Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20137B979 + (05:13:31, 12 December 2024)
- ML20137B980 + (05:13:31, 12 December 2024)
- ML20137B978 + (05:13:32, 12 December 2024)
- ML20137B976 + (05:13:33, 12 December 2024)
- ML20137B974 + (05:13:33, 12 December 2024)
- ML20137B972 + (05:13:34, 12 December 2024)
- ML20137B969 + (05:13:35, 12 December 2024)
- ML20137B971 + (05:13:35, 12 December 2024)
- IR 05000413/1985049 + (05:14:26, 12 December 2024)
- ML20137B961 + (05:14:27, 12 December 2024)
- ML20137B963 + (05:14:27, 12 December 2024)
- HL-5325, Provides 180-day Response to GL 96-05, Periodic Verification of Design Basis Capability of SR Movs + (05:14:28, 12 December 2024)
- ML20137B957 + (05:14:29, 12 December 2024)
- ML20137B955 + (05:14:33, 12 December 2024)
- ML20137B953 + (05:14:34, 12 December 2024)
- ML20137B950 + (05:14:34, 12 December 2024)
- ML20137B948 + (05:14:35, 12 December 2024)
- ML20137B949 + (05:14:35, 12 December 2024)
- ST-HL-AE-5550, Application for Amends to Licenses NPF-76 & NPF-80,amending Tech Specs 3/4.4.5 & 3.4.6.2 to Allow Installation of Laser Welded Tube Sleeves as Alternative to Plugging Defective SG Tubes + (05:14:36, 12 December 2024)
- ML20137B941 + (05:14:40, 12 December 2024)
- ML20137B944 + (05:14:40, 12 December 2024)
- ML20137B938 + (05:14:42, 12 December 2024)
- ML20137B939 + (05:14:42, 12 December 2024)
- ML20137B937 + (05:14:43, 12 December 2024)
- ML20137B933 + (05:14:43, 12 December 2024)
- ML20137B931 + (05:14:44, 12 December 2024)
- NG-97-0453, Monthly Operating Rept for Feb 1997 for Duane Arnold Energy Center + (05:14:45, 12 December 2024)
- IR 05000105/2005004 + (05:14:46, 12 December 2024)
- ML20137B925 + (05:14:46, 12 December 2024)
- ML20137B922 + (05:14:47, 12 December 2024)
- ML20137B920 + (05:14:48, 12 December 2024)
- ML20137B914 + (05:14:49, 12 December 2024)
- ML20137B918 + (05:14:49, 12 December 2024)
- ML20137B913 + (05:14:50, 12 December 2024)
- ML20137B907 + (05:14:51, 12 December 2024)
- ML20137B909 + (05:14:51, 12 December 2024)
- ML20137B904 + (05:14:52, 12 December 2024)
- ML20137B899 + (05:14:53, 12 December 2024)
- ML20137B898 + (05:14:53, 12 December 2024)
- LD-85-039, Informs That Vendor Will Add Interface to CESSAR App B Item III.A.1.2 (Upgrade Emergency Support Facilities) to Facilitate Closeout of SPDS Issue.Requirement Will Be Added to CESSAR in Amend 10 or 11 + (05:14:54, 12 December 2024)
- ML20137B897 + (05:14:54, 12 December 2024)
- ML20137B894 + (05:14:55, 12 December 2024)
- ML20137B893 + (05:14:56, 12 December 2024)
- 05000361/LER-1997-003, :on 970225,out of Tolerance Condition Identified During Testing of Pressurizer Safety Valve Setpoints.Caused by Setpoints Drift.Setpoints Bounded by Analysis + (05:14:57, 12 December 2024)
- ML20137B890 + (05:14:58, 12 December 2024)
- ML20137B887 + (05:14:59, 12 December 2024)
- B11638, Forwards Reviews of Integrated Safety Assessment Program Topics,Including 1.01 Re Gas Turbine Generator Start Logic mods,1.04 Re Reactor Water Cleanup Sys Pressure Interlock, 1.05 Re Ventilation Sys & 1.15 Re FSAR Update + (05:15:00, 12 December 2024)
- ML20137B885 + (05:15:00, 12 December 2024)
- ML20137B882 + (05:15:01, 12 December 2024)
- ML20137B881 + (05:15:01, 12 December 2024)
- ML20137B878 + (05:15:02, 12 December 2024)