Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20155D127 + (03:00:41, 11 December 2024)
- ML20155D125 + (03:00:42, 11 December 2024)
- ML20155D123 + (03:00:43, 11 December 2024)
- CY-98-062, Updates Info of Historical Nature in Response to Both NRC Historical Review Rept & NRC Insp Rept 50-213/97-11 Open Items + (03:00:44, 11 December 2024)
- ML20155D122 + (03:00:44, 11 December 2024)
- ML20155D116 + (03:00:45, 11 December 2024)
- ML20155D115 + (03:00:46, 11 December 2024)
- ML20155D113 + (03:00:47, 11 December 2024)
- ML20155D114 + (03:00:47, 11 December 2024)
- ML20155D112 + (03:00:48, 11 December 2024)
- 05000338/LER-1988-016, :on 880513,recirculation Spray HX Not Placed in Dry Layup as Stated in Ufsar.Reviews to Allow Wet Layup May Not Have Completely Accounted for Biological Fouling. Operations Standing Order Issued + (03:00:51, 11 December 2024)
- ML20155D108 + (03:00:52, 11 December 2024)
- ML20155D110 + (03:00:52, 11 December 2024)
- IR 05000313/1998020 + (03:00:54, 11 December 2024)
- ML20155D102 + (03:00:55, 11 December 2024)
- ML20155D106 + (03:00:55, 11 December 2024)
- ML20155D101 + (03:00:56, 11 December 2024)
- ML20155D098 + (03:00:57, 11 December 2024)
- ML20155D100 + (03:00:57, 11 December 2024)
- ML20155D096 + (03:00:59, 11 December 2024)
- ML20155D094 + (03:01:00, 11 December 2024)
- IR 05000254/1988200 + (03:01:29, 11 December 2024)
- ML20155D092 + (03:01:33, 11 December 2024)
- ML20155D090 + (03:01:34, 11 December 2024)
- ML20155D086 + (03:01:35, 11 December 2024)
- ML20155D085 + (03:01:37, 11 December 2024)
- 05000374/LER-1988-006, :on 880513,Technical Surveillance LTS-500-12 Re Loose Parts Monitor Functional Test Not Performed as Required.Caused by Personnel Error.Surveillance Immediately Performed + (03:01:43, 11 December 2024)
- ML20155D082 + (03:01:44, 11 December 2024)
- SVP-98-328, Summary Rept of Changes,Tests & Experiments Completed, Including SEs Covering Period of 971001-980715,per 10CFR50.59 & 10CFR50.71(e).With + (03:01:46, 11 December 2024)
- ML20155D079 + (03:01:47, 11 December 2024)
- 05000333/LER-1998-011, :on 980929,failure to Meet Drywell Continuous Atmosphere Monitoring Sys TS Surveillance Test Requirements Were Noted.Caused by Deficient Tp.Declared Both Channels of CAM Sys Inoperable.With + (03:01:54, 11 December 2024)
- ML20155D073 + (03:01:56, 11 December 2024)
- 05000374/LER-1985-032, :on 850524,discovered That Delta Temp Leak Detection for Divs 1 & 2 of RHR Rooms Improperly Designed. Caused by Failure of Engineers to Reflect Unit 1 Changes in Unit 2 Design.Sensors Relocated + (03:01:58, 11 December 2024)
- 05000341/LER-1988-020, :on 880508,incorrect HPCI Surveillance Test Procedure Performed Causing Reactor Scram.Procedure Intended to Be Performed in Cold Shutdown or Refueling Condition. Procedure 24.202.04 Revised + (03:02:00, 11 December 2024)
- ML20155D067 + (03:02:02, 11 December 2024)
- ML20155D063 + (03:02:03, 11 December 2024)
- ML20155D062 + (03:02:03, 11 December 2024)
- ML20155D060 + (03:02:04, 11 December 2024)
- ML20155D059 + (03:02:05, 11 December 2024)
- ML20155D054 + (03:02:09, 11 December 2024)
- ML20155D055 + (03:02:09, 11 December 2024)
- ML20155D052 + (03:02:10, 11 December 2024)
- ML20155D051 + (03:02:11, 11 December 2024)
- 05000352/LER-1988-017, :on 880509,reactor Encl Isolation & Nssss Group VI a & B Isolations Occurred.Caused by Component Failure. Instrument Air Supply to SV-76-144A Closed Following Second Reactor Encl Isolation + (03:02:17, 11 December 2024)
- ML20155D049 + (03:02:18, 11 December 2024)
- ML20155D048 + (03:02:19, 11 December 2024)
- ML20155D045 + (03:02:20, 11 December 2024)
- ML20155D044 + (03:02:20, 11 December 2024)
- IR 05000285/1998017 + (03:02:21, 11 December 2024)
- ML20155D042 + (03:02:22, 11 December 2024)
- JPN-88-027, Proposed Tech Spec 3.11.B.1,clarifying Term Compartment & Eliminating Conflict Between Tech Specs 3.11.B.1 & 4.11.B.1 Re Crescent Area Ventilation Operability & Surveillance Testing.Util Safety Evaluation of Proposed Change Encl + (03:02:23, 11 December 2024)