Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000317/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000219/LER-1982-032, Forwards LER 82-032/03L-0.Detailed Event Analysis Encl +
- 05000339/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000272/LER-1982-032, Forwards LER 82-032/03L-0.Detailed Event Analysis Encl +
- 05000373/LER-1982-032, Forwards LER 82-032/03L-0.Detailed Event Analysis Encl +
- 05000259/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000338/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000325/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000311/LER-1982-032, Forwards LER 82-032/03L-0.Detailed Event Analysis Encl +
- 05000368/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000334/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000247/LER-1982-032, Forwards LER 82-032/01T-0 +
- 05000267/LER-1978-032, Forwards LER 78-032/03L-0 +
- 05000324/LER-1981-032, Forwards LER 81-032/03L-0 +
- 05000254/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000364/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000249/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000296/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000335/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000333/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000346/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000293/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000387/LER-1982-032, Forwards LER 82-032/01T-0 +
- 05000305/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000260/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000285/LER-1976-032, Summary of 761004 Telephone Communication on LER 76-32/01L Re Reactor Coolant Observed Spraying from Weld Area on Seal Leakoff Line on Reactor Coolant Pump RC-3C.Leakage Isolated by Manual Isolation Valve +
- 05000416/LER-1983-032, Forwards LER 83-032/03L-0 +
- 05000321/LER-1983-032, Forwards LER 83-032/03L-0 +
- 05000324/LER-1983-032, Forwards LER 83-032/03L-0 +
- 05000328/LER-1983-032, Forwards LER 83-032/03L-0 +
- 05000387/LER-1983-032, Forwards LER 83-032/03L-0 +
- 05000255/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000348/LER-1982-032, Forwards LER 82-032/03L-0 +
- 05000285/LER-1978-032, Forwards LER 78-032/03L-0 +
- 05000387/LER-1985-032-01, Forwards LER 85-032-01,describing RWCU Sys Isolation Valve Actuation.Rev Submitted to Incorporate Attachment 1, Simplified Drawing of RWCU Sys 1A Filter Demineralizer, Inadvertently Excluded from Initial Submittal +
- 05000423/LER-1996-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves +
- 05000155/LER-1978-032, Forwards LER 78-032/03L-0.W/o Encl +
- 05000336/LER-1997-032, Forwards LER 97-032-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970922.Commitment Made within Ltr,Listed +
- 05000245/LER-1997-032, Forwards LER 97-032-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970731,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed +
- 05000458/LER-1989-032, :on 890907,unplanned ESF Actuation Occurred During Surveillance Test Procedure STP-207-4536.Caused by Technician Failure to Properly Lift Lead.Trip Signal Reset, Sys Restored & Procedure Completed +
- 05000302/LER-1989-032, :on 890831,determined That Station Battery B Was Inoperable Due to Inadequate Testing Load Profile.Caused by Design Engineering Deficiencies.Temporary Battery Installed to Power TBP-10 +
- 05000414/LER-1988-032, :on 881124,automatic Start of Auxiliary Feedwater Pump 2A Occurred.Caused by Equipment Malfunction. Work Request 41991 initiated,2CF6 Repaired,Pump 2A Secured & Blowdown Isolation Realigned +
- 05000277/LER-1988-032-01, :on 881212,determined That Control Room Temp Could Exceed Design Basis During Emergency Operation.Noted During Exam of Concerns Stated in NRC Info Notice 88-061. Caused by Lack of Procedure.Procedure Revised +
- 05000461/LER-1989-032, :on 890731,operators Initiated Manual Scram Due to Difficulties W/Moisture Separator Reheater & High Pressure Feedwater Heater Sys.Caused by Personnel Error. Operators Provided W/Details of Event +
- 05000325/LER-1988-032, :on 881214,standby Gas Treatment a & B Train Maint Inlet Valves Only 5-10% Open.Caused by Design Deficiency.Plant Mods Completed & Training Session Provided. Part 21 Related +
- 05000219/LER-1988-032, Has Been Canceled.Resolution of LERs Missing from Lertrk/Scss/Dcs Discussed +
- 05000352/LER-1989-032-01, :on 890513,RWCU Isolation Occurred on Nuclear Steam Supply Shutoff Sys Group III Channels a & D High Differential Flow Isolation Signal.Caused by Sys Equipment Malfunctions.Isolation Reset +
- 05000352/LER-1989-032, :on 890512,full Reactor Protection Sys Scram Signal Generated During Performance of Main Turbine Control Valve Surveillance Testing.Caused by Procedural Inadequacy. Test Procedure Corrected +
- 05000245/LER-1987-032-01, :on 870811,first Stage Bypass Switches Failed to Meet Tech Spec Requirements.Caused by Setpoint Drift from Extended Periods of Depressurization.Switches Recalibrated to Conform to Tech Specs +
- 05000413/LER-1987-032, :on 870729,engineer Determined That Battery Banks in 125 Volt Dc Vital Instrumentation & Control Power Sys Inoperable.Caused by Mgt/Qa Deficiency.Intercell Resistance Readings Taken +