Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20248B890 + (23:36:32, 1 December 2024)
- ML20248B889 + (23:36:33, 1 December 2024)
- ML20248B887 + (23:36:34, 1 December 2024)
- ML20248B888 + (23:36:34, 1 December 2024)
- ML20248B886 + (23:36:35, 1 December 2024)
- PNO-III-89-062B, on 890927,judge Issued Temporary Restraining Order Barring City of West Chicago from Enforcing Ordinance Prohibiting Interstate Shipment of Radioactive Matls Into City.Ordinance Approved by City Council on 890920 + (23:36:36, 1 December 2024)
- ML20248B884 + (23:36:37, 1 December 2024)
- U-601540, Notifies That Mk Moren,Licensed Operator,Terminated Employment on 890915 + (23:36:37, 1 December 2024)
- ML20248B879 + (23:36:38, 1 December 2024)
- ML20248B877 + (23:36:39, 1 December 2024)
- ML20248B875 + (23:36:40, 1 December 2024)
- ML20248B874 + (23:36:41, 1 December 2024)
- ML20248B872 + (23:36:42, 1 December 2024)
- ML20248B873 + (23:36:42, 1 December 2024)
- RBG-30979, Ro:On 890504,trip of RHR Pump Occurred Due to Electrical Transient to Pump Protective Trip Circuitry.All Identified Surveillance Tests Requiring Fuses to Be Removed in Operational Condition 5 Revised + (23:36:43, 1 December 2024)
- ML20248B870 + (23:36:44, 1 December 2024)
- ML20248B867 + (23:36:44, 1 December 2024)
- IR 05000382/1989005 + (23:36:45, 1 December 2024)
- ML20248B864 + (23:36:46, 1 December 2024)
- ML20248B862 + (23:36:47, 1 December 2024)
- ML20248B861 + (23:36:47, 1 December 2024)
- HL-5634, Forwards Quadrennial Simulator Certification Rept, Per Requirements of 10CFR55.45(b)(5)(ii) + (23:36:48, 1 December 2024)
- ML20248B860 + (23:36:48, 1 December 2024)
- ML20248B857 + (23:36:49, 1 December 2024)
- ML20248B855 + (23:36:49, 1 December 2024)
- IR 05000443/1989001 + (23:36:50, 1 December 2024)
- ML20248B849 + (23:36:51, 1 December 2024)
- ML20248B847 + (23:36:52, 1 December 2024)
- ML20248B848 + (23:36:52, 1 December 2024)
- ML20248B846 + (23:36:53, 1 December 2024)
- ML20248B845 + (23:36:54, 1 December 2024)
- ML20248B838 + (23:36:58, 1 December 2024)
- ML20248B832 + (23:37:02, 1 December 2024)
- ML20248B831 + (23:37:03, 1 December 2024)
- ML20248B829 + (23:37:04, 1 December 2024)
- ML20248B830 + (23:37:04, 1 December 2024)
- AECM-89-0128, Responds to NRC 890522 Request for Addl Info Re Util 880819 Proposed Change to License NPF-29,per Generic Ltr 87-09.Util Analysis of 39 Action Statements Affected by Proposed Amend to Tech Spec 3.0.4 Submitted to NRC on 881214 + (23:37:08, 1 December 2024)
- ML20248B826 + (23:37:09, 1 December 2024)
- ML20248B823 + (23:37:10, 1 December 2024)
- ML20248B819 + (23:37:11, 1 December 2024)
- 05000334/LER-1998-021, :on 980324,discovered Gas Voids in Low Head Safety Injection Discharge Piping to Suction Piping of Charging/Head Safety Injection Pumps.Cause of Event Not Established.Procedures Will Be Revised + (23:37:13, 1 December 2024)
- BECO-89-073, Forwards Inservice Insp Exam Summary Rept, Conducted During Refuel Outage 7.Util Extending End of Current Inservice Insp Interval to 950630 + (23:37:15, 1 December 2024)
- ML20248B814 + (23:37:16, 1 December 2024)
- ML20248B811 + (23:37:17, 1 December 2024)
- B13377, Submits Justification for Continued Operation in Response to Failures of Several Individuals of NRC Requalification Exam, Per NUREG-1021 + (23:37:18, 1 December 2024)
- ML20248B809 + (23:37:19, 1 December 2024)
- ML20248B808 + (23:37:20, 1 December 2024)
- A08132, Responds to NRC Re Violations Noted in Insp Rept 50-423/89-04.Corrective Actions:Addl Assurances of Rosemount 1153 & 1154 Transmitter Operability Will Include Monitoring of Redundant Transmitters in Low Range Code to Detect Oil + (23:37:21, 1 December 2024)
- 05000440/LER-1989-010, :on 890328,elevated Temp Condition Confirmed to Exist within Upper Region of Drywell.Caused by Insufficient Insulation Surrounding Refuel Bellows Creating Radiant Heat Source.Reflective Insulation Installed + (23:37:22, 1 December 2024)
- ML20248B803 + (23:37:26, 1 December 2024)
- 05000321/LER-1989-004-02, :on 890307,24 H Surveillance Scheduled to Verify Integrity of Recirculation Sys Jet Pumps Delayed Due to Personnel Errors,Then Executed Incorrectly.Surveillance Satisfactorily Performed 2 H Later + (23:37:28, 1 December 2024)