Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19322E891 + (05:26:43, 1 January 2025)
- ML19322E892 + (05:26:43, 1 January 2025)
- ML19322E890 + (05:26:44, 1 January 2025)
- ML19322E889 + (05:26:44, 1 January 2025)
- ML19322E888 + (05:26:50, 1 January 2025)
- ML19322E887 + (05:26:56, 1 January 2025)
- ML19322E885 + (05:26:57, 1 January 2025)
- ML19322E883 + (05:27:03, 1 January 2025)
- ML19322E884 + (05:27:03, 1 January 2025)
- ML19322E882 + (05:27:04, 1 January 2025)
- ML19322E881 + (05:27:06, 1 January 2025)
- ML19322E879 + (05:27:07, 1 January 2025)
- ML19322E878 + (05:27:13, 1 January 2025)
- 05000295/LER-1980-011-03, /03L-0:on 800224,while Performing Daily Radiation Monitor Operability Check,Pto App N,Unit 1 Passive Gas Failure Radiation monitor,1RTPR15 Failed Low & Could Not Be Reset.Caused by Defective Transistor ZN3638 + (05:27:19, 1 January 2025)
- ML19322E876 + (05:27:25, 1 January 2025)
- ML19322E874 + (05:27:31, 1 January 2025)
- ML19322E872 + (05:27:37, 1 January 2025)
- 05000327/LER-1980-002-01, /01T-0:on 800306,contents of Task Decontamination Collector Tank Discharged Via Liquid Radwaste Effluent Line to Cooling Tower Blowdown W/O Flow Estimates Being Performed.Caused by Misunderstanding of Tech Specs + (05:27:39, 1 January 2025)
- 05000295/LER-1980-011, Forwards LER 80-011/03L-0 + (05:27:46, 1 January 2025)
- ML19322E868 + (05:27:47, 1 January 2025)
- 05000249/LER-1980-008-03, /03L-0:on 800307,during Refueling Outage While Performing Temp Switch Calibr Surveillance,Three Temp Switches Failed to Trip Per Specs.Caused by Drift,Excessive Gap Between Actuator & Switch Plunger or Dirty Contacts + (05:27:49, 1 January 2025)
- 05000327/LER-1980-002, Forwards LER 80-002/01T-0 + (05:27:51, 1 January 2025)
- ML19322E863 + (05:28:00, 1 January 2025)
- ML19322E858 + (05:28:15, 1 January 2025)
- 05000321/LER-1980-020-03, /03L-0:on 800308,during Normal operation,180 Gallons of Radwaste Was Released to River W/O Prior Analysis Per Tech Specs.Caused by Technician Error. Reanalysis Showed ETS Not Exceeded + (05:28:17, 1 January 2025)
- ML19322E856 + (05:28:18, 1 January 2025)
- 05000254/LER-1980-005-03, /03L-0:on 800224,while Performing Misv Closure Timing,Valve AD 1-203-1B Failed to Close When Control Switch Was Operated.Caused by Blockage of Exhaust Restrictor on on Pilot Valve.Exhaust Restrictor Cleaned + (05:28:20, 1 January 2025)
- 05000265/LER-1980-006-01, /01T-0:on 800308,while Performing Reactor Vessel Pressure Test,Several Crack Indications Were Discovered in Pipe to Elbow Welds.Cause Not Determined.Affected Pipe Sections Will Be Replaced W/Carbon Steel Piping + (05:28:24, 1 January 2025)
- 05000321/LER-1980-020, Forwards LER 80-020/03L-0 + (05:28:25, 1 January 2025)
- 05000313/LER-1980-007-01, /01T-0:on 800314,B&W Advised That Mating Wear Rings on Double Suction Pump Could Cause Pump Failure During Accident Conditions.Caused by Failure to Document Design Revision on Pump Design Drawings + (05:28:27, 1 January 2025)
- 05000265/LER-1980-006, Forwards LER 80-006/01T-0 + (05:28:30, 1 January 2025)
- 05000313/LER-1980-007, Forwards LER 80-007/01T-0 + (05:28:39, 1 January 2025)
- ML19322E841 + (05:28:41, 1 January 2025)
- 05000366/LER-1980-020-03, /03L-0:on 800229,during Normal Operation,While Performing HPCI Exhaust Diaphragm Pressure Switch Surveillance,Two Switches Exceeded Tech Specs.Caused by Instrument Drift.Switches Recalibr + (05:28:43, 1 January 2025)
- 05000368/LER-1980-013-03, /03L-0:on 800229,during Mode 5 Operation,Reactor Cooling Sys Chloride Concentration Found to Be Approx 0.5 Ppm,Violating Tech Specs.Probably Caused by Batch Contaminated During Maint on Safety Injection Check Valve + (05:28:44, 1 January 2025)
- ML19322E838 + (05:28:51, 1 January 2025)
- 05000266/LER-1980-002-01, /01T-0:on 800311,during shutdown,800 Psi secondary-to-primary Hydrostatic Leak Test of B Steam Generator Revealed Tube R23C44 Leaking,Tube R8C37 Wet & Plug End R23C50 Wet.Tube Holes Will Be Weld Plugged + (05:28:52, 1 January 2025)
- 05000366/LER-1980-020, Forwards LER 80-020/03L-0 + (05:28:57, 1 January 2025)
- 05000368/LER-1980-013, Forwards LER 80-013/03L-0 + (05:28:59, 1 January 2025)
- ML19322E832 + (05:29:00, 1 January 2025)
- ML19322E830 + (05:29:01, 1 January 2025)
- ML19322E827 + (05:29:09, 1 January 2025)
- 05000366/LER-1980-027-03, /03L-0:on 800315,while Performing,Plant Svc Water Pump Auto Function Operability Surveillance,Isolation Valve 2P41-F316A Failed to Actuate to Isolation Position Upon Signal.Caused by Instrument Failure + (05:29:10, 1 January 2025)
- ML19322E825 + (05:29:11, 1 January 2025)
- ML19322E824 + (05:29:12, 1 January 2025)
- 05000366/LER-1980-027, Forwards LER 80-027/03L-0 + (05:29:13, 1 January 2025)
- 05000302/LER-1980-013-04, /04L-0:on 800304,more than Two Std Deviations Were Discovered Between Preoperational Study & Operational Study in Metabolic Function of Discharge Salt Marshes.Possibly Caused by Natural or Seasonal Variations + (05:29:15, 1 January 2025)
- ML19322E820 + (05:29:16, 1 January 2025)
- ML19322E818 + (05:29:16, 1 January 2025)
- ML19322E817 + (05:29:17, 1 January 2025)
- ML19322E815 + (05:29:18, 1 January 2025)