Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14069A442 + (03:48:06, 11 January 2025)
- ML14069A447 + (03:48:06, 11 January 2025)
- ML14069A437 + (03:48:07, 11 January 2025)
- IR 05000331/2014404 + (03:48:08, 11 January 2025)
- L-14-105, Notification of Impracticality for the Third 10-Year Inservice Inspection Interval + (03:48:08, 11 January 2025)
- ML14069A417 + (03:48:09, 11 January 2025)
- W3F1-2012-0029, Registration of Cask Use + (03:48:12, 11 January 2025)
- W3F1-2011-0027, Update to Response to NRC Order EA-10-092 Regarding Independent Spent Fuel Storage Installations (ISFSI) + (03:48:13, 11 January 2025)
- W3F1-2012-0039, Notification of Registration Cask Use + (03:48:13, 11 January 2025)
- ML14069A410 + (03:48:14, 11 January 2025)
- ML14069A394 + (03:48:15, 11 January 2025)
- ML14069A409 + (03:48:15, 11 January 2025)
- ML14069A388 + (03:48:16, 11 January 2025)
- ML14069A392 + (03:48:16, 11 January 2025)
- ML14069A387 + (03:48:17, 11 January 2025)
- ML14069A383 + (03:48:18, 11 January 2025)
- ML14069A382 + (03:48:18, 11 January 2025)
- ML14069A349 + (03:48:19, 11 January 2025)
- 05000285/LER-2014-001, Regarding Reactor Shutdown Due to Sluice Gate Failure + (03:48:21, 11 January 2025)
- ML14069A337 + (03:48:22, 11 January 2025)
- ML14069A344 + (03:48:22, 11 January 2025)
- ML14069A331 + (03:48:23, 11 January 2025)
- ML14069A319 + (03:48:24, 11 January 2025)
- ML14069A320 + (03:48:24, 11 January 2025)
- ML14069A318 + (03:48:25, 11 January 2025)
- ML14069A309 + (03:48:26, 11 January 2025)
- NL-14-032, Supplemental Information to Proposed Changes to Indian Point 2 Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Over Pressure Requirements Indian Point Unit Number 2 + (03:48:27, 11 January 2025)
- ML14069A307 + (03:48:27, 11 January 2025)
- 05000272/LER-2014-001, Regarding High Energy Line Break Door Blocked Open During Maintenance Activity + (03:48:29, 11 January 2025)
- IR 05000305/2013011 + (03:49:01, 11 January 2025)
- ML14069A184 + (03:49:01, 11 January 2025)
- ML14069A181 + (03:49:02, 11 January 2025)
- ML14069A180 + (03:49:03, 11 January 2025)
- CP-201400231, Supplement to License Amendment Request 13-002 Revision to Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using Consolidated Line + (03:49:04, 11 January 2025)
- 05000499/LER-2013-004, South Texes Project, Unit 2 Regarding Manual Actuation of Main Steam Isolation Valves That Was Not Part of a Preplanned Sequence During Testing or Reactor Operation + (03:49:10, 11 January 2025)
- ML14069A173 + (03:49:10, 11 January 2025)
- LG-14-031, Special Report - Seismic Monitoring Instrumentation Inoperability Channel XE-VA- 102 + (03:49:11, 11 January 2025)
- ML14069A169 + (03:49:13, 11 January 2025)
- ML14069A167 + (03:49:13, 11 January 2025)
- ML14069A165 + (03:49:14, 11 January 2025)
- RNP-RA/14-0011, Revision to Response to Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident + (03:49:15, 11 January 2025)
- ML14069A130 + (03:49:16, 11 January 2025)
- L-2014-053, Enclosure 2 - Procedure C-200, Rev. 41, Offsite Dose Calculation Manual (Odcm) + (03:49:17, 11 January 2025)
- ML14069A121 + (03:49:20, 11 January 2025)
- GNRO-2014/00024, Response to Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request, Dated 2/6/2014 + (03:49:21, 11 January 2025)
- ML14069A091 + (03:49:21, 11 January 2025)
- RBG-47439, Withdrawal of Request for NRC Assistance for River Bend Station, Unit 1 + (03:49:25, 11 January 2025)
- ML14069A090 + (03:49:25, 11 January 2025)
- L-2014-024, Response to Request for Additional Information on License Renewal (Lr) Reactor Vessel Internals (Rvi) Inspection Program + (03:49:26, 11 January 2025)
- L-2014-034, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Report + (03:49:27, 11 January 2025)
- L-2014-037, Emergency Core Cooling Systems in Light Water Nuclear Power Reactors - 30 Day Special Report + (03:49:27, 11 January 2025)
- L-2014-040, Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 4 + (03:49:28, 11 January 2025)