Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NG-97-1148, Forwards Second ten-year ISI Requests for Relief from Exam Requirements Determined to Be Impractical to Perform + (15:33:20, 11 December 2024)
- ML20148T322 + (15:33:21, 11 December 2024)
- ML20148T320 + (15:33:21, 11 December 2024)
- ML20148T317 + (15:33:22, 11 December 2024)
- 05000282/LER-1997-007, :on 970429,both Trains of Spent Fuel Pool Special Ventilation Were Inoperable While Handling Load Over Spent Fuel.Caused by Misinterpretation of TS 3.8.D.3.Deleted TS Interpretation 3.8-3 & Revised Procedures + (15:33:24, 11 December 2024)
- 05000454/LER-1996-019-05, :on 961015,insp Revealed That Silt Accumulations Exceeded Surveillance Acceptance Criteria. Caused by Silt Buildup.Silt Buildup Acceptance Criteria in Surveillance Has Been Revised + (15:33:27, 11 December 2024)
- ML20148T309 + (15:33:29, 11 December 2024)
- NSD-NRC-97-5201, Responds to 970606 Telcon Re AP600 Design Certification, Addl Level of Detail for SSAR Subsection 9.4 & Sys Diagrams, Key Issue One.Roadmap to Addl SSAR Revs Required to Support NRC Review of Subsection 9.4 & SSAR Markups Included + (15:33:30, 11 December 2024)
- ML20148T298 + (15:33:34, 11 December 2024)
- ML20148T302 + (15:33:34, 11 December 2024)
- 05000454/LER-1997-012-04, :on 970529,required Plant to Be Shutdown within 48 H Per Ts.Caused by MSIV Active Train Not Being Repaired within 48 H.Four Way Valve Was Replaced + (15:33:36, 11 December 2024)
- ML20148T291 + (15:33:41, 11 December 2024)
- ML20148T289 + (15:33:42, 11 December 2024)
- ML20148T286 + (15:33:44, 11 December 2024)
- ML20148T281 + (15:33:45, 11 December 2024)
- ML20148T265 + (15:33:45, 11 December 2024)
- ML20148T262 + (15:33:46, 11 December 2024)
- ML20148T261 + (15:33:47, 11 December 2024)
- ML20148T257 + (15:33:49, 11 December 2024)
- ML20148T242 + (15:33:50, 11 December 2024)
- ML20148T235 + (15:33:51, 11 December 2024)
- ML20148T231 + (15:33:51, 11 December 2024)
- ML20148T229 + (15:33:52, 11 December 2024)
- ML20148T224 + (15:33:53, 11 December 2024)
- ML20148T221 + (15:33:54, 11 December 2024)
- ML20148T217 + (15:33:58, 11 December 2024)
- ML20148T212 + (15:33:59, 11 December 2024)
- ML20148T196 + (15:34:05, 11 December 2024)
- ML20148T191 + (15:34:06, 11 December 2024)
- ML20148T189 + (15:34:07, 11 December 2024)
- ML20148T187 + (15:34:08, 11 December 2024)
- 05000277/LER-1981-013, Forwards LER 81-013/01T-0.Provides Narrative Description of 810203 Occurrence Re Failure of Valves to Meet Seismic Qualification Requirements + (15:34:09, 11 December 2024)
- ML20148T178 + (15:34:11, 11 December 2024)
- 05000382/LER-1997-019, :on 970529,non-compliance with TS 3.3.3.6 for Containment Isolation Valve Position Indication Was Noted. Caused by Misinterpretation of Requirements of RG 1.97. Revised Submittal to NRC + (15:34:13, 11 December 2024)
- ML20148T173 + (15:34:14, 11 December 2024)
- ML20148T171 + (15:34:15, 11 December 2024)
- 05000286/LER-1989-013, Forwards LER 89-013-00 in Accordance W/Requirements of 10CFR50.73 + (15:34:17, 11 December 2024)
- ML20148T162 + (15:34:18, 11 December 2024)
- ML20148T160 + (15:34:19, 11 December 2024)
- ML20148T156 + (15:34:26, 11 December 2024)
- ML20148T155 + (15:34:27, 11 December 2024)
- ML20148T154 + (15:34:28, 11 December 2024)
- ML20148T153 + (15:34:29, 11 December 2024)
- ML20148T152 + (15:34:30, 11 December 2024)
- ML20148T148 + (15:34:31, 11 December 2024)
- ML20148T143 + (15:34:32, 11 December 2024)
- ML20148T139 + (15:34:33, 11 December 2024)
- ML20148T142 + (15:34:33, 11 December 2024)
- ML20148T136 + (15:34:34, 11 December 2024)
- ML20148T134 + (15:34:35, 11 December 2024)
- ML20148T131 + (15:34:35, 11 December 2024)