ML20155D114

From kanterella
Jump to navigation Jump to search
Forwards Suppl 9 to LAR Re Conformance of Administrative Controls Section 6 to Guidance of Standard Ts.Nsp Proposes Implementation Date of 990901 for Lar,Which Would Be Approx 90 Days After Unit 1 1999 Outage
ML20155D114
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/30/1998
From: Sorensen J
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20155D117 List:
References
NUDOCS 9811030115
Download: ML20155D114 (2)


Text

e v

Northern states Power Company 1717 Wakonade Dr. E.

Welch. MN 55089 Telephone 651-388-1121 l

l October 30,1998 10 CFR Part 50 Section 50.90 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Supplement 9 to License Amendment Request Dated December 14,1995 Conformance of Administrativa Controls Section 6 to the Guidance of Standard Technical Specifications

Reference:

1)

Letter from M D Wadley, VP Nuclear Generation, Northern States Power Company to USNRC Document Control Desk, dated September 26,1997, Project Plans for USAR Review Project and J

Conversion to improved Technical Specifications (ITS)"

It is the understanding of Northern States Power Company (NSP) that the subject license amendment request may be issued in the near future by the NRC. When this license amendment request was originally submitted, NSP requested 90 days 4)g/

j for implementation. At that time NSP did not envision that the license amendment would be issued on the eve of "back-to-back" refueling outages concurrent with an USAR upgrade project and an Improved Technical Specification conversion project, Reference 1. Thus, NSP proposes an implementation date of September 1,1999 for this license amendment request which would be approximately 90 days after the Unit 1 1999 outage.

NSP requests that the NRC issue the subject license amendment as soon as practical to resolve some outstanding issues, facilitate the improved Technical Specifications conversion project and reduce the backlog of license amendments.

l However, in the interests of effectively managing implementation of this license amendment along with the other site activities, NSP proposes to extend the 9811030115 981030 PDR ADOCK 05000282 P

PDR

USNRC i

10/30/98 Pag 3 2 of 2 implementation date for this license amendment to September 1,1999. This would allow the Pl staff approximately 90 days for implementation of the license amendment after completion of the Unit 1 refueling outage.

Additionally, NSP proposes to revise License Condition 7 implementation date to match the license amendment as fo: lows:

)

7.

Relocate current Technical Specification 4.6.A.1.c, Diesel Fuel Oil Testing, requirements to the Diesel Fuel Oil Testing Program.

Implementation Date: September 1,1999.

A revised Safety Evaluation, Significant Hazards Determination and Environmental Assessment have not been submitted with the changes proposed by this letter since these evaluations, as originally presented in the December 14,1995 submittal, continue to bound the proposed license amendment as modified by this supplement.

If you have any questions related to this information in support of the subject license amendment request, please contact myself or Dale Vincent at 612-388-1121.

/

' Af4v\\

Joel P. Sorensen Plant Manager, Prairie Island Nucleer Generating Plant

Attachment:

Affidavit c:

Regional Administrator-111, NRC NRR Project Manager, NRC Senior Resident inspector, NRC State of Minnesota Attn: Kris Sanda J E Silberg i