Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16327A396 + (00:00:46, 10 January 2025)
- ML16327A378 + (00:00:47, 10 January 2025)
- ML16327A377 + (00:00:47, 10 January 2025)
- ML16327A370 + (00:00:49, 10 January 2025)
- ML16327A270 + (00:00:50, 10 January 2025)
- ML16327A318 + (00:00:50, 10 January 2025)
- ML16327A190 + (00:00:51, 10 January 2025)
- ML16327A184 + (00:00:52, 10 January 2025)
- ML16327A183 + (00:00:53, 10 January 2025)
- ML16327A110 + (00:00:54, 10 January 2025)
- ML16327A103 + (00:00:55, 10 January 2025)
- ML16327A093 + (00:00:56, 10 January 2025)
- SBK-L-16174, Part 21 Notification Re Westinghouse Life Line D Type Lac Induction Motor Model Hsdp 4000V, 700hp + (00:00:56, 10 January 2025)
- ML16327A068 + (00:00:57, 10 January 2025)
- 05000237/LER-2016-003, Regarding Control Room Emergency Ventilation System Charcoal Filter Bank Failure to Meet the Methyl Iodide Penetration Acceptance Criteria + (00:01:00, 10 January 2025)
- L-16-330, Notification of Completion of License Renewal Commitments + (00:01:00, 10 January 2025)
- SBK-L-16190, Response to Request for Supplemental Information Regarding License Amendment Request 16-01, Request to Extend Containment Leakage Test Frequency + (00:01:01, 10 January 2025)
- 05000219/LER-2016-004, Regarding Technical Specification Violation Due to Main Steam Safety Valve Setpoint Discovered Out of Tolerance + (00:01:04, 10 January 2025)
- ML16327A062 + (00:01:04, 10 January 2025)
- RS-16-213, Response to Request for Additional Information Regarding Relief Request 13R-17 to Extend the Reactor Pressure Vessel Inservice Inspection Interval + (00:01:05, 10 January 2025)
- ML16327A056 + (00:01:06, 10 January 2025)
- 05000278/LER-2016-001, Regarding Leak in High Pressure Coolant Injection Drain Pipe Results in a Loss of Safety Function + (00:01:08, 10 January 2025)
- ML16327A035 + (00:01:10, 10 January 2025)
- ML16327A034 + (00:01:11, 10 January 2025)
- ML16327A023 + (00:01:12, 10 January 2025)
- ML16327A032 + (00:01:12, 10 January 2025)
- ML16327A018 + (00:01:13, 10 January 2025)
- ML16326A451 + (00:01:13, 10 January 2025)
- ML16326A450 + (00:01:14, 10 January 2025)
- ML16326A447 + (00:01:18, 10 January 2025)
- IR 05000602/2016201 + (00:01:27, 10 January 2025)
- 05000397/LER-2016-002, Regarding Valve Closure Results in Momentary Increase in Secondary Containment Differential Pressure + (00:01:31, 10 January 2025)
- JAFP-16-0170, Response to Request for Additional Information (RAI) Regarding License Amendment Request to Revise Technical Specifications Section 5.5.6 for Extension of Type a and Type C Leak Rate Test Frequencies - Supplement 1 + (00:01:33, 10 January 2025)
- GO2-16-155, Response to Request for Additional Information for License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in Technical Specification 2.1.1, Reactor Core Sls from the Reactor Systems Branch + (00:01:34, 10 January 2025)
- ML16326A437 + (00:01:34, 10 January 2025)
- ML16326A414 + (00:01:35, 10 January 2025)
- ML16326A381 + (00:01:36, 10 January 2025)
- ML16326A353 + (00:01:37, 10 January 2025)
- ML16326A356 + (00:01:37, 10 January 2025)
- ML16326A335 + (00:01:38, 10 January 2025)
- NLS2016063, Enclosure 2: Response to Areas of Requested Information in Appendix a of Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools (Non-Proprietary Version) + (00:01:39, 10 January 2025)
- ML16326A274 + (00:01:40, 10 January 2025)
- ML16326A283 + (00:01:40, 10 January 2025)
- BYRON 2016-0108, Revision to Byron Station Site Security Plan, Safeguards Contingency Plan, Training and Qualification Plan, and Independent Spent Fuel Storage Installation Plan, Revision 15 + (00:01:41, 10 January 2025)
- ML16326A270 + (00:01:42, 10 January 2025)
- ML16326A268 + (00:01:47, 10 January 2025)
- ML16326A267 + (00:01:48, 10 January 2025)
- 05000298/LER-2016-003, Scaffold Construction Places Plant in a Condition Prohibited by Technical Specifications + (00:01:51, 10 January 2025)
- ML16326A258 + (00:01:52, 10 January 2025)
- NL-16-1026, Units 1 & 2, Vogtle Electric Generating Plant- Units 1 & 2 - Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements + (00:01:53, 10 January 2025)
- ML16326A254 + (00:01:54, 10 January 2025)
- NL-16-2491, Cycle 28 Core Operating Limits Report + (00:01:55, 10 January 2025)