MONTHYEARML20138M0381997-01-23023 January 1997 EN-97-007:on 970124,notice of Proposed Imposition of Civil Penalty in Amount of $650,000 Issued to Licensee.Action Based on Violations of Very Significant Regulatory Concern Associated W/Potential Common Mode Failure of Heat Sink ML20058E8261993-11-12012 November 1993 EN-93-112:on 931117,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $112,500 Issued to Licensee.Action Based on Radiation Protection Violations During Disassembly of Reactor Vessel Head ML20138A6941986-03-14014 March 1986 EN-86-013:on 860319,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000 Will Be Issued Based on Failure by Licensee to Properly Evaluate ECCS Div 1 Operability During Maint of Min Flow Valve ML20198E8331985-11-0505 November 1985 EN-85-077:on 851108,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $37,500 Will Be Issued to Util Based on Violation Involving Failure to Maintain Adequate Control Over Security Badge Sys ML20137Z0871985-09-24024 September 1985 EN-85-067:notice of Violation & Proposed Imposition of Civil Penalty in Amount of $125,000 Will Be Issued on or About 850927.Action Due to Three Failures to Ensure That Mods Performed on safety-related Sys Adequately Controlled 1997-01-23
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000373/19990151999-10-0606 October 1999 Insp Repts 50-373/99-15 & 50-374/99-15 on 990729-0916.One Violation Noted & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000373/19990141999-09-0808 September 1999 Insp Repts 50-373/99-14 & 50-374/99-14 on 990809-13.No Violations Noted.Major Areas Inspected:Quality of Emergency Preparedness Program,Related Audits & Emergency Response Facilities & Equipment IR 05000373/19990131999-08-25025 August 1999 Insp Repts 50-373/99-13 & 50-374/99-13 on 990804-06 & 09-11. No Violations Noted.Major Areas Inspected:Effectiveness of Licensee Fire Protection Program IR 05000373/19990121999-08-17017 August 1999 Insp Repts 50-373/99-12 & 50-374/99-12 on 990623-0728.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000373/19990111999-07-14014 July 1999 Insp Repts 50-373/99-11 & 50-374/99-11 on 990614-18.No Violations Noted.Major Areas Inspected:Routine,Announced Insp Assessed Effectiveness of Licensee Solid Radioactive Waste (Radwaste) Mgt & Transportation Program IR 05000373/19990041999-07-13013 July 1999 Insp Repts 50-373/99-04 & 50-374/99-04 on 990513-0622.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000373/19990031999-05-19019 May 1999 Insp Repts 50-373/99-03 & 50-374/99-03 on 990401-0512.Two Violations Noted & Being Treated as non-cited Violation. Major Areas Inspected:Aspects of Licensee Operation,Maint, Engineering & Plant Support IR 05000373/19990101999-05-14014 May 1999 Insp Repts 50-373/99-10 & 50-374/99-10 on 990419-23. Violations Noted.Major Areas Inspected:Security Procedures & Documentation,Staff Knowledge & Performance,Security Force Training & Qualification & Quality Assurance in Security IR 05000373/19990091999-05-0303 May 1999 Insp Repts 50-373/99-09 & 50-374/99-09 on 990406-09.No Violations Noted.Major Areas Inspected:Operational & Outage Radiation Protection Program IR 05000373/19990071999-05-0303 May 1999 Insp Repts 50-373/99-07 & 50-374/99-07 on 990329-0402. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000373/19990081999-04-20020 April 1999 Insp Repts 50-373/99-08 & 50-374/99-08 on 990311-26.No Violations Noted.Major Areas Inspected:Review of Engineering Changes & Plant Matl Condition in Preparation for re-start of Unit 2 IR 05000373/19990021999-04-16016 April 1999 Insp Repts 50-373/99-02 & 50- 374/99-02 on 990217-0331.Non- Cited Violation Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support PNO-III-99-020, on 990409,Unit 2 Had Been Shut Down Since Sept 1996 for Refueling Outage That Was Extended in Order to Address Extensive Equipment Condition.Util Completed Comprehensive Corrective Action Program1999-04-13013 April 1999 PNO-III-99-020:on 990409,Unit 2 Had Been Shut Down Since Sept 1996 for Refueling Outage That Was Extended in Order to Address Extensive Equipment Condition.Util Completed Comprehensive Corrective Action Program ML20205D7051999-04-0202 April 1999 Notice of Violation from Insp & Investigation Concluded on 981119.Violation Noted:On 980511,supervisor Employed by Raytheon Corp Contractor at Lasalle,Confirmed Odor of Alcohol on Employee & Failed to Perform for-cause FFD Test ML20205D5891999-03-29029 March 1999 Notice of Violation from Insp & Investigation Concluded on 981119.Violation Noted:On 980511,supervisor Employed by Raytheon Corp Contractor at Lasalle,Confirmed Odor of Alcohol on Employee & Failed to Have Require for-cause Test IR 05000373/19990011999-03-10010 March 1999 Insp Repts 50-373/99-01 & 50-374/99-01 on 990106-0216.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000373/19980231999-02-0202 February 1999 Insp Repts 50-373/98-23 & 50-374/98-23 on 981121-990105.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000373/19980261998-12-18018 December 1998 Insp Repts 50-373/98-26 & 50-374/98-26 on 981026-1106.No Violations Noted.Major Areas Inspected:Engineering & Assessment of Actions Planned or Completed to Address Number of Events Discussed in LERs IR 05000373/19980221998-12-17017 December 1998 Insp Repts 50-373/98-22 & 50-374/98-22 on 981010-1120.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000373/19980251998-12-16016 December 1998 Insp Repts 50-373/98-25 & 50-374/98-25 on 981102-06.No Violations Noted.Major Areas Inspected:Findings & Conclusions from Special Insp of Licensee Operator Workaround Program IR 05000373/19980211998-11-0707 November 1998 Insp Repts 50-373/98-21 & 50-374/98-21 on 980901-1009.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support PNO-III-98-047, on 981005,diver Lost Consciousness While in Unit 2 Suppression Pool.Diver Received Minor Contamination on Hair During Removal of Mask & Diving Suit.Diver Was Successfully Decontaminated1998-10-0606 October 1998 PNO-III-98-047:on 981005,diver Lost Consciousness While in Unit 2 Suppression Pool.Diver Received Minor Contamination on Hair During Removal of Mask & Diving Suit.Diver Was Successfully Decontaminated IR 05000373/19980191998-09-24024 September 1998 Insp Repts 50-373/98-19 & 50-374/98-19 on 980716-0831.No Violations Noted.Major Areas Inspected:Plant Operations, Maint,Engineering & Plant Support IR 05000373/19980201998-09-0808 September 1998 Insp Repts 50-373/98-20 & 50-374/98-20 on 980812-13. Non-cited Violation Noted.Major Areas Inspected: Circumstances Surrounding 980723 Incident Re Transfer of Radioactive Samples from Storage Areas on Refuel Floor IR 05000373/19980171998-09-0202 September 1998 Insp Repts 50-373/98-17 & 50-374/98-17 on 980713-17.No Violations Noted.Major Areas Inspected:Security Program Aspect of Plant Support ML20237A5901998-08-0707 August 1998 Notice of Violation from Insp on 980713-16.Violation Noted: on 980526,two Construction Laborers Permitted to Enter Unit 2 a Reactor Water Cleanup Heat Exchanger Room,W/O Satisfying Provisions of TS 6.1.1.1 IR 05000373/19980181998-08-0707 August 1998 Insp Repts 50-373/98-18 & 50-374/98-18 on 980713-16. Violations Noted.Major Areas Inspected:Effectiveness of Aspects of Radiation Protection Program IR 05000373/19980151998-07-24024 July 1998 Insp Repts 50-373/98-15 & 50-374/98-15 on 980706-21. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering Performance Areas ML20236U3841998-07-24024 July 1998 Notice of Violation from Insp on 980706-21.Violation Noted: as of 980717,testable Valves 1FP-160A,160B,161,236 & 234 in Fire Protection Sys Lines That Supply Fire Suppression Water to Control Room Not Cycled in Preceding 12 Months PNO-III-98-037, on 980724,Region III Issued Ltr to Util Indicating Sufficient Improvements Made to Support Unit 1 Restart.Unit 2 Will Remain Shut Down for Continuing Mods & Performance Improvement Activities1998-07-24024 July 1998 PNO-III-98-037:on 980724,Region III Issued Ltr to Util Indicating Sufficient Improvements Made to Support Unit 1 Restart.Unit 2 Will Remain Shut Down for Continuing Mods & Performance Improvement Activities IR 05000373/19980121998-07-23023 July 1998 Insp Repts 50-373/98-12 & 50-374/98-12 on 980511-0605.No Violations Noted.Major Areas Inspected:Operations & Effectiveness of Corrective Action Program IR 05000373/19980111998-07-23023 July 1998 Insp Repts 50-373/98-11 & 50-374/98-11 on 980605-0716.No Violations Noted.Major Areas Inspected:Plant Operations, Maint & Engineering IR 05000373/19980161998-07-23023 July 1998 Insp Repts 50-373/98-16 & 50-374/98-16 on 980626-0706.No Violations Noted.Major Areas Inspected:Observations of Crew Performance During Dynamic Simulator Requalification Exam IR 05000373/19980011998-07-0202 July 1998 Insp Repts 50-373/98-01 & 50-374/98-01 on 980423-0605. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plan Support ML20236L4541998-07-0202 July 1998 Notice of Violation from Insp on 980423-0605.Violation Noted:Two Operators,Performing OOS Tag Removal & Positioning of Control Room Ventilation Sys Dampers,Did Not Perform an apart-in-time Independent Verification ML20248M1271998-06-0505 June 1998 Notice of Violation from Insp on 980319-0421.Violations Noted:As of 980421,licensee Failed to Adequately Perform Combustible Loading Calculations Required by LaSalle Administrative Procedure 240-6,rev 36,dtd 970821 IR 05000373/19980051998-06-0505 June 1998 Insp Repts 50-373/98-05 & 50-374/98-05 on 980319-0421. Violations Noted.Major Areas Inspected:Engineering IR 05000373/19980091998-05-22022 May 1998 Insp Repts 50-373/98-09 & 50-374/98-09 on 980311-0422. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000373/19980041998-04-10010 April 1998 Insp Repts 50-373/98-04 & 50-374/98-04 on 980124-0310.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000373/19980081998-04-0101 April 1998 Insp Repts 50-373/98-08 & 50-374/98-08 on 980317-19.No Violations Noted.Major Areas Inspected:Evaluation of Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000373/19980071998-03-25025 March 1998 Partially Withheld Insp Repts 50-373/98-07 & 50-374/98-07 on 980223-27.No Violations Noted.Major Areas Inspected:Plant Support ML20217D0671998-03-23023 March 1998 Insp Repts 50-373/97-23 & 50-374/97-23 on 971222-980306. Violations Noted.Major Areas Inspected:Engineering ML20217D0611998-03-23023 March 1998 Notice of Violation from Insp on 971222-980306.Violation Noted:Licensee Failed to Ensure,Through Documentation & Other Activities That Applicable Design Basis & Regulatory Requirements Translated Into Procedures & Instructions IR 05000373/19980061998-03-18018 March 1998 Insp Repts 50-373/98-06 & 50-374/98-06 on 980223-27.No Violations Noted.Major Areas Inspected:Chemistry & Radiological Environ Monitoring Programs & Selected RP Program Activities IR 05000373/19970171998-02-27027 February 1998 Insp Repts 50-373/97-17OL & 50-374/97-17OL on 971020-24 & 980121-22.No Viiolations Noted.Major Areas Inspected:Review of Licensed RO & SRO Requalification Training Programs, Including Review of Written & Operating Exam Matls IR 05000373/19980031998-02-18018 February 1998 Insp Repts 50-373/98-03 & 50-374/98-03 on 980126-30.No Violations Noted.Major Areas Inspected:Review of Emergency Preparedness Program,An Aspect of Plant Support IR 05000373/19970221998-02-0505 February 1998 Insp Repts 50-373/97-22 & 50-374/97-22 on 971219-980123.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000373/19970181998-01-26026 January 1998 Insp Repts 50-373/97-18 & 50-374/97-18 on 971024-1218.No Violations Noted.Major Areas Inspected:Initial Operability Evaluation of Potential DG Cooling Water Piping Waterhammer ML20199F5291998-01-23023 January 1998 Insp Repts 50-373/97-20 & 50-374/97-20 on 971101-1218. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 07100101/20120181998-01-23023 January 1998 Notice of Violation from Insp on 971101-1218.Violation Noted:Activities Affecting Quality Were Not Accomplished IAW Applicable Procedures 1999-09-08
[Table view] |
Text
.
January 23, 1997
- EN 97-007 OFFICE OF ENFORCEMENT NOTIFICATION OF SIGNIFICANT ENFORCEMENT ACTION Licensee: Commonwealth Edison Company (EA 96-325)
LaSalle County Station Docket Nos. 50-373 and 50-374 Subiect: PROPOSED IMPOSITION OF CIVIL PENALTIES - $650.000 This is to inform the Commission that a Notice of Violation and Proposed Imposition of Civil Penalties in the amount of $650.000 will be issued on or about January 24, 1997, to the Commonwealth Edison Company. The action involves violations of very significant regulatory concern associated with the potential common mode failure of the ultimate heat sink caused by repetitive fouling of the service water system due to the injection of foam sealant material for the repair of minor cracks in the safety-related service water intake tunnel at LaSalle County Station. The action includes: (1) a Severity Level II problem for inadequate procedures and a failure to follow procedures during the application of the sealant, and inadequate corrective actions in response to repetitive fouling of the service water system and (2) a Severity Level III problem for five inadequate procedures related to testing, backwashing, and cleaning strainers in the safety-related emergency core cooling water and residual heat removal systems and non-essential service water systems and the failure to complete unreviewed safety question evaluations regarding strainer backwash flow and mesh size being different than that described in the FSAR. The violations, although unrelated, are reflective of particularly poor overall licensee performance.
In accordance with the Enforcement Policy, a base civil penalty in the amount of
$80,000 is considered for a Severity Level 11 problem. The staff decided to exercise enforcement discretion in accordance with Section VII.(a) of the Enforcement Policy and pro for the Severity Level II problem. posed civil penalties The proposed in the amount civil penalties of on are based $600.000
$100.000 for
, the procedural violations and $50,000 per day for the 10 day period that the units operated while the carrective action violation existed. In accordance with the Enforcement Policy, a base civil penalty in the amount of $50.000 is considered for a Severity Level III problem. The staff considered whether the licensee should be given credit for its corrective actions. Credit was not warranted ,
because the licensee's immediate corrective actions were not timely and NRC !
intervention was required Consideration of these factors resulted in civil 1 penalties being assessed at $660.000. The staff consulted with the Commission on this action in SECY 96-266. and the Commission approved the issuance of the action by SRM dated January ?3. 1997.
It should be noted that the licensee has not been specifically informed of the i enforcement action. The schedule of issuance and notification is:
Mailing of Notice January 24. 1997 Telephone Notification of Licensee January 24. 1997 The State of Illinois will be notified.
The licensee has thirty days from the date of the Notice in which to respond.
Following NRC evaluation of the response, the civil penalties may be remitted, mitigated, or imposed by Order.
Contacts: B. Clayton. EICS-RIII, 603-829-9666 J. Lieberman. OE. 301-415-2741 A3 9702250238 970123 p \
$97 7 PDR
i EN 97-007
- Chairman Jackson EDO OC RI RIV
, Conn. Rogers DEDR AE0D RII WCF0 i Comm. Dicus DEDS OP CTR RIII i Comm. Diaz OE NMSS j I Comm. McGaffigan OGC IRM- tLAll i SECY NRR OIG NUDOCS OCA 01 RES- PUBLIC i
PA SP ACRS .
l-IP PRELIMINARY INFORMATION NOT FOR PUBLIC DISCLOSURE UNTIL VERIFICATION THAT LICENSEE HAS RECEIVED ACTION l
i i
1 i
j i
i i
i i
l 4
1 l
1 i
l 1