operations JJoyner, Reg. I Connecticut Yankee Atomic Power Company BKushner, Reg. I Post Office Box 270 CJamerson, ORB #5 Hartford, Connecticut 06141-0270 FAkstulewicz, ORB #5 JZwolinski, ORB #5
Dear Mr. Opeka:
OR8#5 Rdg File
SUBJECT:
REVISION 11 TO HADDAM NECK PHYSICAL SECURITY PLAN This is in response to your January 25, 1985 10 CFR 50.54(p) change (Revision
- 11) to the Haddam Neck Physical Security Plan.
Review responsibility for portions of that submittal were transferred to Headquarters by memorandum from Region I on May 30, 1985.
We have determined that the inclusion of corporate personnel as " regular site employees" is an acceptable 10 CFR 50.54(p) change. However, the proposed screening program (stated in paragraph 3.3.1.2) to be applied to these individuals does not meet industry or current staff guidance and therefore is not acceptable. Accordingly, you should resubmit appropriate plan changes and in the meantime continue to implement your approved physical security plan.
We have also determined that the other changes on pages 3-4, 6-7, and 6-9 fall within the provisions of 10 CFR 50.54(p) because of their administrative nature and are therefore acceptable.
The enclosure to your letter contains Safeguards Information of a type specified in 10 CFR 73.21 and is being withheld from public disclosure.
Sincerely,
The reporthg and/or recordice69 i
- raquuer en t ccMrc:! m this etter q
a!!ect reur than tan respomhnts:
g
)p therefere, cMa cisaran:e is not
(
ohn A. Zwol11 ski, Chief requued under P. L M411.,
N Operating Reactors Branch #5 Division of Licensing cc: See next page ORB #5:D h DL/S$pB DL; PB, S
ORB #5:DL SSP Jhbspp H8'e 6w CJamerso,
FAkstulewicz PN an:mn
/
85 11/4/85 11/ (/85 11/f/85 11/3/85 11/rz,/85 k
11
/85 V
B511220471 851118 PDR ADOCK 05000213 F
'o,j UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
t a
wAsHWGTON, D. C. 20555 November 18, 1985 Docket No. 50-213 Mr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company l
Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
I
SUBJECT:
REVISION 11 TO HADDAM NECK PHYSICAL SECURITY PLAN i
i
. This is in response to your January 25, 1985 10 CFR 50.54(p) change (Revision i y%: ~
- 11) to the Haddam Neck Physical Security _ Plan.
Review responsibility. for.
[
portions of that submittal were transferred to Headquarters by memorandum from Region I on.May 30, 1985.
We have deterinined that the inclusion of corporate personnel as " regular site employees" is an acceptable 10 CFR 50.54(p) change.
However, the proposed screening program (stated in paragraph 3.3.1.2) to be applied to these individuals does not meet industry or current staff guidance and therefore is not acceptable. Accordingly, you should resubmit appropriate plan changes and in the meantime continue to implement your approved physical security plan.
We have also determined that the other changes on pages 3-4, 6-7, and 6-9 fall within the provisions of 10 CFR 50.54(p) because of their administrative nature and are therefore acceptable.
.The enclosure to your letter contains Safeguards Information of a type specified in 10 CFR 73.21 and is being withheld from public disclosure.
I Sincerely,
,,g poquirements contained la this stist
} h, 4
gifggtigerer than les respeemets:
gerstere, OMB clearance is em 4
884 sired unde P. L 96 51L
John A. Twolinski, C efl Operating Reactors Branch #5 Division of Licensing cc: See next page
4 Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmenta1
~
City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant
- RDF #1 Post Office Box 127E East Hampton, Connecticut 06424 Edward J. Mroczka Vice President, Nuclear Operations
(_
Northeast Utilities Service Company
- Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 l