Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138M130 + (23:46:42, 11 December 2024)
- ML20138M129 + (23:46:43, 11 December 2024)
- ML20138M128 + (23:46:43, 11 December 2024)
- ML20138M125 + (23:46:44, 11 December 2024)
- ML20138M121 + (23:46:45, 11 December 2024)
- ML20138M122 + (23:46:45, 11 December 2024)
- IR 05000309/1985033 + (23:46:46, 11 December 2024)
- ML20138M109 + (23:46:47, 11 December 2024)
- ML20138M116 + (23:46:47, 11 December 2024)
- ML20138M108 + (23:46:49, 11 December 2024)
- ML20138M105 + (23:46:50, 11 December 2024)
- ML20138M100 + (23:46:53, 11 December 2024)
- ML20138M099 + (23:46:54, 11 December 2024)
- ML20138M098 + (23:46:55, 11 December 2024)
- ML20138M094 + (23:46:55, 11 December 2024)
- ML20138M090 + (23:46:56, 11 December 2024)
- IR 05000219/1985021 + (23:46:57, 11 December 2024)
- ML20138M086 + (23:46:58, 11 December 2024)
- SNRC-1215, Forwards Executive Summary Rept,For Low Power Testing.Four Sys Will Require Retesting.Minor HPCI & RCIC Testing for Controls Tuning & Addl Testing on Reactor Vessel Water Level Instrumentation Will Proceed Following Outage + (23:46:58, 11 December 2024)
- ML20138M083 + (23:46:59, 11 December 2024)
- ML20138M076 + (23:47:00, 11 December 2024)
- ML20138M081 + (23:47:00, 11 December 2024)
- ML20138M072 + (23:47:01, 11 December 2024)
- ML20138M069 + (23:47:02, 11 December 2024)
- ML20138M071 + (23:47:02, 11 December 2024)
- ML20138M066 + (23:47:03, 11 December 2024)
- ST-HL-AE-1555, Forwards Rept 3,Colorado River Entrainment & Impingement Monitoring Program,Phase 2 Studies,Jul-Sept 1985, Per Fes + (23:47:04, 11 December 2024)
- ML20138M062 + (23:47:04, 11 December 2024)
- 05000245/LER-1985-018, :on 850927,loss of Normal Power Occurred Causing Various Isolations & Sys Initiations.Caused by Hurricane Gloria + (23:47:06, 11 December 2024)
- B16121, Responds to NRC Re Violations Noted in Insp Rept 50-213/96-11.Corrective Actions:Cyapco Will Write New Procedure to Provide Guidance in Assessing Operability. Procedure Will Be Issued by 970630 + (23:47:08, 11 December 2024)
- ML20138M057 + (23:47:08, 11 December 2024)
- ML20138M054 + (23:47:09, 11 December 2024)
- ML20138M044 + (23:47:11, 11 December 2024)
- ML20138M048 + (23:47:11, 11 December 2024)
- ML20138M043 + (23:47:12, 11 December 2024)
- ML20138M035 + (23:47:13, 11 December 2024)
- ML20138M038 + (23:47:13, 11 December 2024)
- IR 05000443/1985015 + (23:47:16, 11 December 2024)
- ML20138M032 + (23:47:16, 11 December 2024)
- ML20138M030 + (23:47:17, 11 December 2024)
- ML20138M026 + (23:47:22, 11 December 2024)
- 05000266/LER-1997-006, :on 970120,refueling Cavity Drain Failed During Loca.Caused by Inadequate Evaluation of Original Design.Design of Refueling Cavity Drains Was Revised with Respect Capability to Withstand an Earthquake + (23:47:24, 11 December 2024)
- ML20138M020 + (23:47:25, 11 December 2024)
- ML20138M021 + (23:47:25, 11 December 2024)
- ML20138M015 + (23:47:26, 11 December 2024)
- ML20138M012 + (23:47:27, 11 December 2024)
- ML20138M011 + (23:47:28, 11 December 2024)
- ML20138M010 + (23:47:28, 11 December 2024)
- ML20138M007 + (23:47:29, 11 December 2024)
- ML20138M006 + (23:47:29, 11 December 2024)
- ML20138M001 + (23:47:30, 11 December 2024)
- ML20138L997 + (23:47:31, 11 December 2024)