Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000250/2015404 + (14:20:32, 10 January 2025)
- HNP-15-040, Transmittal of Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program + (14:20:33, 10 January 2025)
- ML15236A207 + (14:20:34, 10 January 2025)
- ML15236A196 + (14:20:35, 10 January 2025)
- ML15236A161 + (14:20:37, 10 January 2025)
- RS-15-231, Supplemental Information in Support of Request for a License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink + (14:20:38, 10 January 2025)
- ML15236A142 + (14:20:42, 10 January 2025)
- ML15236A134 + (14:20:43, 10 January 2025)
- TAC:4704 + (14:20:43, 10 January 2025)
- ML15236A130 + (14:20:45, 10 January 2025)
- ML15236A127 + (14:20:45, 10 January 2025)
- ML15236A125 + (14:20:46, 10 January 2025)
- ML15236A120 + (14:20:47, 10 January 2025)
- ML15236A089 + (14:20:48, 10 January 2025)
- ML15236A076 + (14:20:49, 10 January 2025)
- ML15236A082 + (14:20:49, 10 January 2025)
- ML15236A067 + (14:20:50, 10 January 2025)
- ML15236A058 + (14:20:51, 10 January 2025)
- RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors + (14:20:52, 10 January 2025)
- ML15236A033 + (14:20:55, 10 January 2025)
- ML15236A018 + (14:20:56, 10 January 2025)
- NL-15-092, Reply to Request for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application, Set 2015-01 + (14:20:57, 10 January 2025)
- AEP-NRC-2015-82, Authorization to Discharge, Groundwater Discharge Permit GW1810102 + (14:21:01, 10 January 2025)
- ML15236A015 + (14:21:01, 10 January 2025)
- CP-201500810, Compliance with NRC Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, Response to Request for Additional Information (Order Number EA-12-051) + (14:21:02, 10 January 2025)
- JAFP-15-0103, Core Operating Limits Report, Revision 29 (Cycle 22) + (14:21:03, 10 January 2025)
- ML15236A007 + (14:21:04, 10 January 2025)
- ML15236A006 + (14:21:05, 10 January 2025)
- ML15236A005 + (14:21:06, 10 January 2025)
- NL-15-1461, Submittal of 10 CFR 71.95 Report on Potential Issues Involving Radwaste Cask 8-120B + (14:21:06, 10 January 2025)
- ML15233A518 + (14:21:07, 10 January 2025)
- ML15233A495 + (14:21:08, 10 January 2025)
- LIC-15-0053, License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative Changes + (14:21:09, 10 January 2025)
- ML15233A491 + (14:21:10, 10 January 2025)
- 05000263/LER-2015-004, Regarding Past Inoperability of Turbine Stop Valve Scram Function Exceeded Technical Specification Requirements + (14:21:13, 10 January 2025)
- OI 4-2014-019, Closure of Invesigation (OI 4-2014-019) + (14:21:13, 10 January 2025)
- ML15233A449 + (14:21:21, 10 January 2025)
- ML15233A448 + (14:21:24, 10 January 2025)
- IR 05000373/2015009 + (14:21:28, 10 January 2025)
- ML15233A430 + (14:21:29, 10 January 2025)
- ML15233A421 + (14:21:30, 10 January 2025)
- L-2015-194, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA- 12-051) + (14:21:31, 10 January 2025)
- ML15233A419 + (14:21:31, 10 January 2025)
- L-2015-193, Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (14:21:32, 10 January 2025)
- 05000397/LER-2015-005, Regarding Reactor Pressure Vessel Level Indication Switch Failures + (14:21:35, 10 January 2025)
- ML15233A379 + (14:21:36, 10 January 2025)
- ML15233A360 + (14:21:37, 10 January 2025)
- ML15233A307 + (14:21:38, 10 January 2025)
- ML15233A353 + (14:21:38, 10 January 2025)
- ML15233A306 + (14:21:39, 10 January 2025)
- NL-15-1569, 5 to Emergency Plan + (14:21:40, 10 January 2025)